FORMS OF CONTRACT
Standard forms
Model forms
Modified forms
Ad hoc [because of situation / not planned in
advance]
Bespoke [specially drafted/ according to the
needs of individual project]
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 2/24
CHARACTERISTICS
Arrived at through a process of consultation & negotiation between representatives of
various sectors of the industry like professional institutions & contractors associations
The form set out the terms & conditions on which the contract between the parties are to be
executed
The terms & condition are generally suitable for a wide range of common projects or jobs
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 3/24
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 4/24
STANDARD FORMS OF CONTRACT
FIDIC Conditions
ICE Conditions
JKR/PWD MISCELLANEOUS
Source: Adapted from, Harban Singh KS, ³ Engineering and Construction Contracts
Management; Law and Principle´, 2002
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 5/24
B ACKGROUND
Historically, the initial set o f S tandard Forms were
drafted by the va rious government agencies for works in
the public sector i.e. earlier version of PWD f orm
modeled on the RIBA Form of Contract 1931 and the
6
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 6/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
Sub-Contractors.
7
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 7/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 8/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 9/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
10
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 10/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
·
alone subcontract and not back to back to ¶ ·
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 11/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
CIDB Forms
12
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 12/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
13
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 13/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
Private Sector
PAM
14
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 14/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
PAM
Origin
Rather than developing and drafting a new
standard form on its own, PAM in
collaboration with the ISM in 1969 adopted
1963 JCT Standard Form of Building
Contract (Reprinted 1968) with
modifications to be used for private sector
building works through traditional general
contracting contract procurement method
comprised:
15
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 15/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
16
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 16/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
PAM 1998
Usage
Essentially for :
1. 1. Private sector projects
2. 2. Building works
3. 3. Contracts undertaken through Traditional
General Contracting Procurement
17
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 17/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
Private Sector
18
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 18/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
Private Sector
M&E works
IEM Condition IEM.ME. For mechanical and
electrical work (First Edition 1994).
Sub contract? [absent]
19
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 19/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
IEM Forms
Origin
Due to rigorous/harsh and pitfalls of the
/PWD
JKR
PAM f orms for
f orms engineering of the
and unsuitability and
infrastructure projects, construction
engineering prof essionals attempted to
employ UK engineering forms i.e. ICE,
IMECHE, IEE, JCT and FIDIC forms with
modifications.
20
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 20/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
IEM Forms
Origin (cont·d)
The ´ modifications µ were sub ject to job
ific and ad
unccertainty,
spe hoc
inco basis.
nsisten anuds, lead
cy Th leading
ing to
construction disputes.
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 21/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
IEM Forms
Usage
22
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 22/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
International Contracts
FIDIC f amily
JCT Family
IEEE
IMechE
ECC
PPC 2000
23
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 23/24
5/12/2018 Sta nda rd For m of Contra c t 1 - slide pdf.c om
THANK YOU
http://slide pdf.c om/re a de r/full/sta nda rd-for m-of-c ontra c t-1 24/24