Project Title: Improve productivity at the picking process from direct logistics.
Section / Area : Basauri - Forum Supervisor: Aitor Domínguez Team Name: FORMULA 1 Start Date: OCTOBER 2012
Project Identification : (How did your Team identify this project?) Team : (Core & Support)
This project was identified by the Contract Manager, the Operations Manager and the supervisors after the Iratxe Saez (Contract Manager) (Support)
analysis of the internal kpi.
Hanot Echevarria (Operations Manager) (Suppo
Rationale : (Why should this project be addressed?) Diego Garcia (Capataz) (Core)
Improve productivity so we are able to use more resources at reverse logistcs avoiding Aitor Dominguez (Capataz) (Core)
labour extra cost hiring temporary workers. Jon Andoni Eguinoa (Mozo almacen) (Core)
Javier Garcia (Mozo almacen) (Core)
P
L
A
N
Cause Analysis : (What did you check?) Root Cause : (Direct Causes?)
Fishbone Diagram (Espina de pez = Ishikawa)
Differents ways
to seal the Prices labels
Waste of space at the mezzanine area
boxes (no
method)
Mistake
ubications Causes of: The
codes transportation waste
represents 35% of the
picking time
The picking strategy system it's not the
Supplier boxes
Pick up
Waste of time, when the
pickers are waiting for
the trolleys at the
double run for missing parts)
documents
Broken pallets second and third floor Waste of space at the
mezzanice locations.
Waste of time to Transport to the
move boxes boxes area
The WHS distribution is not
about areas (high or less
Several persons at movements)
the same aisle (not
remove material
enough space)
(throw away) It's not easy move the
The expedition zones are trolleys from B to C
not mark correctly
Start ABC analysis for the mezzanine area and identify the sections which have high movements Hanot Echevarria 13-Dic
D Checksheet implementation (control checks) for the materials (trolleys, RF, cutters, etc) Diego Garcia 26-Dic
O
Standardize the boxes at the mezzanine area (Check the reception process) Aitor Dominguez 15-Ene
Request to HP do the changes at the system for the picking of the missing parts/ products Hanot Echevarría/ Iratxe Saez 18-Feb
C
H
ESpain_6465_Forum Sport Efficiency_Picking LD_20121220 version english
13/05/2023 1
C
E
C
K
Action & Follow up : (What else needs to be done to ensure Sustainability?) Responsibility Start
A
C
T
The picking strategy system it's not the correct (send to the pickersdo a
double run for missing parts)
End Status
10-Dic Done
19-Dic Done
26-Dic In process
22-Ene To be done
25-Feb To be done