Document Risk Assessment

Abu Dhabi Future School Program - Phase 8,


Ref: No AEGC-KG-RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

Project Abu Dhabi Future School Program - Phase 8, Package 1, Al  Falah KG

Employer MUSANADA Contract No.

Consultant: Al Suweidi Engineering Consultant LLC Date:

Contractor Al Eslah General Contracting Est Document No.

RISKASSESSMENT TEAM SITE REPRESENTATIVES

NAME DESIGNATION SIGNATURE NAME DESIGNATION SIGNATURE

Eng. Ayham Sabouni Project Manager Ahmed Hajeer Project Engineer

Eng.Zafeer Arif OSH Coordinator

Subject RISK ASSESSMENT for Backfilling & Compaction

NOTE:- This Risk Assessment is prepared in line with the METHOD STATEMENT for Dewatering works Rev. 00; and it covers all activities
described in this Method Statement.

1
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Site OSH induction course for every


Parking at live worker working in this project.
road to drop or  Bus should be park at safe area with
carry workers. double indicators and gate should not OSHAD-SF– Codes
open until bust fully stop. Construction of Practice CoP
Unfamiliar with the
local situation and  Worker should not cross the road manager, 44.0 Traffic
the Safety rules until bus is move from road to clear Management and
OSH In Logistics – Version
1 sight for upcoming traffic.
Unfamiliar to the charge, 3.0
Mobilization of  Proper training and guidance for all
nature of work and Employees 3 2 6 M 1 1 1 L
Employees new workers HR staff,
weather condition OSHAD-SF –
 Minimum PPE must be worn at all Supervisor Codes of Practice
Lack of training times CoP 08.0 – General
&
 Follow site safety rules Workplace
Younger workers  Follow the traffic safety regulations Individuals Amenities – Version
Medically not fit  Medical Check up to be done 3.0
 Special care for young people and
should not be involved in high risky
work

2 Setting Survey Slips, Trips, Falls Surveyors, 3 2 6 M  Pedestrian access to be provided AEGC 1 1 1 L OSHAD-SF– Codes
Points Helpers  Access ways to be kept clear at all of Practice CoP
Construction 44.0 Traffic
times.
manager, Management and
 Signage to be displayed near the
access ways OSH In Logistics – Version
 Mandatory PPE ( Safety Shoes, charge, 3.0
Helmet, HV vest) to be worn at all Supervisor OSHAD-SF –
times. Codes of Practice

2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

& CoP 08.0 – General


Workplace
Individuals
Amenities – Version
3.0

Supervisor,
 Ensure that all survey points are OSHAD-SF- Codes
operators,
protected (Physical Protection- of Practice CoP
Damaging Survey workers,
Survey points 2 3 6 M Barrication) in order to minimize the 1 1 1 L 22.0 – Barricading
Points
likelihood of damage or displacement & of Hazards –
of Control Points. Version 3.0
Individuals

 Ensure that a safe area is provided


( a scaffolding structure covered with
green mesh and a suitable shade )for
the surveyor Supervisor, OSHAD-SF –
 Ensure proper area drawing and operators, Codes of Practice
Adverse Weather location information and maps are workers,
Surveyors, CoP 08.0 – General
conditions ( Windy 2 3 6 M 1 2 2 L
Helpers made available prior to the start of the Workplace
, hot climate) &
works Amenities – Version
 Ensure surveyors, helpers carry water Individuals 3.0
bottle with them . If it is humid , they
should be provided with prolyte
solutions.

Exposure to Dust Surveyors, 2 3 6 M  Ensure Dust mitigation measures are AEGC 1 2 2 L OSHAD-SF –
Helpers taken like wetting exposed soil, Codes of Practice
stockpiles shall be covered and CoP 08.0 – General

3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

managed when not in use, Vehicles


carrying supplies shall be covered
to prevent loose materials from Workplace
Amenities – Version
getting airborne , PPE ( Safety
3.0
glasses ) to be worn by workers
working nearby etc.

3 Material Delivery Overturning pick Public, 3 3 9 H  Ensure safe access and egress is Logic 1 3 3 L OSHAD-SF– Codes
on site – up / vehicle Workers, Fusion of Practice COP
provided at all times.
Land
(unloading carrying materials. Supervisors&  Ensure housekeeping is done and 44.0 Traffic
Drying
Dewatering Inspectors unwanted materials are not kept in works LLC Management and
pump and Unsafe Access & Logistics – V-3.0
egress, the work zone. Aisle and walkways to
fittings.) be kept clear. OSHAD-SF –
Overloading  Ensure that workers carrying out the Codes of Practice
works are training in manual handling. COP 17.0 – Safety
Collision
 Ensure that all workers unloading Signage and
Slips Trips and fall materials comply with appropriate Signals – Version
PPE requirements. 3.0
Falling of materials
 Ensure that certified and inspected
OSHAD-SF - Codes
Adverse weather mobile crane is used to unload the
of Practice COP
conditions. dewatering pump on site.
22.0 – Barricading
 Ensure that the operator and the of Hazards –
Human error
signalman (banksman), lifting gears Version 3.0
Unauthorized are certified by an ADM approved 3rd
access. party. OSHAD-SF –
 Ensure that mobile crane is inspected Codes of Practice
Property damage. COP 36.0 – Plant
and checklist is prepared by
and Equipment –

4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

competent operator. Version 3.0


 Ensure that Internal Traffic
OSHAD-SF –
management plan is implemented
Codes of Practice
 Provide pedestrian ways for workers
COP 2.0 – Personal
to avoid any Collision with moving Protective
pick up. Equipment - Version
 Work should be stopped in bad 3.0
weather because of poor visibility,
high wind, sand storm etc. OSHAD-SF –
 In case of any machine failure Codes of Practice
immediately inform supervisor and COP 08.0 – General
Workplace
stop activity.
Amenities – Version
 Ensure that the whole lifting operation
3.0
is monitored by competent
supervisor. OSHAD-SF –
 Tool box talks are given to the Codes of Practice
workers prior to the start of works. COP 34.0 – Safe
 Ensure that the method statement use of lifting
and risk assessment is Equipment and
communicated with the personnel Lifting accesories –
involved. Version 3.0
 Ensure that emergency services are OSHAD-SF –
available in case of an emergency Codes of Practice
( F. ex., Emergency vehicle, COP 53.0 - OHS
Emergency Team, First Aider, First Management During
Aid Facilities ). Construction Work –
Version 3.0

5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSHAD-SF –
Codes of Practice
COP 14.0 – Manual
Handling and
Ergonomics –
Version 3.0

OSHAD-SF –
Element 6 -
Emergency
Management

OSHAD-SF –
Element 2 - Risk
 Only trained workers carry out the Management
lifting activities.
OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Codes of Practice
CoP 21.0 – Permit
to Work Systems -
Version 3.0

Musanada Key
HSE requirements

6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

4 Pre-Auguring Toppling over Workers, 3 4 12 H  Ensure that drilling machine is in Logic 1 3 3 L OSHAD-SF –
using drill when travelling on Inspectors, Fusion Codes of Practice
good working condition and 3rd party
Land
machine slopped ground. Engineers. test & through examination. COP 17.0 – Safety
Drying
 Ensure that the operator is competent works LLC Signage and
Risk of collision. Signals – Version
and 3rd party certified and has valid
Injury due to license to operate the drilling 3.0
rotating machine, OSHAD-SF - Codes
equipment.  Ensure that the operator carried out of Practice COP
daily equipment inspections. 22.0 – Barricading
Contact with
underground  Ensure that separate pedestrian of Hazards –
utilities. access is available. Version 3.0
 PPE (Hi-Vis clothing, Hard Hat,
Unauthorized OSHAD-SF –
Gloves, Goggles, Safety Footwear)
access. Codes of Practice
rule must be enforced.
COP 36.0 – Plant
 Full time supervision is necessary by and Equipment –
competent person. Version 3.0
 Ensure that the operator is fully
competent and have valid license to OSHAD-SF –
operate the drilling machine. Codes of Practice
 Ensure the ground level is as per the COP 2.0 – Personal
design and drawing. Protective
Equipment - Version
 Ensure that the ground level is even.
3.0
demarcation to be done in case there
are excavations or uneven surfaces OSHAD-SF –
nearby. Codes of Practice
 Ensure that work is carried out only COP 08.0 – General
after conforming that there are no Workplace

7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

underground utilities. Drawings of the Amenities – Version


location to be made available and site 3.0
engineer to ensure nonexistence of
OSHAD-SF –
underground utilities.
Codes of Practice
 Permit to work procedure to be COP 34.0 – Safe
implemented. use of lifting
 Drilling machine rigger always to Equipment and
guide the operator when visibility is Lifting accessories –
restricted. Version 3.0
 Ensure that no workers / inspectors
stand too close to the rotating drilling OSHAD-SF– Codes
of Practice COP
bit.
44.0 Traffic
 Ensure that the area is barricaded
Management and
and Signage to be displayed to
Logistics – Version
prevent unauthorized access 3.0
 Crew Task Briefing before start the
works. OSHAD-SF –
Codes of Practice
COP 53.0 - OHS
Management During
Construction Work –
Version 3.0

OSHAD-SF– Codes
of Practice CoP
21.0 – Permit to
Work Systems -
Version 3.0

8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSHAD-SF –
Codes of Practice
COP 14.0 – Manual
Handling and
Ergonomics –
Version 3.0

OSHAD-SF –
Element 6 -
Emergency
Management

OSHAD-SF –
Element 2 - Risk
Management

OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Codes of Practice
CoP 21.0 – Permit
to Work Systems -
Version 3.0.

Musanada Key
HSE requirements

9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

5 Well Point Workers, 3 3 9 H  Aprons shall be available on site at all Logic 1 3 3 L OSHAD-SF– Codes
Installation Inspectors, Fusion of Practice CoP 2.0
times.
Personnel getting Engineers
Land
– Personal
 Medical eye wash station shall be Drying
wet. nearby Protective
available on site at all times. works LLC
Water Jetting Eye contamination  Ensure that workers, engineers, Equipment - Version
inspectors all comply with PPE 3.0
Requirements. OSHAD-SF –
 Ensure that unauthorized personnel Codes of Practice
are not allowed to enter the premises. CoP 08.0 – General
Signage and barrication to be Workplace
provided. Amenities – Version
 Ensure the works are monitored by 3.0
competent personnel.
OSHAD-SF –
 Ensure that manual handling training
Codes of Practice
is conducted prior to the start of the CoP 14.0 – Manual
works. Handling and
 Ergonomics –
Version 3.0

OSHAD-SF –
Codes of Practice
CoP 17.0 – Safety
Signage and
Signals – Version
3.0

OSHAD-SF- Codes
of Practice CoP

10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

22.0 – Barricading
of Hazards –
Version 3.0

OSHAD-SF –
Codes of Practice
CoP 34.0 – Safe
use of lifting
Equipment and
Lifting accesories –
Version 3.0

OSHAD-SF –
Codes of Practice
CoP 36.0 – Plant
and Equipment –
Version 3.0

OSHAD-SF– Codes
of Practice CoP
44.0 Traffic
Management and
Logistics – Version
3.0

OSHAD-SF– Codes
of Practice CoP
47.0 – Machine
Guarding Version
3.0

11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

OSHAD-SF –
Codes of Practice
CoP 53.0 - OHS
Management During
Construction Work –
Version 3.0

OSHAD-SF –
Element 2 - Risk
Management

OSHAD-SF –
Element 3 –
Management of
Contractors

OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

6 Well Point Noise Pollution Workers, 3 3 9 H  All non-sound attenuated equipment Logic 1 3 3 L OSHAD-SF –
Operation & Inspectors, Fusion Codes of Practice
to be fixed with warning signs.
Maintenance Pump Failure Engineer
Land
CoP 3.0 –
 All personnel nearby to comply with Drying
Occupational Noise

12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Injury from Moving PPE requirements ( Ear Plugs, Ear works LLC – Version 3.0
Parts. muffs)
Equipment OSHAD-SF– Codes
 Ensure that the works are carried out
Operation of Practice CoP
by competent personnel.
47.0 – Machine
 Standby pump unit (s) to be Guarding Version
connected to system at all times. 3.0
Equipment
 Guards and warning signs to be fitting
Maintenance OSHAD-SF –
to all machines with rotating parts.
 PPE (Hi-Vis clothing, Hard Hat, Codes of Practice
Gloves, ear plug/ ear muff, Goggles, CoP 36.0 – Plant
Safety Footwear) rule must be and Equipment –
Version 3.0
enforced.
 Ensure that maintenance is carried OSHAD-SF –
out by competent personnel and Codes of Practice
records are maintained. COP 17.0 – Safety
 Crew Task Briefing before start the Signage and
work. Signals – Version
3.0

OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Element 6 -
Emergency

13
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Management

OSHAD-SF –
Element 2 - Risk
Management

7 Discharge Workers, 3 3 9 H  Ensure that lifting equipment and Logic 1 3 3 L OSHAD-SF –


Installation Inspectors, Fusion Codes of Practice
gears are in good working condition
Operation & Objects falling. Engineer
Land
COP 36.0 – Plant
and lifting operation is managed Drying
Maintenance Serious injury to safely (3rd party test certification). works LLC and Equipment –
the personnel &  Area barricaded with signage to Version 3.0
Discharge Tank
Installation. property damage. prevent unauthorized access. OSHAD-SF– Codes
 PPE (Hi-Vis clothing, Hard Hat, of Practice COP 2.0
Discharge Sudden failure of
Gloves, Goggles, Safety Footwear) – Personal
flexible / lay flat wire rope / a chain
rule must be enforced. Protective
hose connection & hydraulic /
mechanical  Heavy duty discharge flexible / lay flat Equipment - Version
system. pipe shall be laid to reduce the risk of 3.0
leaks & damage.
Seepage of water OSHAD-SF –
 Sufficient and suitable size of water
on site. Codes of Practice
tank provided as per calculations.
COP 17.0 – Safety
Overflow of water Operator valid license. Signage and
from discharge  Valid 3rd party certificate for operator, Signals – Version
tank. riggers, lifting equipment & banks 3.0
man.
 Visible inspection required to ensure OSHAD-SF –
that there is no contact with overhead Codes of Practice
electric power lines/underground CoP 34.0 – Safe
use of lifting
utilities.
Equipment and

14
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

 Lifting accesories –
Version 3.0

OSHAD-SF- Codes
of Practice CoP
22.0 – Barricading
of Hazards –
Version 3.0

OSHAD-SF –
Codes of Practive
COP 39.0 –
Overhead and
Underground
Services - Version
3.0

OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

OSHAD-SF –
Element 2 - Risk

15
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

Management

8 Demobilization Workers, 3 3 9 H  Ensure that lifting equipment and Logic 1 3 3 L OSHAD-SF –


Inspectors, Fusion Codes of Practice
gears are in good working condition
Removal of Falling of Engineer
Land
COP 36.0 – Plant
and lifting operation is managed Drying
equipment materials. and Equipment –
safely (3rd party test certification). works LLC
Loading of Serious injury to  PPE (Hi-Vis clothing, Hard Hat, Version 3.0
Equipment on the personnel & Gloves, Goggles, Safety Footwear) OSHAD-SF– Codes
Site. property damage. rule must be enforced. of Practice COP 2.0
 Operator valid license . – Personal
Sudden failure of
 Valid 3rd party certificate for operator, Protective
wire rope / a chain
& hydraulic / riggers, lifting Equipment & banks Equipment - Version
mechanical man. 3.0
system.  Barricading the work areas.
OSHAD-SF –
 Warning sign boards need to place on
Seepage of water Codes of Practice
site.
on site. COP 17.0 – Safety
 Ensure emergency arrangements are Signage and
Overflow of water made available on site (emergency Signals – Version
from discharge vehicle, First Aid facilities, First Aider 3.0
tank. etc. )
 Ensure the water is discharged in OSHAD-SF –
segregated tanks / discharge units. Codes of Practice
CoP 34.0 – Safe
use of lifting
Equipment and
Lifting accessories –
Version 3.0

OSHAD-SF- Codes

16
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

of Practice COP
22.0 – Barricading
of Hazards –
Version 3.0

OSHAD SF-
Element- 5 –
Training and
awareness and
competency

OSHAD-SF –
Element 6 -
Emergency
Management

OSHAD-SF –
Element 2 - Risk
Management

Emergency Fire All personnel 3 4 12 H  All personnel to be safety inducted. AEGC 1 3 3 OSHAD-SF –
situations Collision  Train and inform all employees Codes of Practice
Electrocution regarding fire Emergency Evacuation CoP 17.0 – Safety
Failure to Plan. Signage and
Evacuation  Initiate and maintain good Signals – Version
housekeeping 3.0
 Ensure that all materials used in porta OSHAD-SF –
Codes of Practice
cabin construction are fire rated.
CoP 43.0 –
 Ensure that enough firefighting
Temporary
equipment are made available on

17
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

site. ( Fire Ex., Fire Hose Reel)


 Ensure that fire alarm and Fire siren
are available on site and are fully Structures - Version
functional. 3.0
 No smoking in non-designated areas. OSHAD-SF –
 Ensurre that smoke detectors are Codes of Practice
installed inside all offices. CoP 08.0 – General
 Ensure that workers are trained- how Workplace
Amenities – Version
to fight fire, what to do in case of an
3.0
emergency
OSHAD SF-
 Ensure that enough assembly points
Element- 5 –
are made available on site and Training and
access to them is kept clear at all awareness and
times. competency
 Ensure emergency numbers are OSHAD-SF –
posted at strategic locations. Element 6 -
 Ensure that Evacuation plan is posted Emergency
on notice boards and all are informed Management
about it during inductions.

Method Statement & Risk Assessment handover


Date: _ _ / _ _ /_ _ _

I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

18
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG- RA - 011
Package 1, Al  Falah KG Sector 1C plot P3
Rev. 00

RISK LEVEL RESIDUAL RISK LEVEL


S.No Activity HAZARD & RISK Groups Exposed Control Measures Action By Legal Reference
P S R RL P S R RL

All operatives involved with this job must sign below


I have read, understood and accept the conditions of this method statement and Risk Assessment.

Sr.
Name Emp. No. Emirates ID No Designation Date Signature
No. Remarks