Professional Documents
Culture Documents
Methods of Estimating
Methods of Estimating
1}DREAWING: THE PLAN ELEVATION, SECTIONAL ELEVATION, AND DETAILED DRAWING DRAWN TO
A SCALE OF FULLY DIMENSIONS ARE REQUIRED, PLAN AND SECTIONAL ELEVATION DRWAN TO A
SCALE OF 1CM TO 1M WHERESA IN DETAIL DRAWING DRAWN TO A SCAKE OF 1CM TO 10 CM.
2 SPECIFICATIONS: THERE ARE 2 TYPES OF SPECIFICATIONS
1}GENERAL SPECIFICATIONS :GENERAL SPECIFICATIONS GIVE US THE NATURE,QUALITY AND
CLASS OF MATERIAL AND WORK. GENERAL SPECIFICATION FORM AM IDEA OF WHOLE BUILDING
AND STRUCTURE AND ARE USED IN PREPARING DETAILED ESTIMATE
2}DETAILED SPECIFICATIONS :THIS GIVE US THE DETAILED DESCRIPTION ABOUT THE VARIOUS
ITEMS OF THE WORK LAYING DOWN THE QUALITY AND QUANTITYOF MATERIAL,THEIR
PROPORTION,METHOD OF PREPERATION,WORKMANSHIP AND EXECUTION OF WORK. DETAILED
SPECIFICATION DESCRIBES EVERY ITEM OF THE WORK
3}RATES: THE RATES OF VARIOUS MATERIAL USED IN CONSTRUCTION AND THE WAGES OF
DIFEERENT CATEGORIES OF LABOUR, CARPENTER,BHISTHI,MANSON,MAZDOORETC FOR PREPARING
ESTIMATE.THELOCATION OF THE WORK IS NEAR AND ITS DISTANCE FROM THR SOURCE OF
MATERIAL AND COST OF TRANSPORT SHIOULD BE KNOWN