Yanbu National Petrochemical Company Site Safety Procedures Manual

Yanbu Petrochemical Complex U & O Project July, 2005


Fluor Arabia Limited Contract A2IT Page 1 of 3

19. HAZARDOUS WASTE MANAGEMENT PLAN

This plan establishes guidelines for the proper storage, handling, and disposal of
flammable/combustible liquids and potentially hazardous wastes generated by the Project
during the course of construction.

References:-

A. GENERAL

Contractor shall maintain a bookcase, centrally located, of all hazardous waste and waste areas
on the project and document all disposals.

Contractor is responsible for maintaining a copy of Material Safety Data Sheet(s) of all
hazardous waste on site for Contractor’s own reference and employee training. A complete set
of MSDS copies shall also be kept at Contractor’s medical facilities and the medical staff must
be fully familiar with the contents thereof.

The legal storage, use and disposal of wastes of any hazardous chemicals or substances are the
responsibility of Contractor, in accordance with OSHA Construction Standards Subpart F
1926.150, 151, 152. OSHA Construction Standards Subpart G 1916.200. and the Royal
Commission Environmental Regulations, 1999 and subject to review and approval by Owner.

B. RESPONSIBILITIES

1. Contractor’s designated supervisor will construct the flammable, combustible liquid and
hazardous waste collection storage area according to applicable standards set forth.

2. Project Site Supervision (Owner, Contractor, Subcontractors) have the responsibility to


ensure that all flammable and combustible liquids on the Project are appropriately
stored and all project generated hazardous waste is taken to the hazardous waste
collection drum for pickup and disposal.

3. The Project Safety Department will supervise the program and coordinate the pickup
and disposal of hazardous waste.

C. DEFINITIONS

1. Hazardous Waste

Wastes (includes liquids, semi-solids or combination gaseous material) or a


combination of solid wastes which, because of the quantity, concentration, or physical,
chemical, or infectious characteristics, may pose a substantial health hazard to man
and/or his environment when improperly treated, stored, transported, disposed of, or
otherwise managed.

2. Flammable Liquid
H:\000_General\Share\501 - Construction\SITE SAFETY PROCEDURES\19-Hazardous-Waste-Management.doc GENERAL SITE CONDITIONS AND SAFETY
PROCEDURES
Yanbu National Petrochemical Company Site Safety Procedures Manual
Yanbu Petrochemical Complex U & O Project July, 2005
Fluor Arabia Limited Contract A2IT Page 2 of 3

Any liquid having a flash point below 60 C (140F).

3. Combustible Liquid

Any liquid having a flash point at or above 60 C (140F) and below 93 C (200F).

4. Flash Point

The minimum temperature, at which a substance gives off a flammable vapor which, in
contact with a spark or flame, will ignite.

5. Spill or Leak

Any release of hazardous material or hazardous waste into the environment.

D. EQUIPMENT

A fire extinguisher rated not less 20AB will be mounted no closer than 8 meters (25 ft). and no
further than 24 meters (75 ft.) from the Flammable, Combustible Liquid and Hazardous Waste
Collection Storage Area.

E. SIGNS

Signs will be mounted one on each side. Each sign will be visible at all times. Every sign will
read, "DANGER, FLAMMABLE STORAGE AREA, NO SMOKING WITHIN 16
METERS (50 FT.)"

F. HAZARDOUS WASTE COLLECTION

1. A 55-gallon drum container will be provided by the existing facility for collection and
storage onsite of hazardous wastes. The container must be labeled "HAZARDOUS
WASTE." A schedule for pickup and disposal at 90-day or sooner intervals has been
coordinated with the following Project personnel.

Contact Personnel -

2. A receptacle must be provided for the collection of used containers of hazardous wastes
(i.e., paint cans, aerosol cans, oil cans, etc.). The receptacle will be located in the
Flammable, Combustible Liquids and Hazardous Waste Accumulation Storage Area.
All containers must be completely empty before placing in dumpster.

G. FLAMMABLE, COMBUSTIBLE LIQUID & HAZARDOUS WASTE

H:\000_General\Share\501 - Construction\SITE SAFETY PROCEDURES\19-Hazardous-Waste-Management.doc GENERAL SITE CONDITIONS AND SAFETY


PROCEDURES
Yanbu National Petrochemical Company Site Safety Procedures Manual
Yanbu Petrochemical Complex U & O Project July, 2005
Fluor Arabia Limited Contract A2IT Page 3 of 3

COLLECTION AND STORAGE AREA LAYOUT SPECIFICATIONS

1. Spill Confinement - A 300-mm (12-inch) minimum earth dike (berm) shall surround the
perimeter of the storage area for spill confinement.

2. Ground Cover - A non-permeable ground covering shall be placed on the storage area
floor to prevent spills from contaminating ground soil.

3. Drain Pipe - A drain pipe shall be positioned to facilitate and control drainage of water
and/or contaminants from the flammable storage area. The drain pipe must be a type
that can be capped for control of drainage.

pH and total organic carbon need to be analyzed before disposal.

4. Perimeter Barrier - The perimeter will be identified by orange safety netting or similar
or better material with stakes at proper intervals to support the barrier.

5. Access - The entrance should be of sufficient width so that project forklifts might enter
and pick up heavy loads. Heavy drums or containers will be put on pallets to allow safe
handling by project forklifts.

ATTACHMENT A: HAZARDOUS WASTE COMMON TO CONSTRUCTION

H:\000_General\Share\501 - Construction\SITE SAFETY PROCEDURES\19-Hazardous-Waste-Management.doc GENERAL SITE CONDITIONS AND SAFETY


PROCEDURES

You might also like