Ops team

93 percent rack cleaning

63 percent blanking pannel

Water soft for evaluation of cavtech and MIraga

Provision all cables waiting for implimentation date sept 2 to 3 10pm-9am

Lighting upgrade joint survey with FMG, all punchlist are OK and COC will be signature by FMG and DCO

Blackstone schedule on Aug 24, 2023- to be discuss if can do the job even if online

Project

Gen cons- 99.5 percent

ELEC- 98.67 %

Waterlines- testing completed. For schedule gravity test

Mech-99.53 %

Auxiliary works- 99.2%

Elevator-69.85%- on going si Otis

BMS and Cms- 73.2 percent

UPS, PACU, FAN wall- for schedule testing

August inspection of areas

69

C2 3f IR testing

3F energization of transformer

S&I

Training schedule for Esme Aug 22 & 23

BOSH Training(Tentative)

CDCP/CDCS already have link.

Vendor grading sheet detailed assessment for initial diagnosis and permanent solution
pM

Quarterly PM of HUwaei done

Esmee done

DCX water leak is not terminated

Genset rectification – after synch poannel

PACU9- frigo side waiting for the unit 2 weeks from now

Pending PM ASISi and KIlton