The construction of a new Rythu Bharosa Kendram building in Mallakalva GP of Dharmavaram Rural Mandal has been completed. The two-story building cost 21.80 lakhs to construct and was funded through MGNREGS grants. Key features of the completed building include a meeting hall, godown, and secretary's room on the ground floor and additional meeting and lab spaces on the first floor totaling 1180 square feet. The building construction included an RCC roof, teak wood doors and frames, UPVC windows, tile flooring, and emulsion painting.
Original Description:
format for handing over rbk
Original Title
Handing Over Certificate of RBK Chigicherla GP of DMM Rural Mandal (2)
The construction of a new Rythu Bharosa Kendram building in Mallakalva GP of Dharmavaram Rural Mandal has been completed. The two-story building cost 21.80 lakhs to construct and was funded through MGNREGS grants. Key features of the completed building include a meeting hall, godown, and secretary's room on the ground floor and additional meeting and lab spaces on the first floor totaling 1180 square feet. The building construction included an RCC roof, teak wood doors and frames, UPVC windows, tile flooring, and emulsion painting.
The construction of a new Rythu Bharosa Kendram building in Mallakalva GP of Dharmavaram Rural Mandal has been completed. The two-story building cost 21.80 lakhs to construct and was funded through MGNREGS grants. Key features of the completed building include a meeting hall, godown, and secretary's room on the ground floor and additional meeting and lab spaces on the first floor totaling 1180 square feet. The building construction included an RCC roof, teak wood doors and frames, UPVC windows, tile flooring, and emulsion painting.
2. Grant : MGNREGS 3. Ground floor : Meeting Hall , Godown Panchayati secretary Room 4. First floor : Meeting Hall , passage, Lab room , machinery room. 5. First Floor Plinth area of Building : 1180 Sq.ft 6. Total Plinth area of Building : Sq.ft
7. Summary :- The Building is Completed in all respects
with the following components like RCC roof slab, Teak wood Door frames ,Teak wood Frame with WPC Doors & Three track UPVC sliding Windows with MS grills ,approved make Flooring with Double Charged Vetrified tiles , approved make Emulsion Painting to Walls. necessary plumbing work also executed .