The document outlines a 5-day test plan for an 8.33MVAr, 245/√3kV, 1-phase shunt reactor. The plan includes 33 tests that will be conducted following IEC 60076-6 standards and the customer's specifications. Routine tests include insulation resistance measurements, voltage withstand tests, temperature rise tests, and vibration analysis. Type tests involve determining the reactor's reactance and loss levels, harmonic content, acoustic sound, and dissolved gas analysis. All tests are aimed to ensure the reactor meets technical and safety requirements before final delivery.
The document outlines a 5-day test plan for an 8.33MVAr, 245/√3kV, 1-phase shunt reactor. The plan includes 33 tests that will be conducted following IEC 60076-6 standards and the customer's specifications. Routine tests include insulation resistance measurements, voltage withstand tests, temperature rise tests, and vibration analysis. Type tests involve determining the reactor's reactance and loss levels, harmonic content, acoustic sound, and dissolved gas analysis. All tests are aimed to ensure the reactor meets technical and safety requirements before final delivery.
The document outlines a 5-day test plan for an 8.33MVAr, 245/√3kV, 1-phase shunt reactor. The plan includes 33 tests that will be conducted following IEC 60076-6 standards and the customer's specifications. Routine tests include insulation resistance measurements, voltage withstand tests, temperature rise tests, and vibration analysis. Type tests involve determining the reactor's reactance and loss levels, harmonic content, acoustic sound, and dissolved gas analysis. All tests are aimed to ensure the reactor meets technical and safety requirements before final delivery.
Preliminary detailed Test plan for Sl. No. I300306-01 LTD Final Test: xx.xx.xxxx to xx.xx.xxxx Routine and Type Tests Rating: 8.33MVAr, 245/√3kV, 1-Φ Shunt Reactor Day Day 1 Day 2 Day 3 Day 4 Day 5 Reference standard: IEC 60076-6 and Customer’s Specifications Date xx.xx.xxxx xx.xx.xxxx xx.xx.xxxx xx.xx.xxxx xx.xx.xxxx Seq. Tests according to Inspection and Test Plan Time 0900-2000 0900-2000 0900-0000 0000-2200 0900-2100 1. Oil BDV, Moisture Content, & DGA prior to all tests(1) Routine X 2. Check on CTs ratio and polarity Internal X 3. Measurement of winding resistance Routine X 4. 2kVAC Voltage withstand test between core, frame and earth for 1 minute Routine X 5. Meas. of Insulation resistance between core, frame and earth for 1 minute at 2kVDC. Routine X 6. Measurement of Insulation Resistance and Polarization Index Routine X 7. Measurement of Capacitance and Tan delta of Winding and Bushings at 5kV & 10kV Routine X Knee point voltage meas of Reactor upto 1.5pu by DC charging-discharging method 8. Type X In cold state 9. Full Wave Lightning Impulse Voltage withstand test on Neutral Routine X X 10. Full Wave lightning impulse with Chopped Wave Lightning Impulse test on Line terminals Routine X 11. Switching Impulse Voltage withstand test Routine X 12. Applied voltage test for 1 minute Routine X 13. Induced Over Voltage test with Partial Discharge measurement IVPD test Routine X 14. Dissolved Gas Analysis after dielectric and before temperature rise test (2) Routine X 15. Measurement of Reactance & loss at 90, 100 and 110% of Rated Voltage in cold State Routine X 16. Measurement of harmonics content of current at 245/√3kV Type X 17. Measurement of acoustic sound level in cold state at 245/√3kV in cold state Type X 18. Measurement of vibration in tank stress cold state at 245/√3kV (1.0 p.u.) Routine X 19. Measurement of vibration and tank stress in cold state at 269.5/√3kV (1.1 p.u.) Type X Temperature Rise Test at 245/√3kV for 24 Hours 20. Type X X (Thermal images Thermal images -start, 4 more times during test, steady state) 21. Meas. of Vibration and Tank Stress in hot state at 245/√3kV (1.0 p.u.) Type X 22. Measurement of Reactance and loss at 90, 100 and 110% of Rated Voltage in hot state Type X 23. Measurement of vibration and tank stress in hot state at 269.5/√3kV (1.1 p.u.) Type X 24. Measurement of Acoustic Sound Level at 245/√3 kV in hot state Type X 25. Dissolved Gas Analysis after Temperature Rise Test (3) Type X 26. Oil Leakage Test on Reactor tank Routine X X 27. Frequency Response Analysis test with oil Routine X 28. Dimensional & visual inspection of Reactor Routine X 29. Functional checks on Control Panels, accessories and protective devices and 2.0 kV test. Routine X 30. Test Report Signing Routine X 31. Tank vacuum test -Suppler test report Review X
Form No. EM-TR/QT/FR/22 Rev No:00 Date: 22.07.2016
ENERGY SECTOR, TRANSFORMER WORKS Page 2 of 2 Customer: REC Power Development & Consultancy Preliminary detailed Test plan for Sl. No. I300306-01 LTD Final Test: xx.xx.xxxx to xx.xx.xxxx Routine and Type Tests Rating: 8.33MVAr, 245/√3kV, 1-Φ Shunt Reactor Day Day 1 Day 2 Day 3 Day 4 Day 5 Reference standard: IEC 60076-6 and Customer’s Specifications Date xx.xx.xxxx xx.xx.xxxx xx.xx.xxxx xx.xx.xxxx xx.xx.xxxx Seq. Tests according to Inspection and Test Plan Time 0900-2000 0900-2000 0900-0000 0000-2200 0900-2100 32. Tank pressure test- Suppler test report Review X 33. Frequency Response Analysis test without oil Routine Rev. 00 Test Plan according to: Technical specification of bus reactor up to 400kV Reactor and IEC 60076 Date:17.12.2021 Prepared By: Amol Mane
Note: Test Plan may change based on Manpower and Machine Availability.
Form No. EM-TR/QT/FR/22 Rev No:00 Date: 22.07.2016