(1) How you will prove an asphalt mix design? Complete workout staring from quality test of
aggregate, percentage of course and fine, filler and bitumen, trial in lab, at plant, trial at site
standard job mix formula?
(2) What you will check before laying a mix?
(3) What happens to asphaltic mix when the temperatures reach to 180o C? - It will burn
(4) How you will observe that the mix is not good? - If it is more shining or burnt.
(5) How you will check a good quality of aggregates? - Sp. gravity, ACV, Sounding, LAA.
(6) Which aggregates are of better quality by origin? - Crushed aggregate form wadi.
(7) What is the effective asphalt content
(8) How you will design a concrete mix?
(9) What you will check before pouring? - Temperature slump.
(10) If the slump is 20 cm instead of 10 cm, what you will do?
● You will allow for pouring?
● You will wait for sometime?
● You will reject it?
Page 1 of 4
INTERVIEW FOR MATERIAL INSPECTORS
(28) Soundness
(29) Aggregates sampling
(30) Difference between road base and WMM
(31) Density test
(32) Asphalt layer
(33) How you check stockpile? - as per ASTM D 75, ASTM D979 2001
(34) If asphalt temperature less than 135o C what you will do? It may be only 1 o C less than
minimum limit?
(35) What is concrete temperature?
(36) What is the time limit for concrete placing?
(37) If concrete slump no OK, what you will do? - Reject
(38) How you take asphalt sample, please explain?
(39) What is subbase and how take sample?
(40) How you make field density test. If contractor cheat you, how can you catch?
(41) Explain proctor method.
(42) How you check tack coat and what is limit? - 0.3 - 0.6 c/m2
(43) How many layer of wet mix macadam road base? - 1 layer at a time
(44) At the time of asphalt paving what will the temperature of asphalt mix? - 135-163
(45) If the temperature is below the 120OC then what you will do? - Reject
(46) If the temperature is more the 163 O what you will do? Can you wait the temperature come
down? - Rejected
(47) If you have to start the asphalt paving what you will do first?
(48) How many layers of asphalt? - single layer at a time.
(49) Can you pave the two layers i.e. base course and binder course together? - No
(50) If you check the asphalt temperature and you found that is more 163 O and you are not allow
him for paving, the Contractor complained to your higher officer / engineer in-charge that
the temperature is within the limit, it will take some time. After some time the temperature
come down, what you will do? - check the mix burnt or not?
(51) From which point you will stand the asphalt? - Lower side
(52) If you area using SRC at one time that us not available and the work is very important did
you allow any other brand of cement? - No
(53) What is the rate of spare of prime coat? 0.7-1.5L/M2
(54) What is the rate of tack coat and temperature of tack coat at the time spray? - 0.3-0.6L/M2
(55) What is plastic limit?
Page 2 of 4
INTERVIEW FOR MATERIAL INSPECTORS
Page 3 of 4
INTERVIEW FOR MATERIAL INSPECTORS
● Stability : ………………………
● Flow : ………………………
● Density : ………………………
● Specific Gravity : ………………………
(84) Plot the CBR graph penetration vs. load KN and what is the penetration rate?
(85) What is the prevention rate while testing the compression strength of following:-
(92) While doing Gmm test in lab how much time is required for suction of air by using compressor:
i, 3-5 min ii, 5-10 min iii, 10-15 min iv, 15-25 min
(93) While doing mixture density relationship test, how many blows and layer are required:
Page 4 of 4