Professional Practice Model Exam Validated
Professional Practice Model Exam Validated
JIMMA UNIVERSITY
JIMMA INSTITUTE OF TECHNOLOGY
Important Note
This examination contains the course of Professional Practice & Ethics, Specification, and BOQ
Write your name only on this page. Writing your name on the other pages will automatically disqualify
you from this exam. This exam has 40 questions in total. Check that you have 6 different pages (including
this cover page).
Any person found cheating would automatically fail the entrance exam. Use the back of your question
papers as rough papers. If you have used all the backs of your papers, you can request for rough papers.
Using other papers will be considered cheating.
Answer neatly all the questions in the space provided on the answer paper. please make sure that you
have written all the required information on the answer sheet before you start to work on the examination
0|Page
Professional practice and ethics Jimma University Bachelor of Science in Architecture May 2023
DIRECTIONS:
This examination part is the Professional Practice & Ethics, Specification & BOQ. From the
given alternatives, choose the one that distracts the other answer that is the correct answer from
the given choices, and choose the letter of your choice in the separate answer sheet provided.
1|Page
Professional practice and ethics Jimma University Bachelor of Science in Architecture May 2023
2|Page
Professional practice and ethics Jimma University Bachelor of Science in Architecture May 2023
3|Page
Professional practice and ethics Jimma University Bachelor of Science in Architecture May 2023
c) Licensure and certification are both the legal requirements to practice architecture
d) Neither licensure nor certification is a legal requirement to practice architecture
24) What is the design-build project delivery method?
a) A project delivery method in which the architect and contractor work on separate contracts
b) A project delivery method in which the owner contracts with a single entity that provides both
design and construction services
c) A project delivery method in which the architect provides design services and the contractor
provides construction services under separate contracts
d) None of the above
25) How does the design-bid-build project delivery method work?
a) The owner hires an architect and then contracts with a separate contractor for construction
b) The owner hires a contractor who hires an architect to design the building
c) The owner hires an architect who also acts as the contractor for the construction phase
d) None of the above
26) What is the purpose of construction documents in architecture?
a) To provide information about the history and culture of the building location.
b) To provide detailed information about the design and construction of the building.
c) To provide information about the client's financial resources.
d) None of the above.
27) What is the role of the owner in the design and construction process?
a) To provide financial resources and oversee the entire project process
b) To hire the architect and contractor and provide input during the design process.
c) To physically construct the building.
d) None of the above
28) What is a change directive in architecture?
a) A written order requesting a change to the construction documents before construction begins.
b) A written order requesting a change to the construction documents during construction.
c) A request for additional funds to complete the construction project.
d) None of the above.
29) What is the purpose of the “Ethiopians with Disabilities Act” in architecture?
a) To provide funding for building construction.
b) To regulate advertising standards for architects.
c) To ensure that buildings and other facilities are accessible to people with disabilities.
d) None of the above.
30) What is the role of an expert witness in an architecture-related lawsuit?
a) To provide legal advice to the defendant.
b) To provide testimony regarding technical or professional matters in architecture.
c) To provide financial advice regarding the costs of construction.
d) None of the above.
31) What is the role of the architect during the contract administration phase of a project?
a) To oversee construction activities and manage the construction process.
b) To provide legal advice to the owner and contractor.
4|Page
Professional practice and ethics Jimma University Bachelor of Science in Architecture May 2023
THE END