Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

The Formwork Experts.

The Formwork Experts.


The Quality Guide
The Quality Guide
www.doka-me.com

www.doka-me.com
www.doka-me.com
Table of Contents

1. AT A GLANCE

1.1 General Cleaning Condition ........................................................................................ 1


1.2 General Technical Condition ....................................................................................... 17
1.3 Technical Condition Timber Formwork Beam .............................................................. 27
1.4 Technical Condition Floor Props ................................................................................. 31
1.5 Technical Condition Framed Panels ........................................................................... 41
1.6 Technical Condition Load Bearing Towers ................................................................... 47

2. RECONDITIONING DOKA SYSTEM COMPONENTS

2.1 Reconditioning Service Beams ................................................................................... 57


2.2 Reconditioning Service Floor Props ............................................................................ 77
2.3 Reconditioning Service Eurex 60 550 Plus Accessories .............................................. 83
2.4 Reconditioning Service Multitrip Packaging ................................................................. 91

3. RECONDITIONING DOKA WALL SYSTEMS

3.1 Reconditioning Service Framax and Alu Framax Framed Panels .................................... 117
3.2 Reconditioning Service Accessory Parts Framax and Alu Framax .................................. 139
3.3 Reconditioning Service Frami Panels .......................................................................... 151
3.4 Reconditioning Service Frami and Accessories ............................................................ 159
3.5 Reconditioning Service Top 50 Parts and Supporting Construction Frame ..................... 169

4. RECONDITIONING DOKA FLOOR SYSTEMS

4.1 Reconditioning Service Dokaflex ................................................................................. 203


4.2 Reconditioning Service Dokadek 30 ........................................................................... 215
4.3 Reconditioning Service Tables and Accessories ........................................................... 247

Doka Quality Guide I Contents I 1


Table of Contents

5. RECONDITIONING DOKA CLIMBING SYSTEMS

5.1 Reconditioning Service Climbing Formwork SKE 50 / 100 plus ................................... 281
5.2 Reconditioning Service Climbing Formwork SKE 50 .................................................. 313
5.3 Reconditioning Service Climbing Formwork SKE 100 ................................................. 343
5.4 Scaffolding Materials Doka Self Climbing System ...................................................... 365
5.5 Doka-climbing Formwork MF 240, 150F/200F ......................................................... 000

6. RECONDITIONING DOKA LOAD BEARING SYSTEM

6.1 Reconditioning Service Staxo, Staxo 100/D2 ............................................................. 389


6.2 Reconditioning Service Load Bearing Tower Staxo 40 ................................................ 409

7. OTHER WORKING INSTRUCTION

7.1 Cargo Securing ........................................................................................................ 435

Doka Quality Guide I Contents I 2


At a glance
1.1 General Cleaning Condition

Free from concrete:


Threads and gear racks

e.g. Foot spindle at supporting construction


frame

e.g. Thread at attachable frame

Forbidden soiling at turnbuckle.

At a glance I 4
1.1 General Cleaning Condition
Free from concrete residues, concrete milkallowed:
Connecting surfaces, carrying surfaces, boreholes, guidances, connecting sleeves, stacking
surfaces, pawl-plugs, plywood, concrete touching areas, contact surfaces of the stacking flange,
transverse sleeves, anchoring sleeves.

e.g. Plywood at Framax element.

e.g. Connecting surface at Framax framed


panel.

Too strong soiling at Xlife plywood.

At a glance I 5
1.1 General Cleaning Condition

Filmy concrete residues up to 1mm allowed:


Plywood edge at FF20 and circular formwork elements, tables, column elements KS etc.

e.g. Free area at framed panel

e.g. Plywood edge at table

Too strong soiling at framed element.

At a glance I 6
1.1 General Cleaning Condition
Concrete sprays and spots of concrete crusts allowed:
At other surfaces.

e.g. Transverse tube at supporting scaffolds

e.g. Stand tube at floor props

Too strong soiling at the rear side of the


element frame.

At a glance I 7
1.1 General Cleaning Condition

Concrete crusts allowed:


At corners that are difficult to reach.

e.g. Stacking flange FF20

e.g. Removable folding tripod

Too strong concrete crusts at supporting


timber beam.

At a glance I 8
1.1 General Cleaning Condition
Free of cement residues, cement milk allowed:
Areas touched on concrete as well as connecting areas of the formwork-elements are concerned.

Free of cement residues, cement milk allowed


at Framax elements

Free of cement residues, cement milk allowed


at DF table

At a glance I 9
1.1 General Cleaning Condition

Free of cement residues, cement milk allowed


at inside corner FF20

Free of cement residues, cement milk allowed


at timber formwork beam

Free of cement residues, cement milk allowed


at Dokadur panels

At a glance I 10
1.1 General Cleaning Condition
Filmy, thin cement recidues up to a max. of 1 mm allowed:
All areas, which do not touch the concrete, if its function requires no higher neatness.

Filmy, thin cement reidues up to a max. of 1


mm allowed in the free area at Framax
elements

At a glance I 11
1.1 General Cleaning Condition

Cement sprays and spots of cement crusts allowed:


Areas without connecting functions that do not touch the concrete.

Cement sprays and spots of cement crusts


allowed at Staxo frames

Cement sprays and spots of cement crusts


allowed at diagonal crosses

Cement sprays and spots of cement crusts


allowed at Framax brackets

At a glance I 12
1.1 General Cleaning Condition
Cement sprays and spots of cement crusts
allowed at the back of frame elements

Cement sprays and spots of cement crusts


allowed at multi trip packaging

At a glance I 13
1.1 General Cleaning Condition
Cement sprays and spots of cement crusts
allowed at circular formwork H20

Cement sprays and spots of cement crusts


allowed at steel walings

Cement sprays and spots of cement crusts


allowed at floor props

At a glance I 14
1.1 General Cleaning Condition

Cement crusts allowed:


Corners difficult to get to.

Cement crusts allowed at removable folding


tripod

Cement crusts allowed at circular forming plate

Cement crusts allowed at FF20 element

At a glance I 15