Professional Documents
Culture Documents
01 - IMS TMT 27 HSE Incident Notification
01 - IMS TMT 27 HSE Incident Notification
Incident details
Incident date / /2018 Incident time Date / time reported / /2018
Musanada PM Isameidin hassan Contractor Al Eslah Gen Cont Est Consultant Al Suweidi Engineering
ADFSP Phase 8
Project Name
Package 1
Incident Severity*
Serious (Injury / Illness / Dangerous Occurrence) Non-Serious (Injury / Illness / Dangerous Occurrence)
* Classification of this section shall be in reference to Occupational Safety & Health System Framework – Mechanism 11.0 – V3.0 – July 2016 (Schedules A, B & C)
Incident type
Fatality Property Damage Harm to animal
Occupational Injury Unsafe act Spill/Release/Discharge to Air
Occupational Illness Unsafe condition Spill/Release/Discharge to Land
Dangerous Occurrence Harm to Vegetation Spill/Release/Discharge to Water
Witness Details
name department
contact details manager
name department
contact details manager
Injury
Please indicate body part injured on chart below
Strain / sprain Cut /laceration
scratch bruising
fracture dislocation
burn foreign body
Sting / bite
other
Treatment Given
Consequences of Incident
1|Page
Restricted work case (days)
Incident details
Describe in detail what happened – what, where, who and how. Include diagrams images and use additional pages if required
Analysis – mark ‘X’ against the factors which are thought to have contributed to the cause of the incident
other
Corrective Action – what action is required to prevent the incident from happening again?
By who? By when?
2|Page
name signature designation date
Prepared by Hashmi Safety officer
Reviewed by Zafeer Arif OSH Engineer
Approved by Ayham sabouni Project Manager
3|Page