Professional Documents
Culture Documents
ITP Bejana Tekan IMIP
ITP Bejana Tekan IMIP
ITP Bejana Tekan IMIP
2 External Inspection
a. Visual Inspection P V
- Support, anchors As built drawing Check list API RP 572 (Para 10.3.4)
- Level glass, PSV, press. & Temp gauges P&ID, As built drawing Check list API RP 572 (Para 10.3.10)
- Shell, head, nozzles, flange connections P&ID, As built drawing Check list ASME Sec VIII Div1, ANSI NB23
b. NDT (as required) Application Procedure Inspection / test report API 510 (para 7) P R
c. Thicknees Measurement NDT Procedure, As Built Drawing Wall thickness report API 510 (para 7) P V
d. Grounding Verification Application Procedure Grounding report PUIL 2000 P V
3 Nameplate ASME-NB23 Nameplate Manufacturer data report P V
Form U-1A / Drawing ASME Sec VIII Div 1 (UG-119)
4 Report
a. Final Inspection Report SOP PT FT No FT-SOP-OPR-01 Permen ESDM No 32 th 2021 P
b. Certificate of Inspection SOP PT FT No FT-SOP-OPR-10 Permen ESDM No 32 th 2021 P