Amount

No Description of Works Unit Quantity


Unit Price (Rp)
A Mobilization & Demobilization
1 Drilling Equipments (2 sets) LS 1
2 Personil LS 2

B Field Works
1 Core Drilling (8 location) m 145
* Weir center (15 m) m 15
* Weir left (20 m) m 20
* Weir right (20 m) m 20
* Waterway (3 x 15 m) m 45
* Head Pond (15 m) m 15
* Penstock (15 m) m 15
* Power house (15 m) m 15
2 Transportation between hole point 8
3 SPT every 2 m test 72
4 Sampling
a. Undisturbed Sample (Soil) test 15
b. Disturbed Sample (Rock) test 15
5 Constant Head Permeability Test test 15
6 Packer Test test 15
7 Platform point 1
8 Core Box nos 29
9 Sample delivery LS 1

C Laboratory Test
1 Physical Characteristic
a. Sieve analysis test 15
b. Water content test 15
c. Specific gravity test 15
d. Unit weight test 15
e. Organic content test 15
f. Atterberg limit test 15
g. Density test 15
2 Engineering Characteristic
a. Direct Shear Test test 15
b. Consolidation Test test 15
c. Triaxial Compression Test (UU) test 15
d. Uniaxial Rock Test test 15
e. Physical Properties of Rock Samples test 15

C Others
1 Reporting LS 1
2 Base Camp month 1
3 Local Transportation month 1
4 Security and Site Permit LS 1
Total
VAT 10%
GRAND TOTAL