Yc1h422342-612 - Sop of Apfc Panel
Yc1h422342-612 - Sop of Apfc Panel
Panel Rating:
Panel-1 Rating- 33kV, 16000kvar APFC (Steps-1x2000 + 1x5000 + 1x9000kvar)
Document: Standard Operating Procedure of PLC Customer: M/s_EDEN Renewable Cite Pvt. Ltd
operated APFC
Our ref. No : SO Ref. 4202213901 Vendor Doc. No: YC1H422342-612
Prepared By : SD Rev No: 00
Approved By : VK Page No: [1]
Hitachi Energy India Limited (Formerly ABB Power Products and Systems India Ltd)
Document: Standard Operating Procedure of PLC Customer: M/s_EDEN Renewable Cite Pvt. Ltd
operated APFC
Our ref. No : SO Ref. 4202213901 Vendor Doc. No: YC1H422342-612
Prepared By : SD Rev No: 00
Approved By : VK Page No: [2]
Hitachi Energy India Limited (Formerly ABB Power Products and Systems India Ltd)
All Power & Control Connections are Properly tightened and connected as
per drawing
Panel filters are dust free and Fans are working properly to ensure proper
ventilation. Air Filters are to be checked periodically during maintenance
activities to avoid any blockage in Air Flow.
Ensure outdoor APFC Panel and PLC Panel is connected to Earth properly
All interconnections control and auxiliary power cables between Indoor
PLC Panel and Outdoor APFC Panel are connected properly as per drawing
and cable schedule
All REV-615 protection relays are healthy in PLC Panel
PLC Module & HMI is not having any error
All status is showing properly in HMI and PLC
Below process can be followed during Testing without 33kV Power Line:
Keep Upstream Circuit Breaker Open
Keep Isolator Open
Keep E/Sw Close
Force Feedback of Isolator Close, E/Sw Open and Upstream CB
Close Status to check Stage Vacuum Contactor Operation from PLC
Panel
Ensure no foreign particles are there after completion of
Testing/Maintenance activities
Ensure all doors are properly closed of Incomer and Stages after completion
of testing/maintenance activities
Document: Standard Operating Procedure of PLC Customer: M/s_EDEN Renewable Cite Pvt. Ltd
operated APFC
Our ref. No : SO Ref. 4202213901 Vendor Doc. No: YC1H422342-612
Prepared By : SD Rev No: 00
Approved By : VK Page No: [3]
Hitachi Energy India Limited (Formerly ABB Power Products and Systems India Ltd)
Below process can be followed during Charging the Cap Bank with 33kV
Power Line:
Close APFC Incomer Isolator and Open E/Sw
All doors of APFC Panel is closed properly
Castle lock is locked properly
Check all Status in PLC Panel
Upstream Circuit Breaker is closed
1 LED of Closing Allowable is GREEN on REV-615 relay of all stages
ON/OFF command to be given Automatically by PLC to Stages when
selector switch in AUTO mode
ON/OFF command to be given Manually by Physical Push Button on panel
or Soft Push Buttons in HMI to Stages when selector switch in MANUAL
mode
Use Door lock on Cap Bank Doors wherever applicable while it’s on service
Document: Standard Operating Procedure of PLC Customer: M/s_EDEN Renewable Cite Pvt. Ltd
operated APFC
Our ref. No : SO Ref. 4202213901 Vendor Doc. No: YC1H422342-612
Prepared By : SD Rev No: 00
Approved By : VK Page No: [4]
Hitachi Energy India Limited (Formerly ABB Power Products and Systems India Ltd)
Following activities to be done during emergency maintenance at the time of O/C, E/F
or Unbalance fault of any stage:
Share the results with Service team for further guidance during
emergency maintenance.
Document: Standard Operating Procedure of PLC Customer: M/s_EDEN Renewable Cite Pvt. Ltd
operated APFC
Our ref. No : SO Ref. 4202213901 Vendor Doc. No: YC1H422342-612
Prepared By : SD Rev No: 00
Approved By : VK Page No: [5]