: Supply, Testing, Commissioning and Integration of Chilled Water System
Subject: BMS Data Point Schedule
2 Chillers 2
Chiller 1 Enable/Disable Command 1 To Chiller Panel 1.5mm Sq Single Core, Multistrand Cable 2
Chiller 1 Common Fault 1 From Chiller Panel Belden 5300 FE / 8760 1
Chilled 1 Water Flow Temperature 1 Chilled Water Temperature Sensor ‐ New (By Schneider) Belden 5300 FE / 8760 1
Chiller 1 Butterfly Valve Actuator Open/Close Command 1 To Butterfly Valve Actuator ‐ Newly added point 1.5mm Sq Single Core, Multistrand Cable 4
Chiller 1 Butterfly Valve Actuator Open/Close Status 1 From Butterfly Valve Actuator ‐ Newly added point Belden 5300 FE / 8760 1
Chiller 2 Enable/Disable Command 1 To Chiller Panel 1.5mm Sq Single Core, Multistrand Cable 2
Chiller 2 Common Fault 1 From Chiller Panel Belden 5300 FE / 8760 1
Chilled 2 Water Flow Temperature 1 Chilled Water Temperature Sensor ‐ New (By Schneider) Belden 5300 FE / 8760 1
Chiller 2 Butterfly Valve Actuator Open/Close Command 1 To Butterfly Valve Actuator ‐ Newly added point 1.5mm Sq Single Core, Multistrand Cable 4
Chiller 2 Butterfly Valve Actuator Open/Close Status 1 From Butterfly Valve Actuator ‐ Newly added point Belden 5300 FE / 8760 1
Chilled Water Common Supply Temperature 1 Chilled Water Temperature Sensor ‐ New (By Schneider) Belden 5300 FE / 8760 1
Chilled Water Common Return Temperature 1 Chilled Water Temperature Sensor ‐ New (By Schneider) Belden 5300 FE / 8760 1
Circuit 1 Header Pressure 1 Chilled Water Pressure Transmitter ‐ Exhaustisting Belden 5300 FE / 8760 2
Circuit 3 Suction Pressure 1 Chilled Water Pressure Transmitter ‐ Exhaustisting Belden 5300 FE / 8760 2
Chiller ‐ Line Voltage RY 2 From Chiller Panel (Point may no be available) Belden 5300 FE / 8760 2
# Internal
Project : Supply, Testing, Commissioning and Integration of Chilled Water System
Subject: BMS Data Point Schedule
Chiller Operating Mode 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Chilled Water Setpoint 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Chiller RLA % 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Entering Chiller Water Temperature 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Leaving Chilled Water Temperature 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Evaporator Flow Status 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
System Chilled Water Setpoint 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Chiller Enable Command 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Active Dem Lmt 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Cir A Pct Total 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Cir B Pct Total 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Cir C Pct Total 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Control Point 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Motor Current 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
No of Starts 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Operating Hours 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Sys Alert/Alarm 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Element Comm Status 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Schedule 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
Occupied 1 BACnet/IP or BACnet MS/TP or MODBUS RS‐485
3 Pressurisation Unit 1
Pressurisation Unit Common Fault 1 From Pressurisation Panel Belden 5300 FE / 8760 1
Pressurisation Unit Run Status 1 From Pressurisation Panel Belden 5300 FE / 8760 1
# Internal
Project : Supply, Testing, Commissioning and Integration of Chilled Water System
Subject: BMS Data Point Schedule
Total No of Points 32 31 3 7
Total No of Points with 10% Spare 36 35 4 8