Scope of Work SOW ID:041287

Effective Date: 09-22-2020


This is an estimate of expenses. Actual expenses are subject to change

Project Details
Name: Nguyen, Eric - 5507 Jelsma Avenue Phone: (702) 538-4989

Address: 5507 Jelsma Avenue, Las Vegas, NV 89141 Job ID: F063590

Primary Finance: Cash Amount: 14,152.00 Dealer Fee: Cash 0 Year - 0%

Secondary Finance: Amount: Dealer Fee:

Tertiary Finance: Amount: Dealer Fee:

Dealer: Enlyten Energy LLC Rep: Jared Saavedra

Sold SOW
System Size: 4,640 Quantity: 16
Module: Qcell 290W- Q.PLUS BFR-G4.1- 290

Sold PPW: 2.8884 Gross Price: 14,152.00 Contract Version: 85%


Inverter Quantity: 1

Sold Production Gurantee: 8,341

Project SOW
System Size: 4,640 Quantity: 16 Gross Price: 14,152.00
Module: Qcell 290W-

Q.PLUS BFR-G4.1- 290

Quantity: 1 Net PPW: 2.7327


Inverter: SE3800H - EV

Projected Year 1 Production: 8070

Sold Production Guarantee: 8,341

PG % Offset: 97*

*PG% Offset is the Projected Year 1 Production (based on the site audit resultts) compared to the production guarantee amount written on the installation

agreement. PG % Offset is NOT the system's offset compared to the customer's usage.

Adders

EV Charger - $750 (Added in New Deal stage)


Inverter in Garage - $240 (Added in New Deal stage)
NVE Load Justification Letter - $300 (Added in New Deal stage)
Critter Guard - $182.25 (Added in Project Review stage)

EV Charger Notes:
Inverter in Garage Notes: Inverter in Garage - $240
NVE Load Justification Letter Notes: NVE justification
Critter Guard Notes: Critter Guard (121.5')
Total Cost: $1472.25
Design Notes

2 story, S Tile, 2 arrays


16 QCell 290W
Tilt - 23°
2x4 Truss, 24" OC
Modified Setbacks
EV Inverter in garage
30A 2P Sq. D PV in MSP

Install Notes

2 story, S Tile, 2 arrays


16 QCell 290W
Tilt - 23°
2x4 Truss, 24" OC
Modified Setbacks
EV Inverter in garage
30A 2P Sq. D PV in MSP

POI :
30A 2P Sq. D PV in MSP

Install Completexity :1

Battery Notes

Install SOW

Inspection SOW
Aurora Shade Report

Customer Designer Organization


Eric Nguyen Jared Mendivil Freedom Forever

Address Coordinates Date


5507 Jelsma Avenue (35.998961, -115.216774) 22 October 2020
Las Vegas, NV 89141

Annual irradiance kWh/m2/year


2,450 or more

2,100

1,750

1,400

1,050

700

350

Summary
Array Panel Count Azimuth (deg.) Pitch (deg.) Annual TOF (%) Annual Solar Access (%) Annual TSRF (%)

1 11 180 23 99 98 97

2 5 270 23 83 99 82
Weighted average
- - - - 98.5 92.6
by panel count

Monthly solar access (%) across arrays


Array Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

1 97 98 98 99 99 99 99 99 99 98 97 97

2 98 99 99 99 99 99 99 99 99 99 98 98

1/3
BOS
Aurora Shade Report MAX FIT
Customer Designer Organization
Eric Nguyen Jared Mendivil Freedom Forever

Address Coordinates Date


5507 Jelsma Avenue (35.998961, -115.216774) 22 October 2020
Las Vegas, NV 89141

Annual irradiance kWh/m2/year


2,450 or more

2,100

1,750

1,400

1,050

700

350

Summary
Array Panel Count Azimuth (deg.) Pitch (deg.) Annual TOF (%) Annual Solar Access (%) Annual TSRF (%)

1 8 180 23 99 99 98

2 1 0 23 65 99 64

3 3 270 23 83 99 82

4 3 90 23 84 99 83

5 2 90 27 83 77 64
Weighted average
- - - - 96.1 86.3
by panel count

Monthly solar access (%) across arrays


Array Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

1 97 98 99 99 99 99 99 99 99 98 97 97

2 97 98 98 99 99 99 99 99 99 98 98 98

3 98 99 99 99 99 99 99 99 99 99 98 98

4 99 99 99 99 99 100 99 100 99 99 98 98

5 39 51 70 88 94 94 95 91 77 55 42 32
1/3
Date: 10-22-20

RESIDENTIAL ESTIMATED ENERGY USAGE


Periodical
Customer Information Characteristics/Assumptions Maximum
Name: Nguyen, Eric Utility Season 12 Months
5507 Jelsma Avenue Heating Season 5 Months
Address:
Las Vegas, NV Air Conditioning Season 7 Months
Utility: NVEnergy
Loads Qty. Monthly Consumption (kWh) Months/Year Total (kWh)
Lighting Circuits
General Lighting 8 3 12 288
Outdoor Lighting 2 2 12 48
Laundry Circuits
Water Heater 110 12
Washer 1 3 12 36
Electric Dryer 33.5 12
Entry Circuits
Garage Door Opener 1 7 12 84
Gate Motor 10 12
Kitchen Circuits
Refrigerator w/ Freezer 1 56 12 672
Freezer 34 12
Dishwasher 1 13 12 156
Garbage Disposal 1 3 12 36
Range/Oven 1 20 12 240
Microwave 1 11 12 132
Entertainment
Computer & Printer 1 8 12 96
Television 3 18 12 648
Cable Box 2 10 12 240
Satellite Dish 11 12
Internet Router 1 11 12 132
Stereo 5 12
Comfort Controls
Ceiling Fan 3 4 5 60
Electric Furnace 881 5
Electric Space Heater 165 5
Central AC 1 1250 7 8750
Outdoor Equipment
Pool Motor 215 12
Spa 192 12
Sprinkler System 36 12
EV (Electric Vehicle) Charging
Telsa/Other 360 12
TOTAL: 11618

To whom it may concern:


Yoursolarplans, Inc. has conducted a consumption analysis for the residence mentioned
above using available utility bill data and electrical loads in the main service panel.
The estimated usage for the residence mentioned above is 11618 kWh.
The proposed 4.6kW DC PV system has an estimated yearly production of 8070 kWh
Therefore, the new PV system will offset approximately 100% or less of the annual energy
consumption.
Customer Information

Customer Name: Nguyen, Eric - 5507 Jelsma Finance Company: Cash


Avenue

Assessment Date: 09/28/2020


Full Address: 5507 Jelsma Ave, Las Vegas, NV
89141, USA
Job Notes: SA complete. The attic was
accessible with 2x4 rafters that
HOA Information: are spaced at 24". The inverter
and disconnect will be located
on the left side of the home next
to the MSP. The roof is in good
condition for installation on all
MPs. All MPs have been
measured to max fit with SOP
fire setbacks in place.

Page 1 of 9
Photos

Home Photos - Photo: Front of Home (include address number) Home Photos - Photo: Sides of Home (Left, Right, Back)

Attic and Structure Information - Photo: Inside Attic (multiple photos) Attic and Structure Information - Photo: Inside Attic (multiple photos)

Page 3 of 9
Attic and Structure Information - Photo: Inside Attic (multiple photos) Attic and Structure Information - Photo: Inside Attic (multiple photos)

Attic and Structure Information - Photo: Inside Attic (multiple photos) Electric Information - Photo: MSP Open (Deadfront On)

Page 4 of 9
Electric Information - Photo: Main Service Panel Labels (all) Electric Information - Photo: MSP Open (Deadfront Off)

Electric Information - Photo: MSP Open (Deadfront Off) Electric Information - Photo: MSP Open (Deadfront Off)

Page 5 of 9
Electric Information - Photo: Main Service Panel Breaker Sizes (Close Electric Information - Photo: Main Service Panel Breaker Sizes (Close
Ups) Ups)

Electric Information - Utility Meter (Close Up + Pull Back) Roof Information (MP1 - MP4) - Roof 2 Photos - Chalked Outline +
Detailed (Multiple Photos)

Page 6 of 9
Roof Information (MP1 - MP4) - Roof 2 Photos - Chalked Outline + Roof Information (MP1 - MP4) - Roof 2 Photos - Chalked Outline +
Detailed (Multiple Photos) Detailed (Multiple Photos)

Roof Information (MP1 - MP4) - Roof 2 Photos - Chalked Outline + Roof Information (MP1 - MP4) - Roof 2 Photos - Chalked Outline +
Detailed (Multiple Photos) Detailed (Multiple Photos)

Page 7 of 9
Roof Information (MP1 - MP4) - Array 2 Roof Condition Roof Information (MP1 - MP4) - Roof 3 Photos - Chalked Outline +
Detailed (Multiple Photos)

Roof Information (MP1 - MP4) - Roof 3 Photos - Chalked Outline + Roof Information (MP1 - MP4) - Array 3 Roof Condition
Detailed (Multiple Photos)

Page 8 of 9
DocuSign Envelope ID: 2187E24C-A314-413A-992F-C83D0B9741FD

Supply and Installation Agreement (Residential)


Home Improvement Agreement
(V5-62020)
9165 S. Jones Blvd. Freedom Forever Nevada, LLC
Las Vegas, NV 89139 License #0082973

System Specifics

System Size System Warranty


_____ kW
4.64 25 Years

The Freedom Forever Promise* System Cost


We provide a money-back energy production guarantee.
Total Contract Price: $ 14,152.00
We warrant all of our roofing work.
We warrant and repair the system (as defined below).
We fix or pay for any damage we may cause to your property. Down Payment: $ 1,000.00

We provide 24/7 web-enabled monitoring at no additional cost.


*Please refer to specific terms in your Supply and Installation Agreement Amount Due: $ 13,152.00

First Year Production (Estimate): 8341 kWh

Notices of Cancellation may be sent to this address: Date Signed by Customer:


Freedom Forever Nevada, LLC
9/22/2020 | 8:33 PM PDT
43445 Business Park Dr. Suite 110, Temecula, CA 92590

Freedom Forever is a licensed contractor in each state it


Operates in. For more information about our contractor licenses,
Please visit www.freedomforever.com/licenses

License Monetary (BID) Limit: $225,000.00

1 1|Page
DocuSign Envelope ID: 2187E24C-A314-413A-992F-C83D0B9741FD

Homeowner ("Customer")

Homeowner Name: Eric Nguyen Co-Homeowner Name (if applicable):


Phone: (702) 538-4989 Phone:

Installation Address ("Property")

5507 Jelsma Avenue, Las Vegas, NV 89141

Total Installed System Price ("Contract Price") Down Payment


$ 1,000.00
$ 14,152.00
(Due on Effective Date)

Description of the System to be Installed ("System")

Panels: Qcell 290W Additional Components | Allowances | Notes | Variances:


Courtesy Tree Trimming, EV Charger
Inverters: SolarEdge
Monitoring System: SolarEdge
Mounting Type: Roof Mount

Signatures

Independent Sales Representative Customer Customer #2 (if applicable)


Sales Rep Signature: Customer Signature: Customer Signature:

Name: Jared Saavedra Name: Eric Nguyen Name:

Phone: (702) 354-0256 Date: 9/22/2020 | 8:33 PM PDT Date:

Date: 9/22/2020 | 8:44 PM PDT

License Number:

I hereby represent that this agreement was


presented to the customer and that I
obtained his/her signature to this
agreement.

• The Customer(s) are collectively referred to as the Customer.


• The Customer is entitled to a completed copy of this Agreement, signed by both Customer and Freedom Forever, before any work
may be started.
• The Customer has the right to require any contractor that Freedom Forever may hire to have a performance and payment bond, but
it is not required.
• The Customer understands that in order to realize the benefit of the solar investment tax credit, Customer must have federal income
tax liability that is at least equal to the value of the tax credit. Customer hereby acknowledges that Customer has sought tax advice
from a qualified tax professional and understands any tax benefits and burdens arising from this Agreement.
• The Customer may cancel this Agreement at any time prior to midnight of the third business day after Customer receives a signed
and dated copy of the Agreement. Please see attached Notice of Cancellation form for more information.
• Est. Installation Commencement Timeline: Freedom Forever will begin the Work (as defined below) within 30 business days from the
date of receiving all required permits, or the date the property is ready for installation, whichever comes later.
• Est. Installation Completion Timeline: The Work will be substantially completed approx. 30 days from the installation of the System.
• ITC/REC Value: Refer to tax professional.