Earth Checklist Quarterly DEP

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Earth Connectivity and

Continuity Preventive
Maintenance Record Sheet

Date Start Time End Time


PTW No Location
Equipment ID IXL
Schedule Quarterly

Sr. Status
Inspection & Maintenance Job Remark
No. (Pass/Fail)
1 Measurement of earth connectivity and continuity
Verification of earth connectivity of all cubicle / Equipment
2 IN
with earth strip
CER
3 room Measurement of earth resistance where possible
Writing of earth values with permanent marker/paint at the
4
earth point
1 Measurement of earth connectivity and continuity
Verification of earth connectivity of all cubicle / Equipment
2 IN
with earth strip
DCC
3 room Measurement of earth resistance where possible
Writing of earth values with permanent marker/paint at the
4
earth point
1 Measurement of earth connectivity and continuity
Verification of earth connectivity of all cubicle / Equipment
2 IN
with earth strip
UPS
3 room Measurement of earth resistance where possible
Writing of earth values with permanent marker/paint at the
4
earth point

Remarks: -

Name Designation Signature

Performed By

Verified By