Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE VII
SIQUIJOR DISTRICT ENGINEERING OFFICE
Larena, Siquijor

GAA FY 2022
DETAILED ENGINEERING DESIGN PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE
PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT
SOCIAL SERVICE, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE
BUILDING IN BARANGAY SOLANGON, SAN JUAN, SIQUIJOR

SGD. SGD. SGD.


CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng.
CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
TABLE OF CONTENTS PROVINCE OF SIQUIJOR
MUNICIPALITY OF ___________

1 COVER PAGE
OFFICE OF THE BUILDING OFFICIAL
TABLE OF CONTENTS
2 PERSPECTIVE
VICINITY MAP
SITE DEVELOPMENT PLAN RECOMMENDING APPROVAL
HEAD: DATE:
N 3 SUMMARY OF QUANTITIES

FLOOR PLAN
BUILDING OFFICIAL DATE:
FRONT ELEVATION
RIGHT SIDE ELEVATION
W E Sandugan
Bitaug
Bitaug Elem. School

4 LEFT SIDE ELEVATION


REAR ELEVATION
Lomangcapan

Cangmalalag E. Villanueva Central School


SECTION THRU A-A
S Cabulihan
Cabulihan Elem. School
E. Villanueva Nat'l. High School

E. Villanueva Municipal Hall


SECTION THRU B-B
DOOR SCHEDULE
LAND USE & ZONING
Taculing Ponong
Alamang Processing Plant
Poblacion

Bino-ongan
ENRIQUE WINDOW SCHEDULE
Taculing Bridge

Canlambo
Manan-ao
Bolot VILLANUEVA 5 CEILING PLAN
CEILING PERSPECTIVE
Balolang
Bagacay Balolong
Camogao CEILING SECTION BUILDING OFFICIAL DATE:

Libo Elem. School


Larena Central Elem. School
Libo
6 GENERAL NOTES
LARENA Helen (Datag)
Larena Port Parian
DPWH Prince Hypermart Libo Bridge

SSC Datag Bridge


Larena Municipal Hall
South North
Poblacion Poblacion Olave Cangmangki Bridge 7 GENERAL NOTES

PERSPECTIVE THIS SITE PROSIELCO Nonoc


Cangbagsa
Bontod Cangmangki
Roxas Primary School

8 GENERAL NOTES
SabangAbattoir
LINE AND GRADE
Lotloton Bridge
Sabang Bridge
Canlasog

Sabang Cang-allas New Corrigedor


Primary School
Bintangan
9 BILLBOARD DETAIL
Luyang Lotloton

SIQUIJOR
Banban Elem. School Lotloton Spillway
Bogo Elem. School

Cang-allas Bridge
La Copa Cavana

FOUNDATION PLAN
Sunny Shine Resort
Banban National High School
Villa Marmarine Norwegian Beach Resort Bogo
SIPCOR
La Gardena

Olo
Banban Calunasan
Basac Elem.School Basac High School
Tacloban
SECOND FLOOR FRAMING PLAN
Candanay Elem. School
Capisacan Spillway
Siquijor Provincial Hospital Das Traum Guest House
Tongo Candanay Sur Candanay Norte Controlled Dumpsite
Pangi Elem. School
Basac
10
Siquijor Port

Caticugan Big Belly Burger


Pangi
Lico-an WALL ON THE BEAM BUILDING OFFICIAL DATE:
Cangalwang Elem. School Assisi High School
St. Francis of Assisi Church Licoan Elem. School
Blue Wave Inn PNP Headquarters
Candigum
Cang-alwang
Siquijor Airport
Carmelite's College
Dondezco

Replica Manor
Rainbow Bay Resort
Dumanhog Bridge
Siquijor Municipal Hall
Poblacion Infinity Heights
Pili
Foot Bridge
Olang
Mango Tree Beach Resort
Hotel Agrifino
Salagdoong Beach Resort
FOOTING - COLUMN DETAILS
Tinago Abattoir
QMIS
Tacdog
Dumanhog
Calalinan
Cockpit
BIT
Cang-agong Elem. School WALL- FOOTING DETAILS
Canal Bonga Kiskis Stone & Shell Crafts

Pasihagon
Siquijor Provincial Science
High School LTO
Siquijor Central Elem. School

Siquijor Provincial Capitol


Ibabao Elem. School

Ibabao
Panlautan
Cang-agong
Catamboan Cabal-asan
COLUMN TO BEAM CONNECTION
PNPPPO Polangyuta Pisong B Elem. School Pisong A Elem. School
BJMP Canghunoghunog
Caipilan Cang-apa Poblacion Norte

Tambisan
Caipilan Elem. School
Caitican
Siquijor Public Cemetery
Lambohon

Cang-inte Maria Dump Site


Maria Wharf
Maria Elem. School ROOF FRAMING PLAN
Adayo Cove
Tambisan Wharf
Bolos
Bolos Elem. School
Pisong B Pisong A
Poblacion Sur
Maria Municipal Hall

MARIA ROOF BEAM PLAN


ARCHITECTURAL
Tambisan Elem. School Cang-adieng Bandilaan
Bandilaan Park
TRUSS DETAILS
EXISTING BUILDING Tambisan Tambisan Nat'l. High School Songculan Looc
San Antonio Cantabon Cave
Bandilaan Tower

BEAM DETAILS
Paliton
Cantabon Elem. School
11 TYPICAL FASCIA FRAME
Cangmohao Calunasan
San Antonio Nat'l. High School Cantabon Cantaroc A
San Antonio Elem. School
PURLIN DETAILS
Solangon Can-asagan Cantaroc B
PURLIN CONNECTION DETAIL
Danish Lagoon Chelle's Guesthouse
The Sylvia
BUILDING OFFICIAL DATE:
White Villas Beach Resort
The Bruce

Coral Cay Beach Resort


Candura Sawang TRUSS- BEAM CONNECTION DETAIL
Charisma Beach Resort
Treasure Island
Lala-o Cangumantong Elem. School Cantugbas
Apo Divers
11200 Jj's Backpacker's Village
Candaping A
Tebjong
GUSSET PLATE DETAILS
Capalasanan Elem. School
Cansayang Luzong Elem. School
Lala-o Bridge
Poblacion Candaping B
Dalahikan Grill Cangumantong
12
Black Belt Grill

Funtasea
Leon Parami High School

Poo Elem. School


Capalasanan
Candaping High School
Candaping Elem. School
Bulakna Beach Resort STAIR DETAILS
Luzong
Capilay Spring Park
San Juan Municipal Hall
Maite Ponong Elem. School
Ponong Nat'l. High School
Logucan
SLAB DETAILS
San Juan Cemetery

SAN JUAN Maite Marine Sanctuary


San Juan Central School
Napo Cangmatnog Logucan Elem. School
Nabutay

WASTE WATER LINE LAYOUT STRUCTURAL


7000

Ponong Poo Tagmanocan Nabutay Elem. School


Belle's Bar Tubod
John Lea Cang-atuyom Elem. School
BUILDABLE AREA Hambilica
Tagmanocan Elem. School

Royal Cliff
Residencia Diosa
Cang-atuyom
Kimba
Cangclaran
Kinamandagan Elem. School
WATER LINE LAYOUT
13
Toris Backpacker's Paradise Isla de Paz
Liloan
Marelle's Museum
Coco Grove
Cang-asa Elem. School
Liloan Elem. School PIPING STANDARDS
Cambogahay Falls
Saguing SEPTIC TANK DETAIL
12650

Tag-ibo Kinamandagan
Riverside Guest House

On the rocks Cafe


Cang-asa Cangclaran Primary School

Tigbawan(Pob.)
Nagerong
Lazi Medicare Community Hospital

Minalulan Elem. School


PLUMBING SYMBOLS
U Story Guest House Tag-ibo Elem. School
Catulayan Ytaya Elem. School
Ytaya Tigbawan Bridge

LNAS
PLUMBING NOTES AND SPECS BUILDING OFFICIAL DATE:
SIPCOR SSC Tesda

Lazi Municipal Hall

9000 2200 Lazi Convent


Senora Bridge
Minalulan
Tignao Lazi Public Market
Kagusuan Beach
Catamboan(Pob.) Simacolong
5650

Islandia Beach Resort Timbaon Lazi Port


Campalanas Nat'l High School

Enchanted Balite Tree Upper Cabangcalan Catamboan Bridge

Gold View Beach Resort


Lazi Bay Resources Dev't. Inc.

LAZI
Salamangka Beach Resort
Timbaon Elem. School
Campalanas Bridge

FENCE Island Fresh Milk


Gabayan
Processing Plant Cangmunag
Cangmunag Elem. School
Campalanas

Cadoldolan Elem. School


Lower Cabangcalan
Talayong
SANITARY
Kawayan Holiday Resort Gabayan Elem. School

Dapdap Elem. School

BUILDING OFFICIAL DATE:


1000

VICINITY MAP ELECTRICAL


NTS
TO LALA-O, SAN JUAN SIQUIJOR CIRCUMFERENTIAL ROAD TO PALITON, SAN JUAN

BUILDING OFFICIAL DATE:

FIRE
SITE DEVELOPMENT PLAN SAFETY
NTS

BUILDING OFFICIAL DATE:

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
MARA LOUANNE K. SAAVEDRA
Republic of the Philippines ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
DRAWN: SGD.
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
PERSPECTIVE
VICINITY MAP EPHEGEN D. TIGMO A-2 2
SIQUIJOR DISTRICT ENGINEERING OFFICE SITE DEVELOPMENT PLAN DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN TABLE OF CONTENTS CHECKED: SGD. CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 5 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR DONAH MAE ROSE J. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
MARA LOUANNE K. SAAVEDRA
Republic of the Philippines ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
DRAWN: SGD.
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO EPHEGEN D. TIGMO A-3 3
SIQUIJOR DISTRICT ENGINEERING OFFICE SUMMARY OF QUANTITIES
DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN CHECKED: SGD. CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 5 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR DONAH MAE ROSE J. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
A B C A B C 1 2 3

9000 APEX APEX


1900 1100 3000 3000
8.40 8.40
T.O.B T.O.B

2200

2200
EXIT
1 1 6.20
6.20
W-2 D-2 W-1 W-1
2CL 2CL
1850

298

298
PANTRY 5.90 5.90

3300
OFFICE 2 W-1

2700

2700
2FL 2FL
1450

8400

8400
W-3 D-3
D-4
TOILET 3.20 3.20
2 2
7000

7000
TOILET D-4 CL CL

300

300
D-3
1450

W-3
LOBBY 2.90 2.90

3700
W-1
FFL

2700

2700
UP OFFICE 1 FFL
2250

0.20 0.20
D-2 W-1 NGL NGL

200

200
3 MAIN ENTRY
3 0.00 0.00
W-1

3000 3000 3000

9000
FRONT ELEVATION LEFT SIDE ELEVATION
SCALE 1:80MTS SCALE 1:100MTS
A B C

A B C 3 2 1
GROUND FLOOR PLAN
SCALE 1:80MTS APEX APEX
8.40 8.40
T.O.B T.O.B

2200
2200
6.20 6.20
2CL 2CL

298
298
5.90 5.90
A B C

2700
2700
2FL 2FL

8400
8400

9000
3.20 3.20
3000 6000 CL CL

300
300

2.90 2.90

1 1

2700
2700

W-1 W-1 W-1


FFL FFL
0.20 0.20
NGL NGL
3300

200
200

W-1 OFFICE 3 W-1

0.00 0.00
4750

SESSION HALL
D-2

2 2
7000

7000

REAR ELEVATION RIGHT SIDE ELEVATION


1450

W-3
D-4
W-1
TOILET SCALE 1:100MTS SCALE 1:100MTS
D-1
2250

2250

BALCONY
DN FIRE
EXIT
3 3 DOOR SCHEDULE D-1 D-2 D-3 D-4 WINDOW SCHEDULE W-1 W-2 W-3

1600 1600 600


1000
533 533 533 500 500 300 300
2000 1000 900 1600 3500 800 800 800 800 700

600
9000

1000
1500

2100
A B C

1500
2100

2100

2100

2100

900
600
FINISH FLOOR LINE
FINISH FLOOR LINE SPECIFICATIONS 4- PANEL SLIDING WINDOW WITH TRANSOM SLIDING WINDOW SLIDING WINDOW

SECOND FLOOR PLAN SPECIFICATIONS DOUBLE PANEL DOOR

1 PANEL
SOLID PANEL DOOR

2 PANELS
SOLID PANEL DOOR

3 PANELS
PVC DOOR

3 PANELS
QUANTITY 12 SETS 1 SETS 3 SETS
SCALE 1:80MTS QUANTITY
LOCATION SESSION HALL MAIN ENTRANCE/ EXIT PWD CR CR LOCATION HALL KITCHEN SINK, LAVATORY TOILET

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
MARA LOUANNE K. SAAVEDRA
Republic of the Philippines FLOOR PLAN ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
FRONT ELEVATION DRAWN: SGD.
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
RIGHT SIDE ELEVATION
EPHEGEN D. TIGMO A-4 4
SIQUIJOR DISTRICT ENGINEERING OFFICE LEFT SIDE ELEVATION
DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN
REAR ELEVATION
DOOR SCHEDULE CHECKED: SGD. CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 5 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR WINDOW SCHEDULE DONAH MAE ROSE J. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
1 2 3 A B C

APEX APEX
8.40 8.40 ROD SUSPENSION HANGER W/ ADJUSTMENT SPRING
T.O.B T.O.B
2200

2200
SEE TRUSS DETAILS METAL DOUBLE FURRING CHANNEL (NAILER) 12mm
SEE TRUSS DETAILS X 38mm X 5m 0.80mm THK. AT 400mm O.C.
6.20 6.20 1200 1200
2CL 2CL WIDTH
298

298
SEE RB DETAILS SEE RB DETAILS
TOP OF BEAM TOP OF BEAM
SESSION HALL 5.90 5.90
TOILET
2700

2700
2FL 2FL
8400

8400

DEPTH
3.20 3.20
CL CL
300

300
SEE BEAM DETAILS SEE BEAM DETAILS
METAL CARRYING CHANNEL (CEILING JOIST) 12mm
2.90 2.90 X 38mm X 5m 0.80mm THK. AT 1200mm O.C.
4.50mm THK FIBER CEMENT BOARD
TOILET OFFICE
2700

2700
ANGLE 20 X 20 X 2 ATTACHED TO CHB
LOBBY
FFL FFL WALL W/ TOK SCREWS AT 600mm O.C.

0.20 0.20
NGL NGL
200

200
0.00 0.00

CEILING SECTION
SECTION THRU A-A SECTION THRU B-B NTS

SCALE 1:100MTS SCALE 1:100MTS

REQUIRED DIMENSION
DEPTH OF CEILING TO
ROD SUSPENSION
A B C A B C HANGER WITH
ADJUSTMENT SPRING
11150
11150

1000 9150 1000 375 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 375

400
120
400 0
400
1000

1000

975
1 1 1 1 400 120
0

1200
1200
+ 2.70 ABOVE

1200
2 2 FLOOR LINE
2 2
9150

7150

7150

9150

9150

9150
1200
1200
PRIMARY
CHANNEL
12
00

1200
3 3 3 3
1000

1000

975
00
24
1000 9150 1000
11150
FIBER CEMENT 12
11150
CEILING BOARD 00 CEILING FURRING
SECTION
A B C A B C
PREFORMED
WIRE CLIP

ROOF PLAN CEILING PLAN


SCALE 1:100MTS SCALE 1:100MTS CEILING PERSPECTIVE
NTS

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
MARA LOUANNE K. SAAVEDRA
Republic of the Philippines ARCHITECT II
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CEILING PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DRAWN: SGD.
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
CEILING PERSPECTIVE
CEILING SECTION EPHEGEN D. TIGMO A-5 5
SIQUIJOR DISTRICT ENGINEERING OFFICE ROOF PLAN DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN SECTION THRU A-A CHECKED: SGD. CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 5 13
SECTION THRU B-B ENGINEER III OIC - ASST. DISTRICT ENGINEER DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR DONAH MAE ROSE J. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
GENERAL NOTES:
GENERAL CONSTRUCTION NOTES
6. ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE WITH THE ACI.318 95 BUILDING 3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR
1.0 STANDARDS AND CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION, AND CONSTRUCTION ACCORDING WITH ASCI SPECIFICATION (9th EDITION) IN SO FAR AS THEY DO NOT CONFLICT DEPOSITED AGAINST A FORMWORK.
OF THE PROJECT. WITH THE LOCAL BUILDING CODE REQUIREMENT. 4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P.) VOL. 1, 7. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC TO AMERICAN INSTITUTE OF STEEL SOIL PRESSURE OF 96kPa (2000 psf) CAN NOT BE ATTAINED AT PRACTICAL
CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS. DEPTHS, THE USE OF MICROPILES, BORED PILES, OR DRIVEN PILES MAY BE
7TH EDITION, 2015.
8. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTING.
2.0 DESIGN CRITERIA SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
2.1 LOADING 9. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS,
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS NOTES ON REINFORCEMENT
A. DEAD LOAD APPROVAL BEFORE FABRICATION. 1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS
CONCRETE - 23.56 kN/m 10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, SHALL BE:
STEEL - 76.93 kN/m EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, A. FOOTINGS, FOOTING BEAMS AND GIRDERS ------ fy = 275 MPa ( 40,000 psi )
ELECTRICAL, AND MECHANICAL DRAWINGS.
150mm THK. CHB WALL - 2.73 kPa B. COLUMNS AND SHEAR WALLS ---------------- fy = 275 MPa ( 40,000 psi )
11. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS, & STRUCTURAL
100mm THK. CHB WALL - 2.11 kPa C. BEAMS AND GIRDER ------------------------- fy = 275 MPa ( 40,000 psi )
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER.
B. LIVE LOAD D. NON-LOAD BEARING WALL PARTITIONS, BEDDED SLABS,
ROOF - 1.00 kPa FLOOR AND ROOF SLABS, PARAPETS, CATCH BASIN,
TOILET - 2.40 kPa NOTES ON CONCRETE MIXES & PLACING AND SIDE WALK ----------------------------- fy = 275 MPa ( 40,000 psi )
OFFICE (BUSINESS PROCESSING OFFICES) - 2.90 kPa 1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY
CORRIDORS ABOVE GROUND - 3.80 kPa 2. ALL REINFORCING BARS SIZE 10mm OR BIGGER SHALL BE DEFORMED IN
EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS. ACCORDANCE WITH ASTM A706. BARS SMALLER THAN 10mm MAY BE PLAIN.
C. WIND LOAD (NSCP 2015) MAX. SIZE OF 3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN
BASIC WIND VELOCITY, V = 270 kPh LOCATION 28 DAYS STRENGTH MAX. SLUMP
AGGREGATE ACCORDANCE W/ TABLE A & TABLE B (TABLE OF LAP SPLICE & ANCHORAGE
P = qh[(GCpf)-(GCpi)] (DESIGN WIND PRESSURE)
COLUMNS 3000 PSI (20.7 MPa) 20mm 100mm LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE
where: qh = VELOCITY PRESSURE, kPa
BEAMS & SUSPENDED SLAB 3000 PSI (20.7 MPa) 20mm 100mm STAGGERED WHENEVER POSSIBLE.
GCpf = EXTERNAL PRESSURE COEFFICIENT
GCpi = INTERNAL PRESSURE COEFFICIENT SLAB ON GRADE 3000 PSI (20.7 MPa) 20mm 100mm
D. SEISMIC LOAD (NSCP 2015) OTHERS NOT INDICATED 2500 PSI (17.5 MPa) 20mm 100mm NOTES ON CONCRETE SLABS
CvI 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. 1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM
V = RT W (DESIGN BASE SHEAR)
SUSPENDED SLABS -------------------------------------- 20mm AND FROM THE TOP OF SLAB.
2.50 Cal SLAB ON GRADE 40mm
Vmax = Vmin = 0.11 CaIW -------------------------------------- 2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVATED SLAB
RW -------------------------------------- SHALL BE CUT AS FOLLOWS:
0.80 ZNvI WALLS ABOVE GRADE 25mm
Vmin = W (ZONE 4)
R BEAM STIRRUPS AND COLUMN TIES ----------------------- 40mm
WHERE CONCRETE IS EXPOSED TO
where: W = TOTAL DEAD LOAD 2/3 EARTH BUT POURED AGAINST FORMS ---------------------- 50mm BENT BENT
T = NATURAL PERIOD, C t (h n ) ; WHERE CONCRETE IS DEPOSITED BAR BAR
Where: C = NUMERICAL COEFFICIENT DIRECTLY AGAINST EARTH -------------------------------------- 75mm L1 L2
L1/4 TOP L1/4 L2/4 TOP
h = BUILDING HEIGHT 3. CONCTRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. RE-HAND BAR BAR
LING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR
I = IMPORTANCE FACTOR = 1.50 WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM
R = NUMERICAL FACTOR = 8.00 HOPPERS TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT BOTTOM BOTTOM
SEISMIC COEFFICIENT, Cv = 0.44 Nv EXCEED SIX (6) METERS IN AGGREGATE LENGTH. BAR BAR
Ca = 0.64 N
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS TYPICAL BAR BENDING AND CUTTING DETAILS FOR SLABS
NEAR SOURCE FACTOR (15km) , Nv = 1.0 UNLESS AUTORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS
Na = 1.0 WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH. 3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL
Z = SEISMIC ZONE = 0.40 (ZONE 4) 5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & BE PLACED BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER
S = SOIL TYPE = D SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. THE LONGER SPAN FOR REINFOCING BARS NEAR THE SUPPORTS. THE SPACING
6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS OF THE BARS AT THE COLUMN STRIPS SHALL NOT BE MORE THAN
2.2 DESIGN STRESSES IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, CURING
A. CONCRETE FOR FOOTING, COLUMNS, BEAMS AND SLAB ON FILL COMPOUNDS OR OTHER APPROVED METHODS. ONE AND A HALF (1 1/2) SLAB THICKNESS.
COMPRESSIVE STRENGTH @ 28 DAYS fc = 20.7 MPa (3,000 psi) 7. STRIPPING OF FORMS AND SHORES: 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN
FOUNDATION ------------------------------------------------ 24 HRS. TENSION AND SHALL NOT BE LESS THAN 0.0025 x GROSS-SECTIONAL AREA
B. REINFORCING STEEL BARS
SUSPENDED SLAB EXCEPT WHEN (Ag) OF THE SLAB(SEE SCHEDULE BELOW).
(STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi) 8 HRS.
ADDITIONAL LOADS ARE IMPOSED ------------------------
C. STRUCTURAL STEEL, ASTM-A36 WALLS ------------------------------------------------ 21 HRS.
FOR TRUSSES, BRACINGS & STRUTS fy = 248 MPa (36,000 psi) BEAMS ------------------------------------------------ 14 HRS.
SCHEDULE OF MINIMUM SLAB REINFORCEMENT
COLUMNS ---------------------------------------------- 21 HRS.
D. PURLINS THICKNESS MINIMUM TEMPERATURE BARS
COLD FORMED LIGHT GAGE SHAPES fy = 248 MPa (36,000 psi) 8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE 100 mm
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE 125 mm
E. MASONRY UNIT (CHB) POURING FOR APPROVAL.
150 mm
NON-LOAD BEARING CHB WALLS fm' = 3.45 MPa (500 psi) 9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS SHORINGS UNTIL THE
175 mm
F. WELDS - USED E-60xx ELECTRODE CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH.
200 mm
G. STRUCTURAL BOLTS, ASTM-A307
a. Ft = 96.60 MPa (14,000 psi) b. Fv = 69 MPa (10,000 psi) NOTES OF FOOTINGS
5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE
3. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN AND 1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF
96KPa ( 2000 psf). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, SOIL AND CONSTRUCTION JOINTS FOR SAME SHALL NOT BE LESS THAN
DISTANCES OF SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. 3.65 METER APART.
4. IN REFERENCE TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS CONDITIONS, UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE
IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTIONS, LOCATION DEPOSITING CONCRETE. 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB (TWO ADJACENT
OF DRAINS ETC.
2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE DISCONTINUOUS EDGES) AS SHOWN ON THE NEXT PAGE.
5. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS, AND ELEVATIONS BETWEEN
INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL.
THE STRUCTURAL PLANS, AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY
BOTH THE STRUCTURAL ENGINEERS AND THE ARCHITECT.

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
GENERAL CONSTRUCTION NOTES
DRAWN: SGD.
EPHEGEN D. TIGMO S-1 6
SIQUIJOR DISTRICT ENGINEERING OFFICE DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS NOTES ON BEAMS AND GIRDERS
A 6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM
FOR EVERY 4.50M OF SPAN , EXCEPT CANTILEVERS FOR WHICH THE CAMBER SHALL BE REINFORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.
MID-DEPTH OF SLAB AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT IN NO CASE LESS THAN
DOWN INTO EDGE BEAM. EXTENDED 7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING
AT EACH CORNER 20mm FOR EVERY 3.0M OF FREE SPAN. STRESSES OCCUR, SPLICES WHERE SO PERMITTED SHALL BE INDICATED IN THE
BARS MIN. OF 1,200 (4'-0") INTO BARS. 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT LEAST 125 %
BOTT. BARS SHOWN IN FIG. B-1. OF THE SPECIFIED YIELD STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE
BARS AT ANY ONE SECTION IS ALLOWED TO BE SPLICED THEREIN.
L1 L2
NOTES ON CONCRETE HOLLOW BLOCK WALLS

400
2 BARS
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC
BLOCKS SHALL BE REINFORCED AS SHOWN IN THE SCHEDULE OF CONCRETE
38mm HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT.
0

SLAB
60

OPENING CLEAR 2. PROVIDE 150mm x 300mm STIFFENER COLUMN REIFORCED WITH 4-12mm WITH
0
60

AND AT EVERY 3.0M LENGTH OF CONCRETE HOLLOW BLOCK WALLS UNLESS NOTED
IN STRUCTURAL PLANS.
2 BARS

400
FIG
SECTION "A"
B-1 SCHEDULE OF CONCRETE HOLLOW BLOCK AND CERAMIC BLOCK REINFORCEMENT
IN TWO WAY SLAB EXTEND BLOCK
BARS UP TO BEAM SUPPORT THICKNESS REINFORCEMENT NOTES
TABLE 'A' TABLE 'B'
OMIT TRIMMER BARS WHERE TENSION BARS COMPRESSION BARS HORIZONTAL VERTICAL A. MINIMUM LAPS AT SPLICE = 0.25M
60

OPENING IS FRAMED BY BEAM


0

B. PROVIDE RIGHT ANGLED REINFORCEMENT


EMBEDMENT LENGTHS AND EMBEDMENT LENGTHS AND 75 mm AT CORNERS 0.92M LONG
TYPICAL SLAB LAPPED SPLICED IN MILLIMETERS LAPPED SPLICED IN MILLIMETERS
125 mm C. WHERE CHB OR CER. BLK. WALL DOWELS
JOIN COL. R.C. BEAMS AND WALL DOWELS
TYPICAL CORNER SLAB DETAIL OPENING DET. BAR SIZE fc'= 20.7MPa(3000psi) fc'= 27.6MPa(4000psi) BAR SIZE fc'= 20.7MPa(3000psi) fc'= 27.6MPa(4000psi)
150 mm
(DEFORMED) (DEFORMED) WITH THE SAME SIZE AS VERT. OR HOR.
EMBEDMENT LAPPED EMBEDMENT LAPPED EMBEDMENT LAPPED EMBEDMENT LAPPED REINFORCEMENTS SHALL BE PROVIDED
200 mm
NOTES ON COLUMNS 300 300 300 300 225 300 200 300
1. PROVIDE EXTRA SETS OF TIES AT 100mm O.C. FOR TIED COLUMN REINFORCEMENT ABOVE AND 300 300 300 300 275 300 250 300
BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION EQUAL TO
THE GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF COLUMN
300 400 300 400 350 400 325 400 REINFORCING CONCRETE LINTEL BEAM IN
OR 450mm. 400 550 350 500 450 500 475 500 CONCRETE BLOCK WALLS
2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST MONO- 600 800 550 750 550 625 550 625
LITHICALLY WITH THE CORE WITH THE MINIMUM THICKNESS OF 40mm AND NOT LESS THAN LINTELS IN BLOCK WALLS
750 1000 650 850 625 675 625 675
40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT
3. WHERE COLUMNS CHANGE IN SIZE , VERTICAL REINFORCEMENTS SHALL SHALL BE OFFSET AT A 950 1300 850 1100 700 775 700 775 SPAN LENGTH fc' LINTEL
SLOPE OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm SHALL BE PROVIDED ("L") (L+0.40M) (MPa) (MM) BOTTOM TOP STIRRUPS
NOTE : TOP PLAIN BARS , MULTIPLY VALUE BY 2 NOTE : TOP PLAIN BARS , MULTIPLY VALUE BY 2
THRU OUT THE OFFSET REGION.
VALUES GIVEN ABOVE CAN ALSO BE USED 1.20M 1.60M 200
4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN FOR COLUMNS. 150M 1.90M 14.0 200
REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND THE 1.80M 2.20M 200
SPLICE LENGTH SHALL NOT BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED
MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS 2.10M 2.50M 250
ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES 3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO 2.40M 2.90M 17.0 250
THE FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL 2.70M 3.10M 250
BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm.
B BE AS SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B' FOR COMPRESSION BARS
3.00 3.40M 300
UNLESS SPECIFIED IN PLAN S. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN OR 3.30 3.70M 20.0 300
350mm. MAX.

WITHIN A DISTANCE TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. AT LEAST 3.60 4.00 300
TWO STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.
10
d

H
m

SPACED AT 1.0M ON CENTER. IN NO CASE SHALL THERE BE LESS THAN TWO (2)
in
.

SEPARATORS BETWEEN TWO LAYERS OF BARS. 12 THK. EXPANSION JOINT


WITH MASTIC FILLER
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES
CROSS-TIE SHALL BE AS SHOWN IN FIG. B-2 UNLESS SPECIFIED ELSEWHERE. CHB WALL
JOINT HOOP SPACE @ "2Sh" WHEN
CONF. REINF.

THERE ARE BEAMS HAVING WIDTH OF

(DOWEL)
FOR SIZE AND SPACING
D

AT LEAST ONE-HALF THE COLUMN

400
WIDTH & DEPTHS NOT LESS THAN OF HOR. & VERT. BARS
LAP SPLICE LENGTH: CHB WALL SEE CONSTRUCTION NOTES.
JOINT REINF.

THREE QUARTERS OF THE DEEPEST


BEAM THAT FRAME INTO FOUR AT ANY LEVEL NO MORE THAN
ALTERNATE BARS SHOULD BE b FOR SIZE AND SPACING
SIDES OF THE COLUMN. ALL OTHER
OF HOR. & VERT. BARS
CONDITIONS USE HOOPS @ "Sh" CENTERS. SPLICED. MIN. DISTANCE BET.
SEE CONSTRUCTION NOTES.
CONF. REINF.

TWO ADJACENT BARS SPLICES MAIN REINFORCEMENT


t
SHALL BE 600mm. CORNER WALL OPENING OR END WALL
D

WITHIN CENTER
Sh

HALF OF "H"

WEB BARS
L/4
ht SEE NOTE

t OR 1/4 D
R.C. COLUMN OR WALL
t
COLUMN TIES AS

FOR COL. BAR SPLICES SEE TABLE SEE NOTE SLEEVES FOR UTILITY
TOP BARS @ SUPPORT (CONT.)
PER SCHEDULE

OF MIN. LAP SPLICE LENGTH OF D PIPES MAX. 1/5 D 12 THK. EXPANSION JOINT DOWEL BARS TO MATCH
COLUMN REINFORCEMENT REQ'D. BOTT. BARS @ SUPPORT CHB HOR. BARS
WITH MASTIC FILLER
(SPACING OF TIES ALONG THIS REGION
SHALL NOT BE LESS THAN 100mm) CHB WALL 12 THK. EXPANSION JOINT
SEPARATOR WITH MASTIC FILLER
JT. REINF.

SEE NOTE
CONF. REINF.

EACH SIDE OF SLEEVES


Sh
D

(DOWEL)
NOTE: TYP. DET. FOR SLEEVES

400
NOTE 1
THRU CONCRETE BEAM
JOINT REINF.

ALL CONCRETE REINF. DETAIL SHOULD FOR SIZE AND SPACING


BE DONE IN ACCORDANCE WITH ACI BOTTOM BARS 20 mm CLEAR FOR JOIST OF HOR. & VERT. BARS
SPLICE
DETAILING MANUAL LATEST EDITION AT MID SPAN 40 mm CLEAR FOR BEAMS SEE CONSTRUCTION NOTES. 400
AND GIRDERS (DOWEL)
CONF. REINF.

EXTRA TOP BARS


@ SUPPORT
INTERSECTION WALL INTERSECTING R.C. COL. OR WALL
D

FIG. B-2 FIG. B-3


TYPICAL COLUMN ELEV. SHOWING TYP. DETAIL OF COL. LAP SPLICE
DOWELS AND TIES SPACING TYPICAL CONNECTION DETAIL OF MASONRY WALL
& EXT. GIRDER TO COL. CONNECT.

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
GENERAL CONSTRUCTION NOTES
DRAWN: SGD.
EPHEGEN D. TIGMO S-2 7
SIQUIJOR DISTRICT ENGINEERING OFFICE DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
200 (MIN) 200 (MIN)
NOTES ON CONCRETE WALLS
FOR SIZE AND SPACING 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL MAIN REINFORCEMENTS TO BE
OF HOR. & VERT. BARS CONTINUOUS (TOP & BOTT. BARS)
@ 150 O.C. REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
SEE CONSTRUCTION NOTES
WHERE JOINTS IS AT POINT OF MAIN REINFORCEMENTS

(DOWEL)
STRESS, PROVIDE SHEAR RODS TO BE CONTINUOUS
DOWEL BARS TO MATCH
WALL REINFORCEMENT VERTICAL WITH ENGINEERS APPROVAL

400
CHB WALL THICKNESS SECTION
CHB VERT. BARS HORIZONTAL VERTICAL REMARKS 30 BAR DIA. 30 BAR DIA.
50 @ 300 O.C.
(MIN.) (MIN.)
100mm HORIZONTAL BARS VERT. 40

D/3
OPENING BARS

200
125mm AT CENTERS VERTICAL

t/3 t/3
D/3
HORIZ.

D
BARS TYPICAL 150mm BARS STAGGERED OUT

t/3

t
BARS

D/3
SECTION REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL BEAM SLAB
EXCEPT FOR WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL
FIN. FLR. LVL.
BE PROVIDED, AND FOR EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM
SHALL BE 50mm CLEAR. TYPICAL SLAB & BEAM
2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES CONSTRUCTION JOINT DET.
ELEVATION WHEN NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL
ENDS VERTICAL AND HORIZONTAL BARS SHALL BE SPLICED BY LAPPING A DISTANCE
EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE PROVIDED THAT
TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M.O.C.
3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER

NOTE:
ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT TO A U-FORM LIKE PROVIDE THESE ADDITIONAL BARS FOR
DOOR
FLR. SLAB OR BEAM DOWEL BARS TO STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED OPENING ALL OPENINGS PLUS BARS (NOT
38mm
MATCH VERT. BARS (SEE FIG.1) CLEAR
SHOWN) PARALLEL TO SIDE OF OPENING WINDOW
OPENING
EQUAL TO THE NUMBER OF TERMINATED
(DOWEL)

BARS AT OPENING
400
VERIFY ARCHITECTURAL

1. ALL JOINTS AND CELLS 30 BAR DIA. 30 BAR DIA. SEE ARCHITECTURAL & MECHANICAL

VERIFY DEPRESSION

550
CONTAINING REINFORCING PLANS FOR SLAB OPENING LOCATION.
(min.) (min.)
BARS SHALL BE FILLED
D=FOR BEAM

550
t=FOR SLAB

WITH CONCRETE GROUT.


2. FOR REINFORCEMENTS SEE
CONSTRUCTION NOTES.
TYP. EXTERIOR WINDOW & DOOR OPENING
(DOWEL)
400

550 550
D=FOR BEAM
FOR FLOOR SLAB ONLY NOTES OF STIRRUPS
2t=FOR SLAB
30 BAR DIA. 1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS OTHERWISE PERMITTED BY THE
(min.) STRUCTURAL ENGINEER.
TYPICAL CONNECTION DETAIL 2. REINFORCEMENT PARCIALLY EMBEDED IN CONCRETE SHALL NOT BE FILLED BENT, EXCEPT
TYP. SECTION OF MASONRY TYPICAL DETAIL FOR BEAM OF R.C. WALL AT CORNERS AS SHOWN IN THE DESIGN DRAWINGS OR PERMITTED BY THE STRUCTURAL ENGINEER.
PARTITION REINFORCEMENTS OR SLAB CHANGE SOFFIT
NOTES ON WELDS
1. USE E70xx ELECTRODES FOR ALL MEMBERS WELDED.
L
2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS OTHERWISE

D db

D+2db
SHOWN OR DETAILED IN THE DRAWINGS.

L
SEE CONSTRUCTION NOTES 4db or 65mm
FOR MASONRY WALL REIN-
NOTES ON STRUCTURAL STEEL
DOWEL TO MATCH
FORCEMENTS (TYPICAL) 1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE
FIN. FLR. LVL. CHB VERT. BARS

6d
SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC SPECIFICATION FOR THE
VARIES

b
300 DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDING LATEST EDITION.
NAT. GRD. LVL. 2. ALL STRUCTURAL STEEL SHAPES SHALL BE ASTM A36 STRUCTURAL STEEL UNLESS
(TYP.)
DOWEL

DOWEL BARS TO MATCH OTHERWISE INDICATED.


400

db
CHB VERTICAL BARS 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE MEMBERS
600 (MIN.)

FIN. FLR. LVL. CONNECTED.

12db
L
@ 300 O.C. 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM AWS E60 ELECTRODES.
250

250

5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A307 BOLTS.
D
L
NOTES ON EMBEDDED PIPES L1
400 400
1. ALL EMBEDED PIPES FOR UTILITIES, ETC. THAT PASS THRU BEAMS SHALL BE MAXIMUM
DOWEL TO MATCH
100mm OR D/3 WHICHEVER IS LESS DIAMETER SINGLE RIGID GALVANIZED IRON PIPE
CHB VERT. BARS UNLESS OTHERWISE OR APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY.
WHERE DEPRESSED
3. NO PIPES SHALL BE EMBEDED TO COLUMNS. MAIN BAR END HOOKS STIRRUP AND TIE HOOKS
300 SLAB OCCURS
(ALL GRADES) (ALL GRADES)
(TYP.) NOTES ON CONSTRUCTION JOINTS IN CONCRETE
DOWEL

BAR SIZE
400

BAR SIZE DIAMETER DIAMETER


1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE SHALL BE (DEFORMED) (mm) (DEFORMED) (mm)
D+2db L L D+2db L L
CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED.
60 75 125 150 40 125 85 100
250

75 100 150 200 50 165 115 115


DRIP MOULD DETAIL COLUMN
95 125 175 250 65 200 140 150
400 WINDOW CANOPY
BEAM 115 150 200 300 115 250 165 300
DRIP MOULD
0.05 150 200 230 450 150 365 230 405
TYPICAL CHB FOOTING DETAILS 0.05 DRIP MOULD 240 300 350 550
( WHERE APPLICABLE ) 0.0125 300 335 450 600
0.0125

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
DRAWN:
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO GENERAL CONSTRUCTION NOTES
SGD.
EPHEGEN D. TIGMO S-3 8
SIQUIJOR DISTRICT ENGINEERING OFFICE DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
DISPLAY AREA

DISPLAY AREA DISPLAY AREA

1200

1200

1200
BILLBOARD 50 x 50 HORIZONTAL (1200 x 2400 x 12 50 x 50 HORIZONTAL (1200 x 2400 x 5
COCO LUMBER MARINE PLYWOOD) COCO LUMBER MARINE PLYWOOD)

1000

1000

1000
50 x 75 VERTICAL 50 x 75 VERTICAL
EDGE OF THE ROAD COCO LUMBER COCO LUMBER
50 x 50 WOODEN
STAKE
GROUND LEVEL GROUND LEVEL
50 x 50 WOODEN GROUND
STAKE LEVEL

500

500

500
TRAFFIC
DIRECTION
1000
ROAD

ORIENTATION TYPICAL FRAME FRONT ELEVATION FRONT ELEVATION


ELEVATION (OPTION 1) (OPTION 2)

BILLBOARD FRAME
NTS

BILLBOARD DETAILS
NTS

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
BILLBOARD FRAME
DRAWN: SGD.
EPHEGEN D. TIGMO S-4 9
SIQUIJOR DISTRICT ENGINEERING OFFICE BILLBOARD DETAILS DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
COLUMN SCHEDULE BEAM SCHEDULE FOOTING SCHEDULE
DIMENSION DIMENSION REINFORCEMENT DIMENSION
COLUMN FOOTING FOOTING DEPTH OF
LOCATION REINFORCEMENT STIRRUPS QUANTITY BEAM NO. LOCATION STIRRUPS QUANTITY REINFORCEMENT QUANTITY
NO. NO. THICKNESS FOOTING
WIDTH HEIGHT WIDTH HEIGHT TOP BARS BOTTOM BARS WIDTH HEIGHT
FOOTING TO 2-50, 7-100, REST @ 150
400 400 8-20mm 2-50, 3-100, REST @ 125 6 GB-1 GROUND BEAM 300 350 5-16mm 3-16mm 12 F1 2150 2150 300 1500 8-20mm 6
GROUND FL.
GROUND FL. TO 2B-1 2ND FL 300 500 5-16mm 4-16mm 2-50, 10-100, REST @ 250 9
C1 400 400 8-20mm 2-50, 6-100, REST @ 125 6
A B C 2ND FL. F2 1950 1950 300 1500 8-20mm 3
2B-2 2ND FL 300 500 6-20mm 4-20mm 2-50, 8-125, REST @ 250 2
2ND TO RB 400 400 8-20mm 2-50, 5-100, REST @ 125 6
9000 2B-3 2ND FL 300 400 5-16mm 4-16mm 2-50, 8-100, REST @ 175 2
FOOTING TO
350 350 8-20mm 2-50, 3-100, REST @ 125 3
3000 3000 3000 GROUND FL. 2B4 2ND FL 300 400 4-20mm 4-20mm 2-50, 7-125, REST @ 175 1
GROUND FL. TO
C2 350 350 8-20mm 2-50, 6-100, REST @ 125 3 2B-5 2ND FL 300 400 4-16mm 3-16mm 2-50, 8-100, REST @ 175 3
2ND FL.

1 1 2ND TO RB 350 350 8-20mm 2-50, 5-100, REST @ 125 3


2B-6 2ND FL 250 350 3-16mm 3-16mm 2-50, 7-100, REST @ 150 1
2B3 2B1 2B1
2B-7 2ND FL 250 350 3-16mm 3-16mm 2-50, 7-100, REST @ 150 2 ROOF BEAM LINE
RB-1 250 400 3-16mm 3-16mm 2-50, 10-100, REST @ 175
2B5

2ND FL 15
3300

3300
2B7

2B1
2B1
S1 S1 S1

RB-2 2ND FL 200 300 2-16mm 2-16mm 2-50, 6-100, REST @ 125 2
400
2B4 2B2 2B2 4" CHB INTERIOR WALL STB-1 STAIR BEAM 250 350 3-16mm 3-16mm 2-50, 7-100, REST @ 150 1 50

2 2

50
7000

7000
6" CHB EXTERIOR WALL

CONSTRUCTION
O.C. EXTRA TIES
2B5

2B1

JOINT
1450

S2 H/3
10 MM HORIZONTAL BARS

THE SPACING OF LATERAL TIES


SEE COLUMN SCHEDULE FOR
2B6 SPACED @ 600 MM.

300
3700
2B7

2B1
S1 S1
SPACED @ 400 mm.
2B5

2B1
2250

STAIRWELL TENSION LAP SPLICE WITHIN


CENTER HALF OF COLUMN
GB
LENGTH WITH STIRRUPS,
2B3 2B1 2B1 (SEE SCHEDULE
600mm OR 40xBAR DIAMETER
3 3 OF BEAM)
WHICHEVER IS HIGHER

NGL
3150 2850 3000
PLAN

CONSTRUCTION
JOINT
9000
SPACED @ 400 mm.
H/3
50

DEPTH OF FOOTING

50
2ND FLOOR LINE

THICKNESS
SPACED @ 600mm
A B C FIN. FLR. LVL.

DIAMETER DOWELS
DOWEL BARS TO MATCH

SECOND FLOOR FRAMING PLAN


N.G.L
CHB VERT.BARS

50
30 BAR
350

CONSTRUCTION
SCALE 1:100MTS H/3 O.C. EXTRA TIES

600

JOINT
250

300
SECTION 10 MM BOTTOM BARS
WIDTH TENSION LAP SPLICE WITHIN
SPACED @ 300 MM.
400 CENTER HALF OF COLUMN LENGTH
WITH STIRRUPS, 600mm OR 40xBAR

A B
100mm THK. REINFORCED
CONCRETE SLAB ON FILL W/
C
SECTION DIAMETER WHICHEVER IS HIGHER

BOTHWAYS

THE SPACING OF LATERAL TIES


WALL- FOOTING DETAILS

SEE COLUMN SCHEDULE FOR


9000

CONSTRUCTION
10mm @ 100mm
1900 1100 3000 3000
SCALE 1:30MTS O.C. EXTRA TIES

JOINT
H/3
GRAVEL BEDDING

50
F2-C2 F1-C1 F1-C1 FFL
4" CHB INTERIOR WALL

100
1 1 6" CHB EXTERIOR WALL
GB-1 GB-1 GB-1

HEIGHT
1850

600

VARIES
WF-1

50
GB1 GB1
GB-1

WF-1
3300
GB-1

GB-1

10 MM HORIZONTAL BARS
WF-1

SPACED @ 600 mm.


1450

F1-C1 F1-C1 NGL


2 2 EMBANKMENT
7000

7000
WF-1

GB-1 GB-1
1450

F2-C2
SPACED @ 400 mm.
WF-1
GB-1

GB-1

3700
GB-1

1500
WF-1
WIDTH

50
2250

N.G.L.
F1-C1 F1-C1
0.20

75
3 3
GB-1 GB-1 GB-1
F2-C2
PLAN
0.55
0.35

3000 6000

9000
FOOTING-COLUMN DETAILS
A B C SCALE 1:30MTS

FOUNDATION PLAN WALL ON THE BEAM COLUMN TO BEAM CONNECTION


SCALE 1:100MTS SCALE 1:20MTS NOT TO SCALE

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, FOUNDATION PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
SECOND FLOOR FRAMING PLAN
WALL ON THE BEAM
DRAWN:
EPHEGEN D. TIGMO
SGD.
S-5 10
SIQUIJOR DISTRICT ENGINEERING OFFICE FOOTING - COLUMN DETAILS DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN WALL- FOOTING DETAILS CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
COLUMN TO BEAM CONNECTION ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
WIDTH WIDTH WIDTH
COLUMN COLUMN COLUMN
(W) CLEAR SPAN OF BEAM (L2) (W) CLEAR SPAN OF BEAM (L1) (W)

>2H 40D

A B C
9000 50mm 50mm 50mm 50mm B TOP BARS

3000 3000 3000


SEPARATORS IF THERE ARE TWO
OR MORE LAYERS OF BARS

BEAM
SPACED 1.0M ON CENTER

(H)

D
WEB BARS (REQ. 2-12mm
BARS FOR 600mm
1 1 DEPTH &ABOVE)
RB-1 RB-1 RB-1

L/3 L/3 L/3 L/3 BOTTOM BARS


STIRRUPS
AND WASHERS
RB-1

RB-1

RB-2

RB-1
CONSTRUCTION JOINT CONSTRUCTION JOINT CONSTRUCTION JOINT CONSTRUCTION JOINT
3300

3300
BOT. BARS
STIRRUPS

2 2
TENSION LAP SPLICE W/
STIRRUPS SPACED AT < D/4 OR 100mm
TOP BARS
BEAM DETAILS PURLIN
7000

7000
RB-1 RB-1 RB-1 SCALE 1:100MTS
ROOF BEAM SCHEDULE TOP CHORD

DIMENSION REINFORCEMENT
RB-1

RB-1

RB-2

RB-1
ROOF BEAM
3700

3700
100 X 50 X 15 X 2mm
LOCATION STIRRUPS QUANTITY SCHEDULE OF TRUSS MEMBERS AND WELDS LC -PURLINS @ 0.70 O.C.
NO. WIDTH HEIGHT TOP BARS BOTTOM BARS FULL WELD JOINT
WELDS 75 X 75 X 6 THICK
TRUSS (100mm ) CLEATS

RB-1 RB-1 RB-1 RB-1 2ND FL 250 400 3-16mm 3-16mm 2-50, 10-100, REST @ 175 15 MARKS MEMBER SIZE
MM
THICKNES
LENGTH MM
REMARKS
S MM
3 3 L1 L2 L3
0.427 THICK RIB TYPE
RB-2 2ND FL 200 300 2-16mm 2-16mm 2-50, 6-100, REST @ 125 2 A
50 X 50 X
6mm
8 FULL WELD ROOFING SHEET

745 40 X 40 X 10 2 - 50 X 50 X 6mm
B 8 75 40
5mm 0 TOP CHORD
2 1
3000 3000 3000 747
S-7 S-7
5
9000 4
S-7 110

1100
999 TOP AND BOTTOM DIAGONAL
M 2 - 40 X 40 X 5mm
6 CHORD MEMBERS
VERTICAL AND DIAGONAL
A B C 999
S-7 MEMBERS
TRUSS 2 - 50 X 50 X 6mm 1 - 40 X 40 X 5mm

1000 676 676

PURLIN DETAILS
999

2200
2352
3 971
L1 NOT TO SCALE
ROOF BEAM PLAN S-7

113
8
715

SCALE 1:100MTS 715

1100
111

L3
4
400 600 S-7 900 900 900 875 1000

1000 875 900 900 900 4575


1000 644 644
9150
FT - 1 2288 STITCH WELD
L2 L1
A B 100 X 50 X 15 X 2mm C
LC -PURLINS @ 0.70 O.C.
TRUSS TOP AND BOTTOM CHORD DIAGONAL MEMEBERS
970

TRUSS DETAILS
11150 6
101
2352 2352 1742 2352 2352 FT (FULL TRUSS) 2 - 50 x 50 x 6mm 2 - 40 x 40 x 5mm 970
6
101
HT (HALF TRUSS) 2 - 50 x 50 x 6mm 2 - 40 x 40 x 5mm 970 SCALE 1:30MTS
970 6
101
1 - 25 X 25 X 3mm
HT-4

HT-4

970 VERTICAL & DIAGONAL


1 1
2288

2288

2200

2200
8 MEMBERS
103 1 - 38 X 38 X 3mm
3
101 TOP & BOTTOM CHORD

4
1 048 110
HT-3 H HT-3
T- 1
T-

300
1 H
2288

2288

1000
HT-2 HT-2 1000 960 920 920 920 920 920 1000 1000
2 2
FT-1

FT-1

1000 940 920 920 920


9150

9150

4700
6560

HT - 3
TYPICAL FASCIA FRAME
2288

2288

H HT - 1
1 T-
T- 1
H
HT-3 HT-3 SCALE 1:30MTS
25 250 25
3mm GAP BETWEEN
50 50 ADJACENT PURLINS
HT-4

HT-4

100 x 50 x 15 x 2.0
2288

2288

3 3 LC PURLIN SLOTTED HOLES


50

ON PURLIN CONN.
25

2-8mm THK BASE LC PURLIN


BOLTS W/ NUT & ROUND HOLES ON
PLATE (300 X 300)
WASHER PURLINS
150

0.2
4-16mm X 250mm LONG

5
ANCHOR BOLTS PURLIN CONN: ANGLE BAR

0.2
2352 2352 1742 2352 2352

0.25 0.25 0.25


CLEATS 75 X 75 X 6mm
S
50

US

5 0
11150 (FILLET WELD TO TOP
R
FT
CHORD AND BOLT TO

1.0

.25
0.7
25 PO
PURLINS) OF STL ROOF

0
TO

5
0.2
STL ROOF

A B C 25mm THK LEVELING GROUT

5
5
77 2L - 50 x 50 x 6mm 0.7
4-16mm X 250mm LONG
ANCHOR BOLTS
PLAN SECTION A
0.25 0.50
1.00
0.25

ROOF FRAMING PLAN TRUSS-BEAM CONNECTION DETAIL PURLIN CONNECTION DETAIL


SCALE 1:100MTS
NOT TO SCALE NOT TO SCALE

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
ROOF FRAMING PLAN DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, ROOF BEAM PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
TRUSS DETAILS
BEAM DETAILS
DRAWN:
EPHEGEN D. TIGMO
SGD.
S-6 11
SIQUIJOR DISTRICT ENGINEERING OFFICE TYPICAL FASCIA FRAME DRAFTSMAN II SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN PURLIN DETAILS CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
PURLIN CONNECTION DETAIL ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
TRUSS- BEAM CONNECTION DETAIL ENGINEER II
SLAB SCHEDULE
250 445 ALONG LONG SPAN ALONG SHORT SPAN
SLAB THICKNESS REMARKS
TOP BOTTOM BENT TOP BOTTOM BENT

190
250

200

250

200
S1 125 TWO - WAY SLAB

200
400
150 S2 125 ONE - WAY SLAB
300 250
150

1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 DETAIL 6 DETAIL L/4 L/2 L/4


S-7 SCALE NTS S-7 SCALE NTS S-7 SCALE NTS S-7 SCALE NTS S-7 SCALE NTS S-7 SCALE NTS

GUSSET PLATE DETAILS


NOT TO SCALE

16
SECOND FLOOR LEVEL
15

14

13

12
1.50

11
MAIN TOP BAR
10

1.00 9
MAIN BOTTOM BAR

0
8

15
LANDING
3.20

0.35

7
STB1 SEE DETAILS DOWN INTO EDGE BEAM. EXTENDED
6
0.25
BARS MIN. OF 1,200 (4'-0") INTO BARS.
5

4
1.50

3 0.25
BOT. SHORT
BOT. LONG
0.20 0.20
0.25

60
2
PLAN

0.
60
1

0.
GROUND FLOOR LEVEL
0.20

LONG SPAN (L2) LONG SPAN (L1) LONG SPAN (L3)

0.
0.20

60
NATURAL GRADE LEVEL TOP BARS ALONG SHORT SPAN
TOP BARS ALONG LONG SPAN

CORNER SLAB DETAIL L 2/4 L 1/4 BENT BARS L 1/4 L 3/4


0.60

1.00

SECTION
0.20

BOTTOM BARS ALONG LONG SPAN


0.60 BOTTOM BARS ALONG SHORT SPAN

TWO - WAY SLAB (S2)


SHORT SPAN (L1)
L 1/4 L 1/4

STAIR SCHEDULE BENT


BARS

MAIN REINFORMENT 12 250


BOTTOM BARS TOP BARS TEMPERATURE BARS
TEMPERATURE BAR 10 250
ONE - WAY SLAB (S1)

SECTION
STAIR DETAILS
NOT TO SCALE
SLAB DETAILS
NOT TO SCALE

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHT. NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM,
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
GUSSET PLATE DETAILS
DRAWN: SGD.
EPHEGEN D. TIGMO S-7 12
SIQUIJOR DISTRICT ENGINEERING OFFICE STAIR DETAILS SGD. SGD. SGD.
SUPPORT SOCIAL SERVICE, CONSTRUCTION DRAFTSMAN II
Larena, Siquijor
(COMPLETION) OF MULTI-PURPOSE BUILDING IN
SLAB DETAILS
CHECKED: SGD.
CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 7 13
ENGINEER III OIC - ASST. DISTRICT ENGINEER OIC - DISTRICT ENGINEER
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II
MH MH MH

CO CO CO 150mm ON BOTH SIDES OF

100
NGL

300

345
AIR AIR AIR

500
SPACE SPACE SPACE

SCUM
LEVEL

D/2

D/2
GRAVEL GRAVEL
OUTLET

1400
1600
DIGESTION
ST CHAMBERS LEACHING
CHAMBER
LEACHING
CHAMBER

6" THK. CHB w/ 10mm CAPACITY

D/2

D/2
6" THK. CHB
HORIZONTAL AND
VERTICAL @ 600 O.C.B.W. P-TRAP TO V.T.R.
4" THK. CHB WYE

100
2% SLOPE REDUCER
LOOP VENT
WYE
TEE

STANDARD PIPING

100
UPPER FLOOR LINE
SPACED AT 300mm
CO
BOTHWAYS
2000 1000 1000 DOUBLE WYE

4000
HORIZONTAL TO HORIZONTAL LOOP VENT

FD
SECTION FINISH FLOOR
LAV
R.C. SLAB
MORTAR GROUTING
WC
C.O.

10mm MATT. BARS


SPACED @ 150mm
WYE
FD FD O.C.B.W. SANITARY TEE
CO
LAV LAV
LOWER FLOOR LINE

WC WYE
WC CO
PVC DRAIN
1/8 BEND WYE PIPE BENT

VERTICAL TO HORIZONTAL
HORIZONTAL TO VERTICAL FLOOR CLEAN OUT

1500
MH MH MH
BRANCH VENT
FINISH FLOOR MAIN VENT
R.C. SLAB STACK
OUTLET MORTAR GROUTING
CO CO CO FINISH FLOOR
C.O.
R.C. SLAB
C.O. MORTAR GROUTING

INLET PVC WYE

BENT
1998 998 1000 PVC P-TRAP
PVC DRAIN MAIN VENT
PIPE STACK PIPE
PVC DRAIN
3995
P-TRAP DETAIL MAIN VENT STACK
PLAN PVC WYE

FLOOR CLEAN OUT

GR. FL. WASTE WASTE LAYOUT SEC. FL. WASTE WATER LAYOUT SEPTIC TANK CHB WALL
PVC DRAIN PIPE

CLEAN OUT PLUG


SCALE 1:80MTS SCALE 1:80MTS
SCALE 1:30MTS PVC WYE

PVC DRAIN
PVC DRAIN PIPE PVC WYE
PIPE BENT

CHANGE OF
WALL CLEAN OUT
HORIZONTAL DIRECTION

PLUMBING SPECIFICATIONS
1. ALL PLUMBING INSTALLATION HEREIN SHALL CONFORM WITH THE LATEST RULES AND
REGULATIONS OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES AND OF THE LOCAL CITY
ORDINANCE.
CV M GV
FROM WATER SOURCE 2. PVC/POLYETHYLENE PIPES SHALL BE USED IN ALL PLUMBING UNLESS OTHERWISE SPECIFIED IN
THE PLANS.

3. ALL WATER DISTRIBUTION PIPES SHALL BE OF GALVANIZED IRON PIPE THREADED UNITS (SCH. 40) PLUMBING SYMBOLS
OR PVC PIPE.

4. ALL HORIZONTAL PIPINGS SHALL BE RUN IN A PRACTICAL ALIGNMENT AND AT A UNIFORM SLOPE
OR NOT MORE THAN 2% OR 2Omm RISE PER METER RUN. ST SEPTIC TANK

5. ALL PLUMBING FIXTURES SHALL BE NEW AND APPROVED TYPE, AS SPECIFIED IN PLANS. WC WATER CLOSET
LAV 6. SEWAGE DISPOSAL SYSTEM SUCH AS SEPTIC TANK AND THE GREASE TRAP SHALL BE WATERTIGHT
WC F SO AS NOT TO CONTAMINATE SOURCE OF POTABLE WATER. NLESS OTHERWISE SPECIFIED, ALL
LAV LAVATORY

FIXTURES SHALL BE VENTED.


F CB CATCH BASIN
7. LOCATION OF APPROVED PIPINGS CAN BE TRANSFERRED WHENEVER REQUIRED FOR PROPER
LAV LAV
EXECUTION ON OTHER TRADES, WITH THE CONDITION THAT THE SAID CHANGES MEET THE CO CLEAN OUT
WC WC F REQUIREMENTS OF THE ARCHITECT.

8. ALL PLUMBING INSTALLATION HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF DULY VTR VENT THRU ROOF
LICENSED MASTER PLUMBER OR SANITARY ENGINEER.
F FAUCET

SEPTIC TANK SPECIFICATIONS FD FLOOR DRAIN

1. NO SEPTIC TANK SHALL BE INSTALLED WITHIN OR UNDER THE BUILDING AND WITHIN 25M WATER LINE
FROM ANY SOURCE OF WATER SUPPLY.
WASTE WATER LINE
2. BOTH COMPARTMENTS SHALL BE PROVIDED WITH MANHOLES AND TIGHT COVERS
FOR REPAIR AND CLEANING PURPOSES. M WATER METER

3. INLET AND OUTLET PIPES (PVC) SHALL BE SO ARRANGED SO AS TO DELIVER THE GV GATE VALVE
SEWAGE TO THE MIDDLE.
CV CHECK VALVE
GR. FL. WATER LINE LAYOUT SEC. FL. WATER LINE LAYOUT 4. THE BOTTOM OF THE DIGESTIVE CHAMBER SHALL BE SLOPED WITH A MINIMUM OF TWO
PERCENT (2%) TOWARDS THE CENTER.
SCALE 1:80MTS SCALE 1:80MTS 5. NO LESS THAN 200mm HEIGHT OF AIR SPACE SHALL BE LEFT BETWEEN THE TOP OF THE
SEWAGE AND UNDERSIDE OF THE TANK COVER OR SLAB.

6. THE SEPTIC TANK SHALL BE VENTED THRU THE DIGESTIVE, LEACHING CHAMBER.

PROJECT TITLE & LOCATION: SHEET CONTENTS: DESIGNED: SGD. SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
DONAH MAE ROSE J. DURAN
Republic of the Philippines ENGINEER II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM, WASTE WATER LINE LAYOUT
REGIONAL OFFICE VII BASIC INFRASTRUCTURE PROGRAM (BIP),
MULTI-PURPOSE BUILDINGS/ FACILITIES TO
WATER LINE LAYOUT DRAWN: SGD.
P-1 13
SIQUIJOR DISTRICT ENGINEERING OFFICE PIPING STANDARDS EPHEGEN D. TIGMO
SGD. SGD. SGD.
Larena, Siquijor
SUPPORT SOCIAL SERVICE, CONSTRUCTION
(COMPLETION) OF MULTI-PURPOSE BUILDING IN
SEPTIC TANK DETAIL
PLUMBING SYMBOLS
DRAFTSMAN II
SGD. CHRISTIAN GEORGE B. PAL-ING RAKIL-ALI S. RAKI-IN, AER GUMER M. CASTILLO, DPA, ASEAN Eng. 1 13
BARANGAY SOLANGON, SAN JUAN, SIQUIJOR
CHECKED: ENGINEER III OIC - ASST. DISTRICT ENGINEER DISTRICT ENGINEER
PLUMBING NOTES AND SPECS BERNARD Z. DURAN CHIEF,PLANNING & DESIGN SECTION
ENGINEER II

You might also like