Professional Documents
Culture Documents
Earth Checklist Quarterly DEP
Earth Checklist Quarterly DEP
Earth Checklist Quarterly DEP
Continuity Preventive
Maintenance Record Sheet
Sr. Status
Inspection & Maintenance Job Remark
No. (Pass/Fail)
1 Measurement of earth connectivity and continuity
Verification of earth connectivity of all cubicle / Equipment
2 IN
with earth strip
CER
3 room Measurement of earth resistance where possible
Writing of earth values with permanent marker/paint at the
4
earth point
1 Measurement of earth connectivity and continuity
Verification of earth connectivity of all cubicle / Equipment
2 IN
with earth strip
DCC
3 room Measurement of earth resistance where possible
Writing of earth values with permanent marker/paint at the
4
earth point
1 Measurement of earth connectivity and continuity
Verification of earth connectivity of all cubicle / Equipment
2 IN
with earth strip
UPS
3 room Measurement of earth resistance where possible
Writing of earth values with permanent marker/paint at the
4
earth point
Remarks: -
Performed By
Verified By