Professional Documents
Culture Documents
SPMA Management Review
SPMA Management Review
Conducted on site
Date: 29 APRIL 2023
Participants
NAME POSITION SIGNATURE
Top management shall review the organization's EOMS and the strategy, at planned intervals, at least once per year, and update them accordingly to
ensure its continuing suitability, adequacy and effectiveness.
Management review no.4 Responsible Time Frame
Action taken
Mandatory requirements Person for compliance
Program heads 30 days to Corrective actions applied to produce the results of the
4) nonconformities and corrective actions; QMR accomplish JCMMC 01 s.2023
expressed in bar graphs and pie charts to prepare a “folder” to file corrective actions ready for
determine results and analyzed for action to audit
low performing process owners (
teachers/instructors)
Student’s Ratings of :
Shortage of classrooms)
6) audit results;
Prepare a folder for the “OUPUT” objective evidence
Audit results by third party : of ISO 9001:2015 compliance documentation dated
and presented.
no.1 CHED-MARINA Audit results addressed
and closed with objective evidences of
compliance as the output.
DNV
NSA
ISO
CHED/MARINA
The audit they conduct are called
Surveillance audit or “Periodic Audits
conducted annually starting from the date of
“RECERTICATION of the company’s ISO-QMS”
PACUCOA
TESDA
DOLE
Price list
Product line
ISO certification
Prepared by: