Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 18

@

Instructions
How to get started using this template upon watching the METAL WORKS video

Watch the task assigned to your group in the Video Links sheet
Locate the Youtube link of the video assigned to your
breakout room
How to use this template for your output
Assign ONE secretary who will Screen Share and edit this
1.
template
2. Focus on the TASK assigned to your group. (see below)
3. in the video
4. for your group (see name: Cutting, Polishing/Grinding,
30 minutes to finish your output

How to report, upon finishing your output


The Resource Person will Screen Share during the
1. reporting
The reporter will be asked to present by the Resource
2.
Person
3. members can give additional input anytime
The resoure person will give feedback to your workshop
4.
output
5-8 minutes to report

Breakout Room Assigned Tasks


Breakout Room 1 - Cutting
Breakout Room 2 - Grinding
Breakout Room 3 - Welding
Breakout Room 4 - Painting

*The OSHC staff with you will only facilitate the assigning of roles.
Risk Matrix (3x3)
from the Canadian Centre for Occupational Safety and Health
`
Hierarchy of Controls
Metal Works Screenshots
You may review your tasks again.

Cutting

Link: https://youtu.be/OmtJLJT8Z_w
Grinding /
Polishing

Link: https://youtu.be/jbmatnBJZfg

Welding

Link: https://youtu.be/V6K2iHLLrAc

Painting

Link: https://youtu.be/8dig4O84bpM
Full Video: https://youtu.be/tyxumR-zwLE
Data Validation

Task Probability Severity Risk Classification


Cutting Low Low Very Low Risk
Grinding Medium Medium Low Risk
Welding High High Medium Risk
Painting High Risk
Immediately Dangerous
Breakout Room 1: Cutting
1. Hazard Identification 2. Risk Analysis/Evaluation 3. Risk Control
Work Activity Hazard Which can cause Existing Risk Control Probability Severity Risk Proposed Control Measure Due Date/ Status
1 Safety and 1 Health (effect on the worker/s) (if any) (actual date)
If injury: specifiy what kind;
Indicate SPECIFIC safety or health Type "NONE" if you did not see any Low, Be specific in specifying due
Focus on the task Low, Medium, Refer to Risk
hazard (DO NOT JUST TYPE "HEALTH existing control measures Medium, Indicate specific Engineering Control, Admin. Control and/or PPE dates for each proposed
assigned to your group If illness, just type "ILLNESS" & do not High Matrix
HAZARD" OR "SAFETY HAZARD" HERE.) implemented. High control measure
diagnose.
EC: Date:
Cutting (SAFETY Cut to hands Gloves AC: Emergency Preparedness Date: Within a week from
1 Rotating Blade Low Low Very Low Risk
HAZARD) Machine Guard, Trained Worker PPE: date of report (July 5, 2023)
Date:
Illness EC: Date:
Cutting (HEALTH Inhalation of particle from metal
2 None Medium Medium High Risk AC: Date:
HAZARD) PPE: Face Mask and Safety Goggles Date: Within a week from
date of report (July 5, 2023)
Members: Ronaldo Bermudez, Joan Mae Ayoma, Marc Jhon Banaynal, Ronilio Almazora, John Michael Balasbas, Geramae Arane, Queenie Ray Angeles, Frauline Bentayon, Junavy Agpawa, Cristell Balajo, Don Michael Astor
Group Name: CUTTING GROUP
Breakout Room 2: Grinding
1. Hazard Identification 2. Risk Analysis/Evaluation
Work Activity Hazard Which can cause Existing Risk Control Probability Severity
1 Safety & 1 Health (effect on the worker/s) (if any)
Indicate SPECIFIC safety or health If injury: specify what kind; Type "NONE" if you did
Focus on the task Low, Low,
hazard (DO NOT JUST TYPE not see any existing
assigned to your Medium, Medium,
"HEALTH HAZARD" OR "SAFETY If illness, just type "ILLNESS" & control measures
group High High
HAZARD" HERE.) do not diagnose. implemented.
Injury: Abrasion

Grinding (SAFETY
1 High Low
HAZARD)

Electric Grinder Disc Gloves


Illness

Grinding (HEALTH
2 Inhalation of Grinding Dust None High High
HAZARD)

Members: Grueso, Galamay, Galero, Firmanes, Divinagracia, dela Cruz, de Dios, Cuilan, Cayatoc, Fajarit
Group Name: Group 2
uation 3. Risk Control
Risk Proposed Control Measure Due Date/ Status
(actual date)
Be specific in
Refer to Risk Indicate specific Engineering Control, Admin. specifying due dates
Matrix Control and/or PPE for each proposed
control measure
EC: Appropriate Machine Guarding Date: July 03, 2023
AC: Institutionalize OSH Policies (Regular Equipment Date: July 03, 2023
Medium Risk Preventive Maintenance, Work Instructions on the Date: July 03, 2023
designated areas)
PPE: Appropriate Gloves, Work Clothing with Long Sleeves
EC: Installation of Ventilation Measures Date: June 28, 2023
AC: Institutionalize OSH Policies (Regular Equipment Date: June 28, 2023
Immediately Preventive Maintenance, Work Instructions on the Date: June 28, 2023
Dangerous designated areas)
PPE: Appropriate Mask (Note: Temporary Suspend the
Activity effective on June 28, 2023)
Breakout Room 3: Welding
1. Hazard Identification 2. Risk Analysis/Evaluatio
Work Activity Hazard Which can cause Existing Risk Control Probablity
(effect on the
1 Safety & 1 Health (if any)
worker/s)
If injury: specifiy what
Indicate SPECIFIC safety or kind;
Focus on the task Type "NONE" if you did not see Low,
health hazard (DO NOT JUST
assigned to your any existing control measures Medium,
TYPE "HEALTH HAZARD" OR If illness, just type
group implemented. High
"SAFETY HAZARD" HERE.) "ILLNESS" & do not
diagnose.

Welding (SAFETY Exposure to molten metal Welding burns to the


1 Welding Cloth, Gloves Low
HAZARD) droplets/ high temperature body

Exposure to metal
Welding (HEALTH Inhalation of fumes and/or
2 fumes which can lead NONE High
HAZARD) gases
to respiratory illnesses

Members: Lagonera, Kim David; Halog, Adrian Paul; Inocencio, Salvador; Llacer, Venus; Jate, Ricardo Jr.; Grueso, Jared; Jorge, Cristopher
Group Name: THE WELDERS
sis/Evaluation 3. Risk Control
Severity Risk Proposed Control Measure

Low,
Refer to Risk
Medium, Indicate specific Engineering Control, Admin. Control and/or PPE
Matrix
High

EC:
AC: Review and improve policies on the minimum required PPE for
welding
PPE: Wear Welder Jacket, fire-resistant clothing
Medium Low Risk

EC: Improve the ventilation system, Use fume extraction devices


AC:
Medium High Risk PPE: Use of mask respirator

d; Jorge, Cristopher; Masa-ad, Kyo Fe; Lambojon, Cyril Marie; Licayan, Danielle Marie
sk Control
Due Date/ Status
(actual date)

Be specific in specifying due dates for each proposed control


measure

Date:
Date: 2 days after date of report
Date: 2 days after date of report

Date: 1 month after date of report or as soon as it is procured


Date:
Date: 1 day after date of report
Breakout Room 4: Painting
1. Hazard Identification
Work Activity Hazard Which can cause
1 Safety & 1 Health (effect on the worker/s)
If injury: specifiy what kind;
Indicate SPECIFIC safety or health
Focus on the task
hazard (DO NOT JUST TYPE "HEALTH
assigned to your group If illness, just type "ILLNESS" & do not
HAZARD" OR "SAFETY HAZARD" HERE.)
diagnose.

Painting (SAFETY
1 Slips Head Injury, Back Injury
HAZARD)

Painting (HEALTH
2 INHALATION OF PAINT FUMES ILLNESS
HAZARD)

Members: Navarro, Ong, Osorio, Pacris, Pagaling, Quilang, Rivera, Sabado, Salvador, Zaño
Group Name: Group 4- Painting
2. Risk Analysis/Evaluation
Existing Risk Control Probability Severity Risk
(if any)

Type "NONE" if you did not Low,


Low, Medium, Refer to Risk
see any existing control Medium,
High Matrix
measures implemented. High

NONE Low Low Low Risk

Immediately
NONE High High
Dangerous
3. Risk Control
Proposed Control Measure Due Date/ Status
(actual date)
Be specific in specifying
Indicate specific Engineering Control, Admin. Control and/or due dates for each
PPE proposed control
measure
EC: Apply 7s Date: June 28, 2023
AC: Institutionalize Safety Policies (OSH) Date: June 28, 2023
PPE: None Date:
EC: Installation of proper ventilation system Date: July 5, 2023
AC: Institutionalize Safety Policies (OSH) Date: June 28, 2023
PPE: Use of proper respiratory mask and suit Date: June 29, 2023

You might also like