RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
2 Setting Survey Slips, Trips, Falls Surveyors, 3 2 6 M Pedestrian access to be provided AEGC 1 1 1 L OSHAD-SF– Codes
Points Helpers Access ways to be kept clear at all of Practice CoP
Construction 44.0 Traffic
times.
manager, Management and
Signage to be displayed near the
access ways OSH In Logistics – Version
Mandatory PPE ( Safety Shoes, charge, 3.0
Helmet, HV vest) to be worn at all Supervisor OSHAD-SF –
times. Codes of Practice
2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Supervisor,
Ensure that all survey points are OSHAD-SF- Codes
operators,
protected (Physical Protection- of Practice CoP
Damaging Survey workers,
Survey points 2 3 6 M Barrication) in order to minimize the 1 1 1 L 22.0 – Barricading
Points
likelihood of damage or displacement & of Hazards –
of Control Points. Version 3.0
Individuals
Exposure to Dust Surveyors, 2 3 6 M Ensure Dust mitigation measures are AEGC 1 2 2 L OSHAD-SF –
Helpers taken like wetting exposed soil, Codes of Practice
stockpiles shall be covered and CoP 08.0 – General
3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
3 Material Delivery Overturning pick Public, 3 3 9 H Ensure safe access and egress is Logic 1 3 3 L OSHAD-SF– Codes
on site – up / vehicle Workers, Fusion of Practice COP
provided at all times.
Land
(unloading carrying materials. Supervisors& Ensure housekeeping is done and 44.0 Traffic
Drying
Dewatering Inspectors unwanted materials are not kept in works LLC Management and
pump and Unsafe Access & Logistics – V-3.0
egress, the work zone. Aisle and walkways to
fittings.) be kept clear. OSHAD-SF –
Overloading Ensure that workers carrying out the Codes of Practice
works are training in manual handling. COP 17.0 – Safety
Collision
Ensure that all workers unloading Signage and
Slips Trips and fall materials comply with appropriate Signals – Version
PPE requirements. 3.0
Falling of materials
Ensure that certified and inspected
OSHAD-SF - Codes
Adverse weather mobile crane is used to unload the
of Practice COP
conditions. dewatering pump on site.
22.0 – Barricading
Ensure that the operator and the of Hazards –
Human error
signalman (banksman), lifting gears Version 3.0
Unauthorized are certified by an ADM approved 3rd
access. party. OSHAD-SF –
Ensure that mobile crane is inspected Codes of Practice
Property damage. COP 36.0 – Plant
and checklist is prepared by
and Equipment –
4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF –
Codes of Practice
COP 14.0 – Manual
Handling and
Ergonomics –
Version 3.0
OSHAD-SF –
Element 6 -
Emergency
Management
OSHAD-SF –
Element 2 - Risk
Only trained workers carry out the Management
lifting activities.
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Codes of Practice
CoP 21.0 – Permit
to Work Systems -
Version 3.0
Musanada Key
HSE requirements
6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
4 Pre-Auguring Toppling over Workers, 3 4 12 H Ensure that drilling machine is in Logic 1 3 3 L OSHAD-SF –
using drill when travelling on Inspectors, Fusion Codes of Practice
good working condition and 3rd party
Land
machine slopped ground. Engineers. test & through examination. COP 17.0 – Safety
Drying
Ensure that the operator is competent works LLC Signage and
Risk of collision. Signals – Version
and 3rd party certified and has valid
Injury due to license to operate the drilling 3.0
rotating machine, OSHAD-SF - Codes
equipment. Ensure that the operator carried out of Practice COP
daily equipment inspections. 22.0 – Barricading
Contact with
underground Ensure that separate pedestrian of Hazards –
utilities. access is available. Version 3.0
PPE (Hi-Vis clothing, Hard Hat,
Unauthorized OSHAD-SF –
Gloves, Goggles, Safety Footwear)
access. Codes of Practice
rule must be enforced.
COP 36.0 – Plant
Full time supervision is necessary by and Equipment –
competent person. Version 3.0
Ensure that the operator is fully
competent and have valid license to OSHAD-SF –
operate the drilling machine. Codes of Practice
Ensure the ground level is as per the COP 2.0 – Personal
design and drawing. Protective
Equipment - Version
Ensure that the ground level is even.
3.0
demarcation to be done in case there
are excavations or uneven surfaces OSHAD-SF –
nearby. Codes of Practice
Ensure that work is carried out only COP 08.0 – General
after conforming that there are no Workplace
7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF– Codes
of Practice CoP
21.0 – Permit to
Work Systems -
Version 3.0
8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF –
Codes of Practice
COP 14.0 – Manual
Handling and
Ergonomics –
Version 3.0
OSHAD-SF –
Element 6 -
Emergency
Management
OSHAD-SF –
Element 2 - Risk
Management
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Codes of Practice
CoP 21.0 – Permit
to Work Systems -
Version 3.0.
Musanada Key
HSE requirements
9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
5 Well Point Workers, 3 3 9 H Aprons shall be available on site at all Logic 1 3 3 L OSHAD-SF– Codes
Installation Inspectors, Fusion of Practice CoP 2.0
times.
Personnel getting Engineers
Land
– Personal
Medical eye wash station shall be Drying
wet. nearby Protective
available on site at all times. works LLC
Water Jetting Eye contamination Ensure that workers, engineers, Equipment - Version
inspectors all comply with PPE 3.0
Requirements. OSHAD-SF –
Ensure that unauthorized personnel Codes of Practice
are not allowed to enter the premises. CoP 08.0 – General
Signage and barrication to be Workplace
provided. Amenities – Version
Ensure the works are monitored by 3.0
competent personnel.
OSHAD-SF –
Ensure that manual handling training
Codes of Practice
is conducted prior to the start of the CoP 14.0 – Manual
works. Handling and
Ergonomics –
Version 3.0
OSHAD-SF –
Codes of Practice
CoP 17.0 – Safety
Signage and
Signals – Version
3.0
OSHAD-SF- Codes
of Practice CoP
10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
22.0 – Barricading
of Hazards –
Version 3.0
OSHAD-SF –
Codes of Practice
CoP 34.0 – Safe
use of lifting
Equipment and
Lifting accesories –
Version 3.0
OSHAD-SF –
Codes of Practice
CoP 36.0 – Plant
and Equipment –
Version 3.0
OSHAD-SF– Codes
of Practice CoP
44.0 Traffic
Management and
Logistics – Version
3.0
OSHAD-SF– Codes
of Practice CoP
47.0 – Machine
Guarding Version
3.0
11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
OSHAD-SF –
Codes of Practice
CoP 53.0 - OHS
Management During
Construction Work –
Version 3.0
OSHAD-SF –
Element 2 - Risk
Management
OSHAD-SF –
Element 3 –
Management of
Contractors
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Element 6 -
Emergency
Management
6 Well Point Noise Pollution Workers, 3 3 9 H All non-sound attenuated equipment Logic 1 3 3 L OSHAD-SF –
Operation & Inspectors, Fusion Codes of Practice
to be fixed with warning signs.
Maintenance Pump Failure Engineer
Land
CoP 3.0 –
All personnel nearby to comply with Drying
Occupational Noise
12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Injury from Moving PPE requirements ( Ear Plugs, Ear works LLC – Version 3.0
Parts. muffs)
Equipment OSHAD-SF– Codes
Ensure that the works are carried out
Operation of Practice CoP
by competent personnel.
47.0 – Machine
Standby pump unit (s) to be Guarding Version
connected to system at all times. 3.0
Equipment
Guards and warning signs to be fitting
Maintenance OSHAD-SF –
to all machines with rotating parts.
PPE (Hi-Vis clothing, Hard Hat, Codes of Practice
Gloves, ear plug/ ear muff, Goggles, CoP 36.0 – Plant
Safety Footwear) rule must be and Equipment –
Version 3.0
enforced.
Ensure that maintenance is carried OSHAD-SF –
out by competent personnel and Codes of Practice
records are maintained. COP 17.0 – Safety
Crew Task Briefing before start the Signage and
work. Signals – Version
3.0
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Element 6 -
Emergency
13
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Management
OSHAD-SF –
Element 2 - Risk
Management
14
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Lifting accesories –
Version 3.0
OSHAD-SF- Codes
of Practice CoP
22.0 – Barricading
of Hazards –
Version 3.0
OSHAD-SF –
Codes of Practive
COP 39.0 –
Overhead and
Underground
Services - Version
3.0
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Element 6 -
Emergency
Management
OSHAD-SF –
Element 2 - Risk
15
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Management
OSHAD-SF- Codes
16
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
of Practice COP
22.0 – Barricading
of Hazards –
Version 3.0
OSHAD SF-
Element- 5 –
Training and
awareness and
competency
OSHAD-SF –
Element 6 -
Emergency
Management
OSHAD-SF –
Element 2 - Risk
Management
Emergency Fire All personnel 3 4 12 H All personnel to be safety inducted. AEGC 1 3 3 OSHAD-SF –
situations Collision Train and inform all employees Codes of Practice
Electrocution regarding fire Emergency Evacuation CoP 17.0 – Safety
Failure to Plan. Signage and
Evacuation Initiate and maintain good Signals – Version
housekeeping 3.0
Ensure that all materials used in porta OSHAD-SF –
Codes of Practice
cabin construction are fire rated.
CoP 43.0 –
Ensure that enough firefighting
Temporary
equipment are made available on
17
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
18
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Sr.
Name Emp. No. Emirates ID No Designation Date Signature
No. Remarks
1
2
3
4
5
6
7
8
19
RISK ASSESSMENT