TEST SCRIPT CUSTOMER

SAP S/4HANA

Material Staging for Production Orders

Table of Contents

Test Script Information

Master Data, Organizational Data, and Other Data

Test Procedures

Material Staging for Production Orders


1 Test Script Information

Test Script ID PP.04.01.04 Version D 1.0


Test Script Name Material Staging for Production Orders
Description The user stage material they need for production at a certain time, in a particular quantity, and in a particular production
storage bin, via the WM-PP interface.
Test Objective This test aims to:
 Material staging via TCode MF60
Document Reference(s) Process ID Process Name
PP.04.01 Production Order Processing

Role of Tester
2 Master Data, Organizational Data, and Other Data

The organizational structure and master data of your company have been created in your system during implementation. The organizational structure reflects the structure of
your company. The master data represents materials, customers, and vendors, for example, depending on the operational focus of your company.
Use your own master data to go through the test procedure. If you have installed an SAP Best Practices Baseline Package, you can use the following Baseline Package scenario
data:

Master data Value Master. data details Comments


Plant 550A Yokohama Reclamation Sdn. Bhd. (YRSB)
3 Test Procedures
This section describes test procedures for each process step that belongs to this scope item.

3.1 Material Staging for Production Orders


Prerequisite (if any)

Procedure
Test Instruction Expected Result Actual Result Pass | Fail
Step
#
1 Log in to the SAP system using username and password The SAP Easy Access screen will appear. Pass
 Fail
2 In the initial screen of t-code MF60, go to the Planned/Production/  Pass
Process Orders tab and input the following:
 Fail
● Plant
● Production Order
Test Instruction Expected Result Actual Result Pass | Fail
Step
#
3 Click on the Global Settings and select the preferred settings such as:  Pass
● Include all requirements
● Round up replenishment proposals
 Fail
● Stock transfer reservation

4 Click on the Execute icon. In the Pull List screen, select the line items  Pass
and click on the Replenishment Proposals button at the bottom. This
 Fail
will populate the Quantity Staged column.
Test Instruction Expected Result Actual Result Pass | Fail
Step
#

5 Click on the Replenishment Elements button at the top. This will dis-  Pass
play another table section at the bottom.
 Fail

6 In the Replenishment Elements section, select the line items and click  Pass
on the Stage button, then save.
 Fail

7 This will generate a material reservation.  Pass


 Fail