Purchase Order Company


ORDER N. OF VERSION N. OF
VARIETY ENTERPRISES Ganesh old papermart
1220061733 06.06.2023 Opp
BUYER PHONE
BPC PRASHANT CHOLLI 918043400200 SHOP NO 2, ICICI Bank Sahar Road An
APPROVED BY DATE
KJOSHI 20.06.2023 OSWP

CURRENCY : INR Vendor number 195241


INCOTERMS : Vendor GST No.
PAYMENT CONDITION : 14 DAYS FROM INVOICE DATE 27BTYPB0210M1ZL
Delivery to:
Hitachi Rail STS S.P.A
2nd Floor, 207, The Capital,
G - Block, Bandra -
Kurla Complex, Andheri
400098 Mumbai - Maharashtra
State: Maharashtra

CONSUMABLES:
PROJECT: NMM

For purchase order acceptance a signed copy must be returned to the below address
____________________________________________________________________________________________________________________________________________________________

Item Material code Description Quantity UM Delivery Price Value


10 Consumable Materials for AMC-NMML-1 proj 07.04.2023 48,346.00
WBS Element: INBMMU61AAGSSC
CC: INB103640
RATES AND LIST OF ITEMS AS PER ANNEXURE TO THIS PO.
____________________________________________________________________________________________________________________________________________________________

FIXED AND FIRMED TOTAL PRICE INR 48,346.00


____________________________________________________________________________________________________________________________________________________________

OTHER CONTRACTUAL:
OTHER TERMS & CONDITIONS:
A)ORDER ACKNOWLEDGMENT: KINDLY ACKNOWLEDGE AND RETURN ONE COPY OF THE P.O. DULY SIGNED ON CONTRACTOR
SIGNATURE COLUMN WHICH WILL ENABLE US TO ACCOUNT YOUR INVOICES AS SOON AS WE RECEIVE THE SAME. IN THE ABSENCE
OF ACKNOWLEDGEMENT NO INVOICES WILL BE ACCOUNTED.
B)PRICES: THE PRICES ARE FIRM AND FINAL AND NOT SUBJECT TO ANY VARIATION OR ALTERATION IN ANY CASE TILL THE
COMPLETION OF ALL SUPPLIES/SCOPE OF WORK.
C)TIME IS OF ESSENCE OF THIS PURCHASE ORDER. FOR DELAY IN SUPPLIES, RISK PURCHASES WILL BE MADE FROM OTHER
SOURCES AND EXTRA COST INCURRED BY HITACHI RAIL STS IN PROCURING THE MATERIAL SHALL BE RECOVERED FROM YOU.
D)ALL DOCUMENTS SHOULD BEAR HITACHI RAIL STS PURCHASE ORDER NO. AND DATE.
E)SEPARATE INVOICE SHOULD BE RAISED BY VENDOR FOR EACH PURCHASE ORDER AND EACH CONSIGNMENT.
i.INVOICE SHOULD CONTAIN COMPLETE DESCRIPTION, CLASSIFICATION, TIME AND DATE OF REMOVAL OF, MODE OF TRANSPORT,
VEHICLE REGISTRATION NUMBER, RATE OF DUTY, QUANTITY AND VALUE OF GOODS AND DUTY PAYABLE THEREON.
ii.INVOICE SHALL FURTHER INCLUDE THE FOLLOWING ADDITIONAL DETAILS, WHEREVER APPLICABLE:
a)VENDOR’S GST REGISTRATION NUMBER ALONG WITH THE REGISTERED ADDRESS.
b)HITACHI RAIL STS’S RESPECTIVE GST REGISTRATION NUMBER, NAME AND ADDRESS.
c)HSN CODE / SERVICES ACCOUNTING CODE ALONG WITH DESCRIPTION OF SAID GOODS / SERVICES.
d)PLACE OF SUPPLY.
______________________________________________________________________________________________________________________________________________________
Hitachi Rail SPA - India Branch- CIDCOproject
Foreign Company Registration No: F04775 Dt.28.07.2014
GST No. 27AAKCA0566E1ZT
Company with sole shareholder and subject to direction and coordination of Hitachi Ltd.
802-B, 8th Floor, Grande Palladium
175, CST Road, Kalina
Santacruz (East)
Mumbai- 400098
Maharashtra, India
Ph: +91 022 67870400
P.O. N. DATE VERS. VERS.DATE VENDOR BUYER Page
1220061733 06.06.2023 195241 BPC PRASHANT CHOLLI 2/ 6

e)GST BE SHOWN SEPARATELY ALONG WITH RATE OF GST


f)IF GST IS PAYABLE UNDER REVERSE CHARGE MECHANISM, THE SAME SHOULD BE MENTIONED IN INVOICE.
g)ANY OTHER DETAILS AS MANDATED BY THE PROVISIONS TO MAKE THE INVOICE GST COMPLIANT
h)VENDOR SHALL ENSURE THAT HITACHI RAIL STS SHOULD RECEIVE THE INVOICE WITHIN 5 DAYS FROM DATE OF ISSUE OF SUCH
INVOICE.
F)SUPPLIER SHOULD NECESSARILY TAG THE MATERIAL CONTAINING INFORMATION SUCH AS DESCRIPTION, HITACHI RAIL STS ITEM
CODE ETC. IN ADDITION TO THE CONSOLIDATED PACKING LIST.
G)OBSERVATIONS BY HITACHI RAIL STS’S QUALITY CONTROL LABORATORY / INSPECTION ENGINEERS WILL BE FINAL AND BINDING
FOR PAYMENT.
H)REJECTED MATERIALS SHALL BE LYING AT HITACHI RAIL STS SITE AT THE RISK AND COST OF THE SUPPLIER AND THE SAME
SHALL BE RETURNED TO YOU ON FREIGHT TO PAY BASIS, IF NO INFORMATION IS RECEIVED FROM YOUR SIDE FOR COLLECTION OF
MATERIAL WITHIN 15 DAYS OF DISCREPANCY INTIMATION TO YOU.
I)SUPPLIERS DELIVERING MATERIALS AT HITACHI RAIL STS SITE SHOULD TAKE SECURITY SEAL ON ALL THE DOCUMENTS AND
DELIVER THE MATERIALS AT DESIGNATED STORES ONLY.
J)THIS ORDER IS WITHIN THE RIGHTS OF THE HITACHI RAIL STS AND RESERVES THE RIGHT TO INTIMATE TO STOP SUPPLY OR
RESUME SUPPLY FOR THIS PURCHASE ORDER WITH A 24 HOURS NOTICE WITHOUT ASSIGNING ANY REASON.
K)HITACHI RAIL STS RESERVES THE RIGHTS TO REJECT MATERIAL IN CASE IT IS SUPPLIED EARLIER THAN THE SCHEDULED
DELIVERY DATE.
L)AVOID SPILLAGE / LEAKAGE OF MATERIAL DURING LOADING, TRANSIT & UNLOADING.
M)IF YOUR ITEMS CONTAIN ANY HAZARDOUS MATERIAL, THEN YOU HAVE TO DELIVER THE ITEMS ALONG WITH LATEST MATERIAL
SAFETY DATA SHEET.

PRICING TYPE:
i.VENDOR ACKNOWLEDGES THAT THE PRICE QUOTED TO HITACHI RAIL STS IS AFTER PROVIDING THE COMPLETE BENEFIT
ACCRUED TO HITACHI RAIL STS ON ACCOUNT OF MIGRATION TO GOODS AND SERVICE TAX (GST). THE SAID BENEFIT IS
CALCULATED AS PER THE ANTI-PROFITEERING LAW AS STATED IN SECTION 171 OF CENTRAL GOODS AND SERVICES TAX, ACT
2017. ACCORDINGLY, VENDOR SHALL RENDER ALL ASSISTANCE TO HITACHI RAIL STS AND PROVIDE THE REQUISITE SUPPORTING
DOCUMENTS AS AND WHEN REQUIRED BY HITACHI RAIL STS TO SUBSTANTIATE THE REDUCTION.
ii.UNLESS OTHERWISE STATED SEPARATELY, THE PRICE AGREED ARE INCLUSIVE OF ALL TAXES, ROYALTIES, DUTIES, LEVIES AND
ANY OTHER CHARGES LEVIABLE, INCLUDING TAX DEDUCTED AT SOURCE WHICH SHALL BE BORNE BY THE VENDOR. GOODS AND
SERVICE TAX (GST) SHALL BE CHARGED EXTRA AT APPLICABLE RATES ON THE PRICE WHEREVER APPLICABLE.
GST- APPLICABLE EXTRA.
PACKING : ROAD WORTHY/AIR WORTHY/SEA WORTHY AS APPLICABLE.
ANY DEFECT DUE TO PACKING IS TO THE ACCOUNT OF VENDOR.
FREIGHT CHARGE: INCLUDED IN PRICE.

PAYMENT:
100% WITHIN 30 DAYS FROM THE DATE OF RECEIPT OF MATERIAL SUBJECT TO ACCEPTANCE AND REQUISITE COMPLETE
DOCUMENTS.

TERMS OF DELIVERY:
DESPATCH DOCUMENTS:
FOLLOWING DOCUMENT SHOULD BE SENT ALONG WITH THE MATERIAL WHICHEVER IS APPLICABLE WITHOUT FAIL, FAILING WHICH
HITACHI RAIL STS WILL NOT PROCESS YOUR BILL.
ORIGINAL INVOICES
PACKING LIST.
DELIVERY CHALLAN,
MANUFACTURER TEST REPORTS,
INSPECTION REPORT,
MATERIAL CERTIFICATE.
WARRANTY CERTIFICATE.
INSTRUCTION MANUAL.
POD.

Hitachi Rail SPA - India Branch- CIDCOproject


Foreign Company Registration No: F04775 Dt.28.07.2014
GST No. 27AAKCA0566E1ZT
Company with sole shareholder and subject to direction and coordination of Hitachi Ltd.
802-B, 8th Floor, Grande Palladium
175, CST Road, Kalina
Santacruz (East)
Mumbai- 400098
Maharashtra, India
Ph: +91 022 67870400
P.O. N. DATE VERS. VERS.DATE VENDOR BUYER Page
1220061733 06.06.2023 195241 BPC PRASHANT CHOLLI 3/ 6

.
.
. . . .
. Hitachi Rail STS S.p.A.
.
.

Hitachi Rail SPA - India Branch- CIDCOproject


Foreign Company Registration No: F04775 Dt.28.07.2014
GST No. 27AAKCA0566E1ZT
Company with sole shareholder and subject to direction and coordination of Hitachi Ltd.
802-B, 8th Floor, Grande Palladium
175, CST Road, Kalina
Santacruz (East)
Mumbai- 400098
Maharashtra, India
Ph: +91 022 67870400
P.O. N. DATE VERS. VERS.DATE VENDOR BUYER Page
1220061733 06.06.2023 195241 BPC PRASHANT CHOLLI 4/ 6

Purchase Order Terms & Conditions


1. DEFINITIONS AND INTERPRETATION 4. DELIVERY OF GOODS
Unless the context otherwise requires the following words and expressions used in Unless the Contract expressly provides otherwise:
these Conditions will have the following meanings: a) the Goods must be suitably packed and delivered by the Contractor:
a) 'Applicable Laws' includes, but is not limited to any of the following: (i) to the address specified in the Contract by the Time for Completion, or if no address
(i) All laws, amendments, consolidations, replacements or re-enactments of such laws; or date is specified then to the address and by the date agreed between the Parties; and
(ii) Local government legislation including regulations, by-laws and other subordinate or (ii) at its own risk and expense and by a method of transport chosen by the Contractor.
delegated legislation and all export control, asset control and trade regulations and b) the Contractor will be liable for damage caused to Goods not packed or not suitably packed;
including all legislation including regulations, by-laws and other subordinate or delegated c) risk in the Goods will pass from the Contractor to the Principal upon acceptance by the Principal;
legislation and all export control, asset control and trade regulations applicable in India; d) property in the Goods will pass from the Contractor to the Principal upon the earlier of:
(iii) any approval, consent, exemption, licence, permit or regulation however (i) the Principal accepting delivery of the Goods; or
described, of a Government Agency or Government Authority or any other applicable persons, (ii) the Contractor becoming entitled to payment in respect of the Goods.
whether autonomous or not, who is charged with the administration of a law and any 5. ACCEPTANCE OR REJECTION OF GOODS
renewal of them (including any condition or requirement under them),that has a right a) All Goods will be received by the Principal subject to inspection before acceptance.
to give any consent or impose any requirement in respect of the Goods or Services b) If any Goods are rejected due to non-compliance with the specifications required
or the works or projects to which the Goods or Services relate; by the Principal or are faulty or damaged, the Principal will informthe Contractor
(iv) all export and import laws, regulations, decrees and policies of any country in as soon as practical and provide sufficient written detail identifying non-compliance.
which the Parties conduct business pursuant to the Purchase Order. c) Within 14 days of such notification and prior to any corrective action that
b) 'Conditions' means these terms and conditions for the provision of Goods and/or Services. incurs costs, both parties will agree to one of the following solutions:
c) 'Confidential Information' means any information communicated by one party to the (i) the rejected delivery will be returned to the Contractor for credit or replacement
other whether in writing, orally or in any other form or medium in relation to this Contract at Contractor's cost; or
and includes a party's operations, business or customers; marketing and financial data; (ii) the Contractor will undertake a repair or obtain a replacement acceptable to
commercialisation; Intellectual Property Rights; methodology; concepts; product plans, the Principal at the Contractor's cost; or
drawings and product specifications; manufacturing processes; future market and (iii) the Principal will arrange for repair or replacement of the Goods at the Contractor's cost,
product plans; trade secrets; know-how; technical; economic or other information not already but failing agreement the Principal will select the solution it considers appropriate in
in the public domain. the circumstances including but not limited to termination ofthis Contract.
d) 'Contract' means the contract established between the Principal and the Contractor for d) If a credit note is raised for Goods returned to the Contractor that the Principal has
the supply of Goods and/or the provision of Services by the Contractor to the Principal, paid for, all credits and reimbursements due in relation to short supply or faulty product
evidenced by this Purchase Order, and the receipt by the Principal will be deducted from the next payment due to the Contractor. If nofurther payments are due,
of the Contractor's acknowledgement within 14 days from the date of the Purchase Order. then the Contractor must forward payment to the Principal within 7 days of receiving claim details.
e) 'Contractor' or 'Supplier' means the party to whom the Purchase Order is issued and named e) in the event the Contractor is required, under the Contract, to install the Goods then
as such in the Purchase Order including its successors and permitted assigns and sellers. the cost of decommissioning and removing the defective Goods and the cost of reinstalling and
f) 'Customer' or 'End User' means any party who ultimately uses or is intended to recommissioning the replacement Goods will be borne by the Contractor. In the event the
ultimately use the deliverables. Principal or a third party is required to decommission and/or remove the defective Goods,
g) 'Force Majeure Event' means anything beyond the reasonable control of a Party that and/or install and/or commission the replacement Goods, the cost of doing so will be borne
prevents, delays or hinders that Party from or in fulfilling its obligations under the by the Contractor and will constitute a debt payable on demand by the Contractor to
Contract, including acts of terrorism, natural disaster, industrial action, or a failure the Principal.
of a supplier, public utility or common carrier. 6. SITE CONDITIONS
h) 'Goods' means the goods, materials, equipment and other products or items to be The following clause 6 applies to the extent that any Services are performed at the
supplied by the Contractor to the Principal as specified in the Purchase Order. Principal's site or the Client's site.
i) Hitachi Rail STS Hitachi Rail STS S.p.A. (formerly known as Ansaldo STS S.p.A.) means a) The Contractor warrants that it is familiar with and will adhere to any rules, policies
the parent company of the Principal/Company. and conditions imposed by the Principal or the Client in relation to a site, including,
j) 'Intellectual Property Rights' means any intellectual or industrial property, but not limited to, in relation to OHS and access to Site.
including any copyright, trademark, patent, registered design, trade secret, circuit layout b) The Contractor acknowledges that the Principal may be a contractor at a Site.
or semiconductor rights. The Contractor will comply with any reasonable directions made by the Principal or the Client,
k) 'Modern Slavery Breach' means human trafficking, forced labour, debt bondage including without limitation, in relation to standards, policies or procedures relating to
or employment of children, or similar offence including any conduct in breach of The rail safety and HSE.
Child Labour (Prohibition and Regulation) Act, 1986, The Bonded Labour System c) The Contractor will indemnify the Principal in relation to any claims made against
(Abolition) Act, 1976, provisions of the Indian Penal Code, Article 23 and 24 of the the Principal to the extent caused by the Supplier's breach of this clause 6.
Constitution of India, The Contract Labour (Regulation and And Abolition) Act, d) The Contractor acknowledges the presence of other third-party contractors at the Site
1970 and all such laws that may be applicable. and shall be responsible for coordinating with all such contractors and interface contractors
l) 'Party' or Parties means the Principal, Contractor or both of them as the context requires. for the purpose of fulfilling the obligations under this Contract.
m) 'Price' means the total price for the Goods and Services as stated therein the Purchase Order. 7. VARIATIONS
n) 'Principal' or 'Company' means a legal entity represented (as stated) in the a) At any time during the performance of the Contract, the Principal may by written notice
header/footer of this Purchase Order including its successors and permitted assigns. instruct the Contractor to give effect to a Variation.
o) 'Purchase Order' and/or 'Agreement' and/or 'Contract' means this document issued b) The Time for Completion will be adjusted to such extent as is reasonable in all the
by the Principal to the Contractor for the supply of Goods and/or the provision of circumstances to take account of any Variations.
Services by the Contractor to the Principal. c) The Price will be adjusted to take account of Variations by:
p) 'Services' means the services to be provided by the Contractor to the Principal as (i) the Contractor submitting to the Principal a priced quotation
specified in the Purchase Order. for acceptance by the Principal; or
q) 'Site' means the location where works are undertaken by the Principal and/or (ii) if one or both Parties do not wish to proceed in accordance with clause 7(c)(i), then by
the Client in relation to the Goods and/or Services. measurement & valuation at the rates & prices set out in Contract for similar work, if any; or
r) 'Taxes' any tax, levy, impost, deduction, charge, rate, duty or withholding which is (iii) if there are no such rates and prices, then by measurement and valuation at reasonable
levied or imposed by a government authority, from time to time, including any stamp, rates and prices determined by the Principal acting reasonably.
value added, goods and services or transaction tax, duty or charge. d) Notwithstanding any other provision of this clause 7, the Contractor is not obliged
s) 'Time for Completion' means the times or dates specified in the Purchase Order for to carry out any Variation if the combined net effect when taken
the completion of the Services and/or delivery of the Goods, as the case may be, as may be with all other Variations would increase or decrease the Price by more than 25%.
adjusted from time to time. 8. WARRANTY
t) 'Variation' means any modification, alteration or amendment a) The Contractor warrants that:
to Goods and/or Services. (i) the Goods will conform as to quality, quantity, description, specifications & drawings referred
u) 'Warranty Period' has the meaning given to it in clause 8b). to in the Contract, be free from defects in design, materials and workmanship,
These Conditions form part of the Contract and, except and to the extent specifically agreed that if performance standards are specified for the Goods then the Goods are capable of
otherwise by the Parties in writing, will apply to the exclusion of any and all other performing at such performance standards;
conditions, quotations or documents, including any terms and conditions attached to the (ii) Goods are free of all liens & encumbrances and Contractor has good title to them;
Contractor's acknowledgement of this Purchase Order. (iii) the Services will be provided using all reasonable skill and care;
2. PRICE AND PAYMENT (iv) the Goods/Services are fit and sufficient for the purpose which they are intended; and
a) Subject to clause 2c) and the payment terms (if any) stated on the first page of the Purchase (v) the Goods and Services strictly comply with all applicable
Order, the Principal will pay the Contractor's invoices on the finalbusiness day of the month laws, regulations, standards and codes.
following the month during which the Principal receives the Contractor’s invoice. (vi) all the Contractor's Personnel are eligible to work in the required country in the position
b) Any increase in the cost of manufacture, delivery and supply of the Goods and / or Services for description required by Principal including but not limited to possessing the necessary
any reason (including an increase in the rate of currency exchange) between the date of visas and other immigration clearances in respect of the performance of the Services.
the Purchase Order and the date of delivery or supply will be borne by the Contractor. b) The Contractor warrants that the Goods and Services are free from any omissions, defects
c) The Principal may deduct from or set off against amounts payable to the Contractor under or failures whether due in whole or part from faulty design, materials or workmanship
this Contract for any liquidated damages payable under clause 3d) or for any demand, claim, or any other cause which occurs (whether or not apparent) at any time for 12 months from
damage, expense, and/or loss that the Principal has incurred or may incur in connection with the the Time for Completion ('the Warranty Period'), during which the Contractor must repair
Contractor's failure to ensure due and proper performance of its obligations under this Contract. or replace such Goods or perform such Services, as the case may be, to the satisfaction of
d) The Principal may refuse to make payment of an invoice if the Contractor does not clearly the Principal where an error, omission, defect or failure in the Services or Goods arises.
display the Purchase Order number on its invoice under this Contract c) A new and separate warranty period of 12 months will apply for any Goods repaired or
3. TIME FOR COMPLETION replaced or any Services re-performed under this Contract, commencing on the date the
a) The Contractor must deliver the Goods or complete the Services, as the case may be, by repair, replacement or re-performance is completed.
the Time for Completion. d) The Contractor must obtain and ensure the Principal receives:
Time is of the essence of the Contract. (i) the full benefit of any manufacturer or other relevant third parties' warranties in
b) Subject to clause 3c), the Time for Completion will be adjusted if and as reasonable to respect of the Goods and Services;
take account of any Force Majeure Event by the duration of that event. (ii) maintenance and operating manuals; and
c) The Principal may, without incurring any costs and without incurring any liability (iii) an up to date register of all assets including a register of all express and implied
to the Contractor, suspend the delivery of the Goods or the performance of any Services warranties pertaining to those materials used in the Goods and Services as provided
by notice in writing to the Contractor if the Principal is prevented from accepting the Goods by the relevant supplier in a form that is assignable to any one or more of the Principal's
or from requiring the performance of the Services due to a Force Majeure Event. upstream customers in relation to the project for which this purchase is made.
d) If the Contractor fails to deliver the Goods or complete the Services by the Time 9. INDEMNITY
for Completion, the Contractor must pay to the Principal liquidated damages calculated at a The Contractor indemnifies the Principal against:
weekly rate of 1% of the part of the Price attributed to the Goods and / or Services up to a a) loss of or damage to property of the Principal in or upon which the work under the Contract
maximum amount equal to 10% of the Price. is carried out;
e) If liquidated damages are found to be voidable or otherwise unenforceable, general b) claims by any person against the Principal in respect of personal injury or death or loss
law damages for delay will apply. of or damage to any property, arising out of or as a consequence of the carrying out by
f) If the Contractor fails to deliver the Goods by the Time for Completion, the Principal the Contractor of the work under the Contract,
may, at its discretion terminate the Contract. Upon such termination, without prejudice except that the Contractor's liability to indemnify the Principal will be reduced
to the Principal's rights to recover liquidated damages from the Contractor under clause 3d), proportionately to the extent that a negligent act or omission of the Principal or employees
claim damages or its rights under these Conditions, the Contractor must reimburse the Principal or agents of the Principal may have contributed to the loss, damage, death or injury.
any costs and reasonable expenses incurred by the Principal in obtaining other 10. LIABILITY
goods in replacement of the Goods. a) Neither Party shall be liable to the other for any loss of profits or anticipated profits, indirect,
consequential, special or punitive damages including but not limited to loss of use, loss of
production,loss of income,loss of reputation, business interruption or diminution of share price.
b) The Principal's maximum aggregate liability to the Contractor pursuant to this
Contract is limited to the amount of the Price.
P.O. N. DATE VERS. VERS.DATE VENDOR BUYER Page
1220061733 06.06.2023 195241 BPC PRASHANT CHOLLI 5/ 6

11. INTELLECTUAL PROPERTY RIGHTS 16. OBLIGATIONS IN RELATION TO HEALTH, SAFETY AND ENVIRONMENT (Cont.)
a) Unless otherwise agreed between the Parties, any and all Intellectual Property Rights i) Establish, maintain and rigorously enforce practices that prioritise environmental protection
generated by Contractor in performance of Contract, or subsisting in or relating to the and sustainability;
Goods and Services will, subject to the rights of third parties, vest in the Principal. j) To the maximum extent possible, reduce, reuse and recycle material within their manufacturing
b) To the extent that any Intellectual Property Rights in the Goods and / or Services supplied operations and use recycling processes that employ closed-loop systems, wherever possible
by the Contractor under this Contract are owned by third parties, the Contractor will to achieve maximal use of a material or product;
obtain from such third parties, the grant to the Principal of a worldwide, non-exclusive, k) Ensure that hazardous waste is properly handled, stored and disposed of in accordance with
perpetual licence to use and to sub-licence the use of such Intellectual Property Rights. all relevent acts and regulations;
c) The Intellectual Property Rights in all tools, patterns, materials, drawings, l) Optimise transportation strategies in order to minimise the environmental footprint of all
specifications and other data provided by the Principal to the Contractor will at all Products shipped, including consideration of transportation modes and distances as well as
times vest in the Principal and must be used by the Contractor solely for the purpose packaging material types and quantities;
of performing its obligations under the Contract. m) Ensure it optimises the environmental performance of the Products and operations through a life
d) Upon completion of the Contract, the Contractor must return such tools, patterns, materials, cycle analysis approach for Products, processes and/or services, and endeavour to have
drawings, specifications and other data to the Principal. processes in place to identify and assess opportunities to reduce or eliminate the environmental
e) The Contractor indemnifies and will keep indemnified the Principal against all claims, costs, impacts of its activities, the Products they supply and the services that they perform.
expenses arising from any infringement of Intellectual Property Rights arising from the use 17. TAXES
of the Goods or in respect of the Services provided by the Contractor. a) Goods and Service Tax (GST) shall be charges extra whenever applicable
12. CONFIDENTIALITY b) Invoice raised by Vendor shall include the following additional details, wherever applicable:
a) Each party agrees to keep the Confidential Information of the other party secret and (i) GST Registration number
confidential, and to ensure and be responsible for ensuring that its employees or agents do (ii) Address
not disclose and will not disclose such Confidential Information, except in the following (iii) Principal's respective GST registration number, name, address
circumstances: (iv) HSN Code/Services Accounting Code along with description of said goods/services
(i) with the prior written consent of the other party; (v) Place of supply
(ii) to the party's employees, officers and legal advisers but only to the extent they (vi) The value of supply attributable to pure agent supply shall be shown separately in the invoice
need to know such information for the purposes of this Contract and they agree (vii) GST shall be shown separately along with rate of GST
to keep the information confidential; (viii)If GST is payable under Reverse Charge Mechanism, same should be mentioned in invoice
(iii) where the Confidential Information is in the public domain through no fault of the (ix) Any other details as mandated by the provisions to make the invoice GST compliant
party disclosing the information; or c) Principal should receive the Contractor's invoice within 5 days from date of issue of such invoice
(iv) where the disclosure is required or permitted by law or the rules of any stock exchange to d) Contractor shall issue a receipt voucher in case of any advance payment received from
which the party is subject. Principal and a refund voucher in case no supply is made against such advance. Such
b) Each party agrees: documents shall be GST compliant and shall contain all particulars as may be prescribed to
(i) that the Confidential Information of a party remains the property of that party; make the said document GST compliant.
(ii) to keep the terms of this Contract confidential; e) A debit note or a credit note, if required, shall be issued within 6 months from date of
(iii) all information they supply to each other is supplied in strict confidence and is issuance of original invoice. Such debit/credit notes shall contain all particulars as may
to be used solely by the recipient for the purpose carrying out its respective obligations be prescribed including reference to original invoices, to make the said document GST compliant.
under this Contract. f) Contractor will be liable to pay GST to Government (unless chargeable under Reverse Charge
13. PRIVACY AND DATA SECURITY Mechanism), undertake GST compliances and abide by any additional conditions as required
a) The Contractor will comply with all Applicable Laws which relate to privacy and by GST provisions to enable Principal to take the credit of the said GST. In case of
data security. non-compliances, Contractor will indemnify Principal and such indemnification shall be in terms
b) The Contractor warrants that it maintains the levels of cyber security as would be of deduction in future payments or recoveries in any other manner. Additionally, vendor shall
required by a competent supplier exercising best industry practice. provide the supporting's as and when required by Contractor to fulfill the above condition.
c) To the extent that the Supplier is a processor of the Principal's data, including any g) Contractor acknowledges that the price quoted to Principal is after providing the complete benefit
personal data, the Contractor undertakes to possess, store or otherwise treat the data accrued of migration to GST. The said benefit is calculated as per the Anti-Profiteering as stated
in a manner which prevents unauthorized access to, or disclosure of,such data. in Section 171 of Central Goods and Services tax Act 2017. Accordingly, Principal shall provide
14. TERMINATION the requisite supporting's as and when required by Principal to substantiate the reduction.
a) Without prejudice to any other rights or remedies it may have at law, the Principal 18. PERFORMANCE SECURITY
may, by providing written notice to the Contractor, immediately terminate the Contract: a) If requested by the Principal, the Contractor must, within 7 days of the Contract, provide
(i) if the Contractor commits a serious breach of its obligations under the Contract and to the Principal an on-demand bond from a bank approved by the Principal in a sum equal
fails to remedy the breach within 14 days from receipt of written notice from the Principal to the Price and in a form acceptable to the Principal for the due observance and
requiring the Contractor to remedy the breach; or performance of the Contract by the Contractor (Performance Bond) effective from the Time
(ii) if a receiving order is made against the Contractor, or the Contractor is unable to pay for Completion and valid until the end of the Warranty Period. The cost of obtaining the
its debts as they fall due, or seeks the protection of the Court against or enters into an Performance Bond will be at the expense of the Contractor.
arrangement or composition with its creditors or, being a company, goes into liquidation whether b) The Contractor acknowledges and agrees that the Principal may makea demand upon the
voluntary or otherwise (except for the purpose of solvent amalgamation or reconstruction), Performance Bond at any time in the Principal's absolute discretion.The Principal will be
or a receiver or manager on behalf of a creditor is appointed in respect of the Contractor; or entitled to deduct from or set off against the proceeds of any demand upon the
(iii) for breach of clause 23 (Modern Slavery) or clause 21 (HSTS Code of Ethics); or Performance Bond, all claims, damages, expenses, and losses it may incur or have incurred
(iv) for convenience at any stage prior to the Time for Completion. in connection with the Contractor's failure to ensure due and proper performance of its
obligations under this Contract.
In the event of a termination for convenience under this clause 14a) (iii), the Contractor c) The Principal's rights in relation to the Performance Bond are without prejudice to its
must deliver to the Principal all Goods ordered on behalf of the Principal prior to the other rights or remedies (whether contractual, statutory, legal, equitable or otherwise).
date of termination. d) The Performance Bond (or any balance remaining for the credit of the Contractor) will be
refunded at the end of the Period.
b) Upon termination of this Agreement for any reason, the Contractor's entitlement, provided it is 19. DISPUTE RESOLUTION
not in default, arising out of or in connection with this Contract (including the termination) a) Any dispute, controversy or claim arising out of or in connection with this Purchase
will be limited to any amount then due to the Contractor but unpaid as at the date of Order shall be settled by arbitration according to the Arbitration & Conciliation Act 1996
termination and the Contractor will not be entitled to any other compensation or damages. (including any amendment thereto) by sole arbitrator who shall be jointly appointed by the
15. INSURANCE Parties. The arbitration language shall be in English and the venue will be Bangalore, India.
a) The Contractor must before commencing work under the Contract obtain the required insurances, 20. ASSIGNMENT AND SUBCONTRACTING
including such insurance nominated by the Principal, in respect of the supply of Goods and/or a) No party may assign its interest in this Contract without the consent of the other
Services under the Contract from an insurer acceptable to the Principal. party, except that the Principal may assign or novate its interest in this Contract to
b) The Contractor must provide certificates of currency in respect of such insurances when any company within the Hitachi Rail STS group of companies.
requested by the Principal. b) The Contractor may sub-contract its obligations under this Contract with the prior written
c) The effecting of insurance does not limit the liabilities or obligations of the Contractor consent of the Principal.
under the Contract. c) The Contractor must ensure that any sub-contractor approved by the Principal observes all the
16. OBLIGATIONS IN RELATION TO HEALTH, SAFETY AND ENVIRONMENT provisions of this Contract as if the sub-contractor were a party to this Contract. The
a) When using the Principal's premises, facilities and equipment the Contractor must, and must Contractor indemnifies the Principal for the acts, defaults and omissions of its
ensure that its personnel comply with all reasonable directions and the procedures of the Principal subcontractors as if they were those of the Contractor. Approval to subcontract will not
relating to occupational Health, Safety & Envirionment (HSE) and security as notified by Principal. relieve the Contractor from any liability or obligation under this Contract.
b) The Contractor must: 21. HITACHI RAIL STS CODE OF ETHICS
(i) ensure that plant & systems of work used by Contractor and itspersonnel in supplying Goods a) In the performance of this PO/Agreement, the Contractor/Supplier undertakes to fully comply with
and/or Services under this Contract are safe and will not expose the Contractor, its personnel the Code of Ethics of the Company, based on Hitachi Rail STS S.p.A. Code of Ethics and the
or the employees and agents of the Principal or others at the workplace to hazards; Group Anti-Corruption Policy. The Contractor/Supplier acknowledges that it has received from
(ii) provide such information, instruction and training to its personnel as is necessary to the Company an English version of the Code of Ethics, Group Anti- Corruption policy prior to
the supply of the Goods and / or Services under this Contract and to supervise signing this Agreement. Copies of the Code of Ethics and the Group Anti-Coruption Policy
its personnel so as to ensure the said personnel will in the supply of the Goods can be downloaded from Hitachi Rail STS's website under the link
and/or Services do so in such a manner that they are not exposed to hazards; and https://www.hitachirail.com/our-company/compliance-ethics/.
(iii) where it may not be practicable to avoid hazards in the supply of the Goods and / or The Contractor/Supplier expressly agrees, warrants and represents that:
Services under this Contract, the Contractor must, on its own account and at its own expense, (i) it did not, and will not intentionally offer, promise or give any undue and/or illegal pecuniary
provide its personnel with such adequate personal protective clothing and equipment as is or any other advantage, property or benefit of whatever nature, whether directly or through
practical to protect them against hazards. intermediaries, to any Official, or to a third party, so that such person will act, or refrain from
c) The Contractor having undertaken to take all necessary precautions to ensure the safety of its acting in relation to the performance of any official duties, or will be anyway improperly
personnel agrees that together with its personnel it may be required to demonstrate to the Principal influenced, in order to obtain or retain business, or other improper advantage of whatever
their competency to supply the Goods and / or Services safely prior to commencing them, and agrees nature in the conduct of business in relation to this Agreement and that it has taken adequate
to provide evidence of competency when requested by the Principal. measures to prevent its subcontractors or any third parties subject to any third parties
d) The Contractor acknowledges and agrees that the Principal holds great importance on HSE subject to its control from doing so;
and has zero tolerance for any non-compliance with the Principal's HSE requirements including (ii) it has not been, is not, and will not be involved with reference to the
without limitation any legal or contractual breach. execution of this Agreement, in any promise, incitement, or aiding, or abetting,
e) Any penalty imposed by Principle Employer/client on the Principal due to contractor's HSE or authorisation of any act of bribery of any Official or a third party;
non-compliance, such penalty will be recovered from the Contractor's bill. (iii) it shall not breach the provisions of law but not limited to OECD Convention of Combating
f) Comply with all statutory and legislative requirements including but not limited to the Bribery of Foreign Public Official in International Business Transactions, Bribery Act
relevant Health, Safety, and Environmental Acts and Regulations and guidelines and rail safety (UK) 2010 and U.S. Foreign Corupt Practices Act.
obligations in the relevant jurisdictions in which the services are performed. b) The Contractor/Supplier expressly guarantees that neither it nor its employees or representatives
g) The Principal may conduct a full HSE audit of the Contractors work practices to ascertain have been convicted of, or put under investigation for, criminal offences and particularly for
whether the Contractor is in compliance with the Principal's HSE Management System requirements those involving fraud or corruption and is not currently listed by any Government Agency,
whether set out in the Contract or in any other documented policy. Government Authority or any Court as being debarred, suspended, proposed for suspension or
h) All incidents occurring on the site must be reported as soos as reasonably practical, but in debarment, or otherwiae ineligible for working in any government procurement programs.
no event later than the end of the shift on which the incident occurred or was discovered
by the Contractor's relevant management personnel. Incident reports must be accurate to ensure
proper investigation, discussion and remedial action.
P.O. N. DATE VERS. VERS.DATE VENDOR BUYER Page
1220061733 06.06.2023 195241 BPC PRASHANT CHOLLI 6/ 6

21. HITACHI RAIL STS CODE OF ETHICS (Cont.) ...


c) Notwithstanding anything to the contrary contained in this Agreement, if the Contractor/Supplier
breaches any obligation in the Code of Ethics or of the Group Anti-Corruption Policy
or the obligations under this clause, the Principal/Company shall be entitled at its sole
discretion to terminate this Agreement and to seek compensation from the Supplier
for all losses or damages it suffers or incurs (including all costs of any action, legal
costs, disbursements and expenses (on a full indemnity basis)) resulting from such a breach.
i) The Contractor/Supplier indemnifies (and will keep indemnified) ,on a full indemnity basis,
the Company from and against all claims, actions, suits, proceedings, prosecutions, notices,
investigations or demands of any kind including by any third party, threatened or
brought by or against the Company arising out of or in connection with a breach by
the Contractor/Supplier of any of the obligations under this clause.
ii) When used in this clause the terms below have the following meaning;
- "Government Agency" means any government or governmental, semi-governmental,
administrative, municipal, fiscal or judicial body, department, commission, authority,
tribunal, agency or entity;
- "Government Authority" means:
a government or government department or other body;
a governmental, semi-governmental or judicial person; or
a person (whether autonomous or not) who is charged with the administration of a law;
- "Official" includes;
any officer or employee of any Government Agency, or any person acting in an official
capacity on behalf of any such Government Agency;
any officer, employee or official of a political party;
any candidate for political office;
any officer or employee of a public international organization; or
any other person acting in any public capacity or exercising a public function
or any activity in the public interest.
22. EXPORT COMPLIANCE
a) For all Goods, software, technologies or services to be delivered and provided under this
PO, Contractor shall comply with the export control, asset control, and trade regulations
("Export Control Laws") and orders applicable pursuant to the Purchase Order at the time of
export, re-export, transfer, disclosure, or provisions of goods, software, technolgy or services.
b) Contractor shall comply with all export and import laws, regulations, decrees and policies
of any country in which the Parties conduct business pursuant to thePurchase Order.
c) Contractor shall notify Principal by email to the concerned point of contact and
Importexport.TradecomIND@hitachirail.com, indicating the PO number and the relevant
date of signature, if export control laws or regulations restrict any Purchase Order deliverables.
Subject to applicable Trade Control Laws, Contractor shall provide Principal the export control
classification of any goods, software, technology or services.
d) Contractor shall be liable for any expenses and/or damages incurred by Contractor due to any
breach of its obligations under this Section, including those imposed by government authority or a
Customer/End-User. In the event Contractor has knowledge of any alterations to origin and/or
characteristics of the Products and /or to the applicable Export Control Laws, it shall notify the
Principal no later than three (3) business days upon discovery by email to the concerned point
of contact, & (see 22c) indicating the Purchase Order number and therelevant date of signature.
e) The Contractor shall provide to the Principal, within 30 days fromthe acceptance of the PO
and in any case, at least 3 days before delivery of the products/ services, all documents and
information requested in the attached "Hitachi Rail STS Export Compliance Declaration"(annex..)
by email to the concerned point of contact and (see 22c), indicatingthe Purchase Order
number and the relevant date of signature.
f) Contractor shall be liable for any expenses and/or damages incurred by Buyer due
to the lack of or inaccuracy of said export control data. Principal shall not be obligated
to fulfill its obligations under this Order if such fulfilment is prevented by any impediments
arising out of national or international foreign trade or customs requirements or any embargoes
or other sanctions, or any other trade related issue.
g) On prior written request of the Principal, if the Contractor fails to deliver the supporting
"Hitachi Rail STS Export Compliance Declaration" and information mentioned in point 3, 4 and 5
shall cause the application of consequential actions as laid out in this Purchase Order.

Wherever applicable and on the demand of the Principal, the Contractoris required to point out on its
offer and on the shipping document or sales invoice at least: the country of origin of goods, the
applicable regulations on their export and/or re-export, re-transfer and in the case of Dual-Use
controlled item the related alphanumerical code. In detail, in case of Dual-Use components, the
Supplier shall indicate if the following regulations are applicable: i) All laws, rules,
regulations, orders, notifications, guidelines, circulars etc. issued by Indian regulatory and
Government authorities including Directorate General of Foreign Trade (DGFT) and the Special
Chemicals, Organisms, Materials, Equipment and Technologies (SCOMET) List from time time to time
ii) European Council No 428 of 5 May 2009 iii) Export Administration Regulations iv) Any other
Regulation in force on Export Control. The Supplier is also required ,at its own responsibility,
to fulfil and provide the annex here attached (TMP 102) relevant to the supplied goods and in any
case to point out (i) in case of restricted items included but not limited to the categories
provided in the SCOMET List, the relevant alphanumerical code (ii) in the case of a Dual-Use
product included on the list in Annex I of European Council Regulationno 428 of 5 May 2009,
the relevant alphanumerical code and (iii) in case of an EAR product, the classification assigned in
the Commerce List - Export Control Classification Number - ECCN - (e.g. 9A991d) or if EAR99,
etc. and the relevant value of each US controlled components (iv) in case of controlled by other
Regulation product, the relevant assigned classification.
23. MODERN SLAVERY
a) The Contractor acknowledges that the Principal rejects all forms of Modern Slavery Breaches
within its own operations and in its supply chain.
b) The Contractor warrants that it does not engage in any Modern Slavery Breaches itself
or its applicable supply chain and complies with all Applicable Laws relating to Modern
Slavery Breaches.
The Principal may terminate this Contract with immediate effect if theContractor is found to
have engaged in a Modern Slavery Breach in its own operations or within its supply chain.
24. GENERAL
a) The Contract will be governed by and construed in accordance with the laws of India and
the Courts of Bangalore shall have exclusive jurisdiction over this Purchase Order.
b) All notices and other communications provided for or permitted under this Contract or
otherwise must be sent by certified or registered mail with postage prepaid, by hand delivery or
by facsimile or email transmission to the parties respective contactdetails as set out in the PO.

AS ORDER ACKNOWLEDGEMENT OF PURCHASE ORDER TERMS AND CONDITIONS

DATE CONTRACTOR SIGNATURE (AUTHORISED)

----------------- --------------------------------------------------------------