Professional Documents
Culture Documents
1200H April 13, 2023
1200H April 13, 2023
1200H April 13, 2023
Equipment Name ▲
Running Status.
Chilled Water Pump 1 Normal
Chilled Water Pump 2 Standby
Condenser Pump 1 Standby
Condenser Pump 2 Normal
Cooling Tower 1 Standby
Cooling Tower 2 Normal
Number
▲
General Power Equipment Status Running Status..
1 MVSG A Normal
2 MVSG B Normal
3 LVSG A Normal
4 ATS-LVSG A Normal
5 LVSG B Normal
6 ATS-LVSG B Normal
7 LVSG C1 Normal
8 ATS-LVSG C1 Normal
9 LVSG C2 Normal
10 ATS-LVSG C2 Normal
11 LVSG D1 Normal
12 ATS-LVSG D1 Normal
13 LVSG D2 Normal
14 ATS-LVSG D2 Normal
15 FSS A (Novec) Data Hall 1&2 Normal
16 FSS B(Novec) Data Hall 1&2 Normal
17 Transformer C Normal
18 Transformer D Normal
19 FSS A (Novec) Data Center 1 Normal
20 FSS B (Novec) Data Center 3 Normal
21 Transformer A Normal
22 Transformer B Normal
Number
▲
Room Name Running Status...
1 Synchro 1 FCU #1 -
2 Synchro 1 FCU #2 Normal
3 Synchro 2 FCU #1 Normal
4 Synchro 2 FCU #2 Normal
5 Battery Room 1 FCU #1 Standby
6 Battery Room 1 FCU #2 Normal
7 Battery Room 1 FCU #3 Standby
8 Battery Room 2 FCU #1 Normal
9 Battery Room 2 FCU #2 Standby
10 Battery Room 2 FCU #3 Standby
11 Battery Room 3 FCU #1 Normal
12 Battery Room 3 FCU #2 Standby
13 Battery Room 3 FCU #3 Standby
14 Battery Room 4 FCU #1 Standby
15 Battery Room 4 FCU #2 Normal
16 Battery Room 4 FCU #3 Standby
Number
▲
Emergency Backup Power Status..
1 Genset 1 Standby
2 Genset 2 Standby
3 Fuel Pump 1 Auto
4 Fuel Pump 2 Standby
5 Synchro 1 Panel Standby
6 Synchro 2 Panel Standby
7 Daytank 1&2 (Liters) 4957.2
8 Daytank 3 (Liters) 5672.5
9 Total Diesel Fuel Reserve (Liters) 10629.7
Number
▲
2F Parameter Reading. CPS1 (Rectifier Rm2) CPS2 (Rectifier Rm1) CPS3 (Rectifier Rm2) CPS4 (Rectifier Rm1)
2F DC1 (DC-DC
Converters) ▼
1-1 1-2 1-3 1-4 1-5 1-6 2-1 2-2 2-3 2-4 2-5 2-6 3-1 3-2 4-1 4-2
Current (Amps) 551 411 338 376 423 458 596 339 411 361 398 439 585 353 585 364
% Utilization 36 27 22 24 27 38 39 22 27 23 26 29 38 23 38 24
2F DC2 (DC-DC
Converters) ▼
3-3 3-4 4-3 4-4
Current (Amps) 61 2 64 2
% Utilization 4 0 4 0
Third Floor Electrical Rooms
Number
▲
Rooms Name... Running Status.....
Number ▲
3F Parameter Reading LVSG C LVSG D UPS 1. UPS 2.
1 Voltage (LL) Line 1 401 402 398 399
2 Voltage (LL) Line 2 404 405 397 398
3 Voltage (LL) Line 3 395 396 398 399
4 Current (LL) Line 1 74 79 7.8 3.6
5 Current (LL) Line 2 107 98 13.5 10.5
6 Current (LL) Line 3 103 13.5 11.6 7.2
7 Power KW (Ave) 63.79 65.35 111.67 98.77
Number ▲
3F UPS 1 and UPS 2 Rooms Load on. Inverter. Bypass. Battery.
1 3F UPS 1 unit Load on Inverter Normal - -
2 3F UPS Battery 1 - - - Normal
3 3F UPS 2 unit Load on Inverter Normal - -
4 3F UPS Battery 2 - - - Normal
Remarks
Technician on Duty
Roger Noleda/ Rico Gonzales/ Paul Marking Mateo/ Juleus Bines/ Jeffrey Cabigao/ Jerzhkie Manuel
Engineer on Duty
Paul Cansino/ Sarah Jean Langitgan/ Jan Aubrey Batangoso