Professional Documents
Culture Documents
MHP-23-DEC-CEB-0218 From DEIC
MHP-23-DEC-CEB-0218 From DEIC
: MHP-23-DEC-CEB-0218
Date: May 17, 2023
Sub: Submission of Gate and Hoist Layout of Surge Tank Gate – Rev.0
Dear Sir,
We are pleased to submit herewith the following drawings and/or document for your
Approval. □ Re-approval. □ Confirmation. □ Reference. □ Information.
□Final(approved). □As-build.
No. Drawing No. REV. Title or Description Remarks
01 DEC-MHP-HM-203 0 Gate and hoist layout of surge tank gate AA
NOTE: (remarks) AA: Application for approval
RA: Re-application for approval
RD: Information or Reference (No need to return)
AD: Approved Drawing (For Work) (No need to return)
<Recipients>
L C O CO CL Name (Remarks) Address
3 CEB PMU Office Moragolla, Gampola, Sri Lanka
5 CEB Consultants Moragolla, Gampola, Sri Lanka
O: Original letter + attachment, C: Copy of letter + attachment, L: Original letter only,
CO: Copy of letter with original attachment, CL: Copy of letter only
Best regards,
Wu Zhangwei
Contractor’s Representative (MHP)
Dongfang Electric International Corporation
18 Xixin Avenue, High-tech Zone West Park, Chengdu, Sichuan 611731, P.R. China
Tel: +86 28 87898693, Fax: +86 28 87019555 E-mail: decmhp@dongfang.com.cn Page 1 of 1
Gate,Hoist Characteristic Table
1 Type of gate Bonnet-slide gate
Profile
2 Opening width 3.8m
4000 Overhaul hook 1 3 Opening height 3.8m
2000 20kN 4 Sealing width 3.92m
5 Sealing height 3.9m
1400 1800
3 Gate 6 Design water-head 32m
600
4000
7 Total water load 4594kN
1565
EL.579.25 8 Supporting type Sliding plate
1300
10 Lifting point distance 2300mm
4 Lifting centerline 11 Amount of opening 1
7850
12 Amount of gates 1
105
13 Hoist type Fixed winch hoist
Hoist 14 Lift force 2×250kN
1400
EL.571.40 15 Amount of hoist 1
EL.570.40
16 Lift of hoist 58 m
2
CENTERLINE OF Vent area≥0.1m
SURGE TANK GATE SLOT
30
Q1 Q4
890
1060
FLOW
800
2300
Minimal opening
4080
Q2 Q3
800
1060
250
890
Q1 Q4
1
30
EL.521.30
250
45°
600
2
3900
5030
30 1800 30
FLOW
Rev.
0
3800
2023.05.15
330
DATE
500
1250
PLAN AT EL.516.00
JG
REASON FOR REVISION
500
FOR APPROVAL
450
300
500
4300
3800
FLOW
500
DEC-MHP-HM-203
DRAWING NO.:
DRAWING TITLE
SACLE: 1:150
MINISTRY OF POWER AND RENEWABLE ENERGY
CEYLON ELECTRICITY BOARD
OF SURGE TANK GATE