Maintenance Requirements List-CAPXS EOL Test FUT
Maintenance Requirements List-CAPXS EOL Test FUT
00-TE80-00006
A
Documentation Category
Preventative Maintenance Requirements Form
Selective
Approvals Designation
Ken Wilson Director Test & Reliability
Revision History
Revision Change Details Originator Date of Release
1.0 Purpose
To have a standardized form for suggesting preventative maintenance requirements for test equipment.
2.0 Scope
This form is to be used by Jabil Test Development Site if the associated process is called for in the test development proposal statement
of work, unless the use of another form is requested.
3.0 References
This document is to be used in conjunction with the following procedures:
Document Number Document Title
00-TE30-00003 Functional Test Development Process
00-TE30-00004 In-Circuit Test Development Process
00-TE60-00001 Test Development Document Formats And Storage Guidelines
4.0 Instructions
1 Utilize this form to provide guidance when developing suggested preventative maintenance requirements for test systems.
2 Run Macros as needed
3 Store all copies per 00-TE60-00001, Test Development Document Formats and Storage Guidlines.
ths
ry
ly
kly
go
i ly
nth PM Requirement
on
e
Da
te
We
Mo
6m
Ca
No No No Yes Clean probes and interface contacts. Use only approved cleaning product cleaning
Clean fixture receiver - Using canned air or compressed air, blow debris off receiver block. Remove any
No No No Yes cleaning
remaining debris with brush.
Note: The PM requirements in this list are only suggestions. The user of this application must decide which ones apply for a given test solution.
2 Calibration - Verify all test equipment is in calibration per the Calibration certificate
3 Check Safety curtain is working properly.
Wiring - Inspect and verify all electrical and signal wiring. If damage or excessive wear is observed, repair
4 immediately.
5 Mechanical inspection
Monthly