1. Scaffold used for abrasive blast cleaning (sand blasting) shall be classified as __
_____________ if there is potential for build-up of abrasive on the platform.
a. medium-duty
b. light-duty
c. special-duty
d. heavy-duty
a. 120 kg/m2
b. 180 kg/m2
c. 240 kg/m2
d. greater 240 kg/m2
a. ledgers
b. intermediate transom
c. posts
d. scaffold planks
4. After stopping a fall, what should be the best thing to do with Personal fall arrest system
components?
a. BS 1139
b. ANSI A14.2
c. SAES-A-112
d. GI 8.001
7. What shall be used to spread the load on sand, made-up ground, asphalt pavement,
wooden floors and other soft or slippery surfaces?
Page 1 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
a. base plate
b. screw jacks
c. timber sills (sole boards)
d. none is given
a. screw jacks
b. sill (sole board or sole plate)
c. base plate
d. none is given
12. Scaffold platforms, landings, walkways during scaffold erection, dismantling and
alteration shall be
13. Bearers (transoms) and board bearers (intermediate transoms) shall be installed on
_______________
Page 2 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
14. What kind of bracing connected as close as possible to the intersection (node point) of
the bearer (transom) and post (standard)?
a. transverse (sectional)
b. vertical bracing
c. longitudinal (façade)
d. none is given
16. What kind of scaffold tag shall be installed when it is safe for use during the time of
inspection?
a. yellow tag
b. green tag
c. red tag
d. none is given
17. What is the maximum number of working levels required for light-duty tube and
coupler scaffold with six platform levels?
a. 2
b. 3
c. 1
d. 4
a. 2 weeks
b. 3 weeks
c. 4 weeks
d. 5 weeks
19. The space between the centerlines of adjacent posts (standards) along the face of a
scaffold is called _______________
a. tie
b. bay
c. bay length
d. working level
20. What is the required minimum height of all scaffolds or for all special scaffolds that
requires scaffold plan?
Page 3 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
a. 6 meters (20 feet)
b. 12.2 meters (40 feet)
c. 38 meters (125 feet)
d. 3 meters (10 feet)
21. For a scaffold equal to or less than 6 meters (20 feet) tall that is not Special Scaffold, who
is required to sign the scaffold tag?
a. scaffold Inspector
b. scaffold Supervisor
c. either a or b
d. none is given
22. Who will sign scaffold tag for scaffold taller than 6 meters (20 feet) and all special
scaffolds?
a. 9 mm (3/8 inches)
b. 50 mm (2 inches)
c. 25 mm (1 inch)
d. 80 mm (3 inches)
24. What is the minimum vertical toe clearance above the top edge of the rung?
a. 100 mm
b. 50 mm
c. 55 mm
d. 65 mm
25. If the extension ladder is 1m to 11 m (36 feet), what is the required overlap?
26. The maximum (transverse) post spacing or base width for all types of scaffold must be
over
27. A light-duty scaffold with 2 working levels, how many platform levels required?
a. 1
b. 2
c. 6
d. None is given
28. A sill or sole plate must accommodate at least how many posts (standard)?
a. 2
b. 1
c. 3
d. 4
29. A medium-duty scaffold must have its transverse and longitudinal posts spacing of
30. Each wire rope or cable suspending an under hung scaffold shall be capable of
supporting _______________
32. If swivel couplers are used to join two overlapping braces, they must overlap by
a. At least 12 inches
b. At least 1 meter
c. At least 6 inches
d. None is given
35. Vertical ladders must have a minimum, lasting or rigid attachment to the structure
36. Lanyards, lifelines, fall arrest system components and anchorage points must have a
minimum capacity of
a. 6,000 pounds
b. 5,000 pounds
c. 3,500 pounds
d. 2,500 pounds
37. Two or more lanyards maybe connected together to meet the desired length, however,
their connection must be
a. Eye to eye
b. Hook to eye
c. Hook to hook
d. Either b or c
38. A light-duty scaffold, with embossed tubes spaced transversely at 1.2 meters must have
its corresponding longitudinal spacing of standard (posts) at
39. A light-duty scaffold with 3 working levels can have additional planked levels of
Page 6 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
a. 9 inches wide, 1-1/2 inches thick
b. 6 inches wide, 1-1/2 inches thick
c. 4 inches wide, 1 inch thick
d. 2 inches wide, 1 inch thick
a. 1
b. 2
c. 3
d. 4
44. How much gap there must be, between a face of a structure or building and the
platform, the necessitating guardrails?
46. A medium-duty scaffold with two working levels can have a maximum height of:
a. 78 feet or 24 meters
b. 91 feet or 28 meters
c. 125 feet or 38 meters
d. None is given
47. Safe landings shall be provided at the top of all ladders and at least _______________ of
ladder height.
Page 7 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
48. For insulated power lines, what is the minimum safe clearance between power lines and
scaffold for 300 volts to 50 kV?
49. For insulated power lines, what is the minimum safe clearance between power lines and
scaffold for less than 60 kV?
50. What is the minimum distance the gin wheel shall be mounted on a cantilever tube
projecting outward from the scaffold?
a. 550 mm
b. 850 mm
c. 450 mm
d. 750 mm
52. What bracing is important to prevent excessive sway and necessary in both transverse
and longitudinal directions of all system and tube and coupler scaffolds?
54. System scaffold components shall not be used to construct what type of scaffolds?
55. Bearer (transoms), including board bearers (intermediate transoms) shall extend at least
_______________ beyond the runner centerline.
a. 550 mm
b. 100 mm
c. 450 mm
d. 200 mm
56. What scaffold tool is required to tighten scaffold couplers to the torque between 40 kg-m
to 80 kg-m?
a. spanner
b. cheater bars
c. long handled wrenches
d. none of the above
57. What is the maximum scaffold height required for light-duty tube and coupler scaffold
with maximum 3 working levels?
58. What is the maximum scaffold height required for medium-duty tube and coupler
scaffold with maximum 1 working level?
59. Mobile and tower scaffold shall be horizontally and vertically braced in what directions?
a. both directions
b. one direction only
c. no direction required
d. upward direction
Page 9 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
60. What is the maximum post spacing required in both directions for light-duty tube and
coupler, mobile and tower scaffolds that are 1 bay long and 1 bay wide and constructed
with steel tubing that is NOT manufactured and embossed.
61. What is the maximum post spacing required in both directions for light-duty tube and
coupler, mobile and tower scaffolds that 1 bay long and 1 bay wide and constructed with
steel tubing that is manufactured and embossed?
a. base plate
b. screw jacks
c. sill (sole board or sole plate)
d. none is given
63. What is the required diameter of steel casters for mobile scaffold rated for light-duty?
a. 120 mm
b. 100 mm
c. 170 mm
d. 200 mm
64. What is the required diameter of steel casters for mobile scaffold rated for medium-
duty?
a. 120 mm
b. 100 mm
c. 170 mm
d. 200 mm
65. What shall be used to fit all casters to prevent movement while the mobile scaffold is
being used?
a. screw jacks
b. positive wheel lock
c. negative wheel lock
d. none is given
66. Which of the following is not permitted for mobile or tower scaffold?
Page 10 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
69. What is the required load in order fabricated tubular frame scaffold can be used?
a. medium-duty
b. light-duty
c. special-duty
d. heavy-duty
Page 11 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
73. Bracket, bracket straps and other associated structural members shall be free from
_______________.
a. detrimental corrosion
b. damage
c. defects
d. a, b, c
a. diagonally
b. vertically
c. horizontally
d. none is given
75. A guardrail system shall be provided on the inside platform edge when the gap between
the platform and tank is _______________.
77. When should the guardrail support uprights be constructed above the walking surface?
a. the top rail is 0.95 m (38 inches), not more than 1.15 m (45 inches)
b. the top rail is 1.90 m (76 inches), not more than 2.30 m (90 inches)
c. the top rail is 2.85 m (114 inches), not more than 3.45 m (135 inches)
d. none of the above
78. What is the vertical distance from the top edge of toeboard to the level of the
walking/working surface?
a. 100 mm (4 inches)
b. 200 mm (8 inches)
c. 300 mm (12 inches)
d. 400 mm (16 inches)
a. 50 mm (2 inches)
b. 25 mm (1 inch)
Page 12 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
c. 75 mm (3 inches)
d. 100 mm (4 inches)
80. How many kilograms a solid toeboards can be capable of withstanding a load in any
downward or horizontal direction?
82. What is the minimum diameter of wire rope that horizontal and vertical lifelines be
made of?
a. 50 mm (2 inches)
b. 25 mm (1 inch)
c. 75 mm (3 inches)
d. 10 mm (3/8 inch)
83. What degrees that temporary stairways be installed above the horizontal?
84. What is the minimum clearance shall be provided between the handrail and wall or
other object?
a. 50 mm (2 inches)
b. 25 mm (1 inch)
c. 80 mm (3 inches)
d. 10 mm (3/8 inch)
85. What is the required slope that straight ladders and extension ladders shall be placed?
a. 3:1
b. 4:1
c. 2:3
d. 1:5
Page 13 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
86. What is the minimum clear perpendicular distance of ladders from the rungs to the
nearest projecting object on the climbing side?
a. two persons
b. only one person
c. three persons
d. four persons
88. If the length of the rung is 500 mm (20 inches) or less, what is the required thickness?
a. 50 mm (2 inches)
b. 20 mm (0.78 inch)
c. 80 mm (3 inches)
d. 10 mm (3/8 inch)
89. Why scaffold components made of dissimilar metals shall not be used together?
90. Guardrail systems shall be able to withstand, without failure, a force of at least
_______________.
91. How long a guardrail system at hoisting areas shall be erected on each side of the access
point through which material is hoisted?
92. At what height that a person could fall shall be protected from falling by a fall protection
system?
a. 100 mm (4 inches)
b. 200 mm (8 inches)
c. 300 mm (12 inches)
d. 400 mm (16 inches)
97. For scaffolds over 38 meters (125 feet), what type of scaffold is preferred to erect?
98. What is the minimum number of clips to be installed at the load end and at the
attachment end of each wire rope?
a. 4
b. 5
c. 3
d. 6
Page 15 of 17
QUESTIONAIRE FOR SCAFFOLDERS:
a. 10 rope diameters
b. 7 rope diameters
c. 8 rope diameters
d. 6 rope diameters
ANSWERS
a b c d a b c d a b c d a b c d a b c d
1 21 41 61 81
2 22 42 62 82
3 23 43 63 83
4 24 44 64 84
5 25 45 65 85
6 26 46 66 86
7 27 47 67 87
8 28 48 68 88
9 29 49 69 89
10 30 50 70 90
11 31 51 71 91
12 32 52 72 92
13 33 53 73 93
14 34 54 74 94
15 35 55 75 95
16 36 56 76 96
17 37 57 77 97
18 38 58 78 98
19 39 59 79 99
20 40 60 80 100