Professional Documents
Culture Documents
Electricity Bill Aug 23
Electricity Bill Aug 23
Circle : GURUGRAM CIRCLE2 Gross Amount Payable After Due Date(`): 4523.00
Cycle/Group: ANXO/MD1 Issue Date: 09/03/2018
Meter and Read Details (* Latest MCO is shown in case of multiple MCO in one billing cycle)
Meter Reading Date Period Meter Reading Consumed Billed Units Bill Read Mtr
Meter No. Days MDI Unit M.F. Units Basis Rmrk Sts
Old New Old New
0.00
32362 21/06/2023 26/08/2023 61 (KW) KWH 22454 22906 1 452 452 OK OK A
Arrears Outstanding for the Financial Year (`) Slab Calculation Connection Details
Description Previous Current Total (`) Unit Rate Amount (`) Tariff Category DS
SOP Charges 0.00 1769.92 1769.92 305 4.500 1372.50 Flats in BS (DS) NA
F.S.A. 0.00 134.31 134.31 147 5.250 771.75 Supply Voltage(kV) 0.40 KV
Surcharge 0.00 57.00 57.00 Total 2144.25 Sanctioned Load (kW) 10.00
E. Duty 0.00 36.30 36.30 Applicable Tariff on Read Date: MMC(`) 1728.33
M. Tax 0.00 18.15 18.15 Cons. Security (`) 5000.00
Fixed Charges 0.00 0.00 0.00 Meter Security (`) 0.00
Excess Credit 0.00 0.00 0.00 Meter Ownership/MDI Meter CM/
Secure Meter Ltd. /3-PH-
Total Arrear 0.00 2015.68 2015.68 Meter Make/Meter Type
MTR
Details of Charges for Current Cycle Details of Amount Payable Last Payment Details
Description Amount (`) Description Amount (`) Amount(`) 3396.00
Fixed Charges 0.00 Current Cycle Charges 2379.29 Receipt No 460195044332
Energy Charges 2144.25 Arrears/Outstanding Dues 2015.68 Receipt Date 16/11/2017
MMC/FC for Reconnection 0.00 Sundry Charges/Allowances 0.00/0.00 Mode of Payment
Amount to cover MMC 0.00 Provisional Adjustment/BR Adj. 0.00 Previous Consumption Pattern
Fuel Surcharge Adjustment 167.24 LPS Adjustment 0.00 Units Units (KVAH)
Bill month (KWH) MDI Status
Reliability Charges 0.00 Other Non-Energy Charges 0.00
Excess Load Surcharge 0.00 Net Payable Amount 4395.00 Dec-2022 85 0 0 OK
Capacitor Surcharge 0.00 On Or Before Due Date(`) Feb-2023 41 0 0 OK
Meter Service Charges 0.00 Surcharge(`) 128.00 Apr-2023 14 0 0 OK
Line Service Charges 0.00 Gross Amount Payable After Due 4523.00 May-2023 14.38 0 0 OK
Capacitor Service Charges 0.00 Date(`)
Solar Rebate / BS Rebate 0.00/ Brief details of Sundry charges /allowances* 0zzz OK
Women Rebate 0.00 In case of bill is not paid within 7 days of due date the supply
Electricity Duty 45.20 shall be liable to be disconnected without any further notice.
Municipal Tax 22.60 Date from which bill other than "OK" is Reason:
Total Current Cycle being issued:
Charges (`) 2379.29
Payment of this bill can be made online by logging on the Under Section-56 of EA-2003, the supply of electricity shall not be cut off if the consumer deposits, under protest, a)
Website:www.dhbvn.org.in at any time and at office counter on an amount equal to the sum claimed from him, or b) the electricity charges due from him for each month calculated
all working days during working hours i.e. 09:00AM to 05:00PM. on the basis of average charge for electricity paid by him during the preceding six months, whichever is less,
pending disposal of any dispute between him and the licensee
Address and Telephone Number(s) of the authorities relating to consumers grievances