TRN ENERGY PVT LIMITED

2X300 MW POWER PLANT


CHECK LIST FOR PUMP
DATE PREVENTIVE EQUIPMENT NO.- PTW NO.
MAINTENANCE CHECK
LIST

1. PMONTHLY PREVENTIVE MAINTENANCE OF PUMP SYSTEM

Time:

EQUIPME
SL. NO. JOB DESCRIPTION
NT

1
CLEANING OF THE MACHINE  
2 CLEANING OF SUCTION STAINER
3 CLEANING OF PUMP CASING
4 CLEANING OF SUMP PIT
TIGHTNESS OF PIPE FLANGE
5
BOLTS
6 CHECK CONDITION OF NRV  
CHECK TIGHTNESS OF CASING
7 BOLTS  
PUMP 8 CHECK LOW LEVEL SENSOR
SYSTEM INDICATOR  
9 CHECK PUMPS CONDITION  
CHECK TIGHTNESS OF NUT
10 BOLTS OF PUMP & MOTOR

11 GREASING TO BE DONE IN ALL


POINTS
CHECK & CLEAN DISCHARGE
12 PIPE

RETURN PERMIT & TAKE TRAIL


13 RUN

Remarks-

MELCO INDIA PVT. LTD. TRNEPL


SIGNATURE SIGNATURE
NAME NAME