HAZARD IDENTIFICATION & RISK ASSESMENT (HIRA)

OHS-PR-02-03-F05 CRITICAL TASK ANALYSIS

JOB/TASK TYPE: ALARMS CABLE TERMINATION AT MDF AND EQUIPMENT


DEPARTMENT / DIVISION: COMMUNICATIONS DATE: JULY 16, 2023
REPLACEMENT OF BREAKER ON DCPDB AND TERMINATION OF DC CABLES TO DCPDB

COMPILED BY: Engr Jawad Khan EMPLOYEE CLASSIFICATION/PROFESSION: Technical


APPROVED BY SUPERVISOR: JOHN MENDOZA DATE: July 16, 2023 APPROVED BY MANAGER: Engr Hassan Zumiyyan DATE: JULY 17, 2023

PROBA
HAZARD POTENTIAL PAST EXPERIENCE BILITY/ CLASSIF
SEVER IS IT AN IS IT A ICATION OF
ITY INHE NEW OR CRITICAL TASKS
HAS ANY PART OF THE TASK RENT UN
LIST ALL TASKS DOES ANY PART OF THE TASK HAVE
CAUSED LY USUAL
IN SECTION
HAZARDO TASK?
LOSS/ DISRUPTION / US TASK?
INJURY DAMAGE POLLUTION LOSS DISRUPTION/ NEAR P S
INJURY TOTAL RANK
POTENTIAL POTENTIAL POTENTIAL DAMAGE POLLUTION MISS
1-5 1-5 1-5
ALARMS CABLE
TERMINATION AT MDF & 2 2 1 0 0 0 0 1 3 3 1 12 1
EQUIPMENT
Replacement of Breaker on
DCPDB and termination of DC 2 2 1 0 0 0 0 1 3 3 1 12 2
Cables to DCPDB & TESTING

Rating Table: HIGH-5, MED-HIGH-4, MED-3, MED-LOW-2, LOW-1

Page 1 of 1 Rev. 01 [Dec- 2022] OHSMS Approved Document