SOP FOR ELECTRIFICATION OF HOUSING SCHEMES / COLONIES / SOCIETIES Pakistan Electric Power Company (PEPCO) January, 2019 y Pee PAK] STAN ELECTRIC POWER COMPANY (PVT.) LTD i3 (04299202031, . i OFFICE OF TEE Fax: (042) 99204743 GENERAL MANAGER (TECHNICAL SERVICES) PEPCG Email : gmtspepeo@gmail.com S50 Ha ‘721-WAPDA HOUSE LAHORE . Thon + No. 10-20/6M(TSV eR | Dated, 04.01.2019 Chief Executive Officers, » “iltls =| All DISCOs HE&o. Sub:- REVISION OF SOP FOR un OF HOUSING MES/ ILONTES / SOC) ~ It is of common knowledge that the SOPs for external electrification of housing schemes/ societies / colonies were standardized by WAPDA 25-years back, while dynamics of the Sector have changed tremendously since then. Consequently, revision of existing policy is badly felt. In @_ this regard, HESCO took the initiative’ and requested PEPCO for revision of the load criteria of ) housing schemes and high rise buildings. HESCO’s proposal was circulated to all DISCOs for ~" comments. In addition, some of the DISCOs have already modified the previously issued WAPDA $OPs/instructions and are following their own, after getting approval from the respective BODs. Since it is a matter of national/departmental interest, it was decided at the PEPCO level that overhauling of existing policy regarding extemal electrification of housing schemes be carried-out by taking all the DISCOs on board. As such, a number of consultative sessions with concerned GMs / CEs of all. DISCOs, CEO LESCO & CEO FESCO were held and thorough deliberations were carried, out on the subject matter. After mutual consensus. among all « — stakeholders, a draft of revised SOP has been prepared, which is exclusively meant for guidance of DISCOs. This draft SOP is thus required to be taken as guidance only for preperation of the - company specific SOP.for extemal electrification of housing schemes / colonies / societies, while incorporating specific local requicements, if needed. Implementation of the same in the field, ®, however, will be after approval or ratification by the respective BODs of DISCOs. On the’ other hand, a3 PEPCO coordinated with all the DISCOs and has provided technical support for preparation of a draft of uniform policy / guidelines on the issue, the draft ‘SOPs may not be considered as any specific direction from the management company and the final document be firmed-up as a DISCO SOP, thus warding-off any possible future legal complications for PEPCO. Abnlefe lve (Engr. Adnan Riaz Mir) General Manager (Technical Services) This is issued with the approval of Managing Director PEPCO. Encl: As above aCe SO to MD PEPCO. & Load Assessment-Criteria ‘The consultant will work out detail of plots to be fl frotti each distribution transformer according to load criteria. The assessed load on each distribution transformer should not exceed 80% of its rated capacity. Load Criteria for Cities, Dist. HQ Level, All Cantonment Areas 3 (Le epteapeheniee GED wissen op 3] Total tena ew 2 [Ganon i 909 TE = [ing Fane 20 1.500 cae beam: z i580 a9 [Ordinary Pugs 25 2500 ors 2 Power Plugs 6 +000, 6.900 ue 6.00 2 ACs 6 1500 ‘9000, 9.00 ~ Talend T741W Et “ ] Ss} Tota Demand z (sez! Componsity La: | Recta) | Total Lond 7) 5 ftgrroms 3200 30 398 | Ee 10 30 a3 Pe 369 30 a7 2 Dornan, Pugs = 200-0 ci 2 ppower Pts «00 Too 20 £309—[ Too 250 Ts * a ‘Total Load (kW) i or eee 2 | celing Fens 025 : [Sema rene é 3 cae % — [orcinary Plugs ig 106 0.45 é 2 [Power Pugs 2 | “1080 x00 : ace 250 30 Tora Loed To Kw = tat | Demand i Components No. | wats | Tet | Demand | coat vond ik) = ‘Light Points, 40. 40 1.600 30. 0.48 . 8 80. 0.640 30 O19 § 6 30 0.480 30 o.16 fa Ordinary. Plugs 10 100 1.000 30 2 (Bower Plugs. 2 TO00, 2.000, 100. ACs q SES = Light Points & Ceiling Fans 80. 0.400, 30 0.12 2 [Betousc rane [0.60 5a O05 a [oninary Paes Tos [ 000 30 a6 oe 2 [Bower Page Tom —[~.200=-|-—ioo 100 AGE 1509] 1300 700 50 estas ‘Total Load 1S Ww | Draft 30? for leceifation of Housing Schemes yen Wate? eet ait as cok sare Banks, Office Buildin 5 Beauty Parlors, Hair Saloons 4 ‘Schools, Mosques 3 Shops, Hospitals, Clubs, Community Centres, Restaurant, Hotels, Motels, Court 2 Rooms Lodges 13 Auditoriums, Masjid, Church 1 Garages, Corridors 05 ‘Ware-House Storage, Play Ground 025 ~ [Fan Load, TV, Refrigerator, Deep Freezer a 2 ‘Air Conditionifig Load 8 © Note: Load of other provisions like escalators, lifts, water supply, ete. will be taken as per actual - demand. GY w - Otaft $0? for Electrification of Housing Schemes | f * 6]P age ~---> Lead Determining Factors 1, Development Factor = 85% 2+ Diversity Factor = 125% 3. Power Factor = 85% 4, Location Factor (Big City) “= 100% 5. Location Factor (Small city*) = 80% . ULD = Total Demand x Development Factor x Location Fact a Diversity Factor UL.D = Ultimate Load Demand ~ ‘Loading of transformers may be kept within 80% 9 + Big City ‘= Dist. HQ. Cantonment Boards © Small City = Tehsil, Sub Tehsil & UC administration’ : Draft 0? for Electrification of Housing Schemes 7]Poge

You might also like