Project: GE Power / Narva
ACOUSTIC CLEANERS
1. General information
The operation of the acoustic cleaners is controlled by simply opening and closing solenoid valves which
are included in the system, one cleaner, one valve. Compressed air passes through the valve to the
sound generator which makes the cleaner to sound.
Typically the cleaner operates in sequences (T1+T2) of couple of seconds followed by a pause (T3) for
several minutes. This cleaning cycle is intended to be on always when boiler or process is running.
The operation sequence is controlled by PLC located in the vicinity of the economizer cleaners. Control
is based on Siemens S7-400 series redundant PLC with a Modbus / optic fiber connection to the DCS.
For local control and monitoring there is also a password protected touch screen HMI mounted to the
PLC cabinet door.
2. Cleaning operation
The graph below shows the typical cleaning cycle of a cleaner or a group of cleaners. The parameters
shown on the table are made accessible for the operators for cleaning optimization purposes.
1
V1. 21.6.2016
Project: GE Power / Narva
3. HMI – operation
Main page / login. To access the system you have to obtain the user name and the password to login.
Main Page. Electrically the economizer cleaners are divided in 12 groups, each consisting of 8 cleaners.
Cleaners cover 6 levels of eco 1, level 1 beeing the lowest. Two groups form each level.
You can start and stop the cleaning sequence in this page also. The sequence is fixed, starting from
the Group 1 and ending to the Group 12. Currently operating group is indicated with dark dots.
Note: the cleaning formation can be manipulated by wiring the groups together. The cleaning can be
intensified locally by operating 2 to 4 groups at the same time.
2
V1. 21.6.2016
Project: GE Power / Narva
From “SETUP” you can monitor operation parameters and change the pause between cleaning cycles
(T3, graph on the 1st page).
From “GROUP PARAMETERS” you can check and change the parameters for each group separately.
4. DCS parameters
All parameters that are accessible from the HMI are also made available for remote operation from
control room through the DCS.
3
Solenoid Valve
Coil: 230 VAC 15W
One subgroup
S consist of 8 cleaners S
in total
SUBGROUP 11
11
S
(4 could not be S
installed)
!
GROUP 3
Terminal Box 5
Cleaner Level 5
10
SUBGROUP 10 BA
L L CK
T WA WA
L
F L
SUBGROUP 9 LE
9 Sub. 12
Sub. 11
Terminal Box 4
Cleaner Level 4
Sub. 10
PLC CABINET 8 GROUP 3
SUBGROUP 8
Sub. 9
12
11 SUBGROUP 7
10 7
9
Sub. 8
8
7
6 GROUP 3 Sub. 7
5 Terminal Box 3
4 Cleaner Level 3
3
6
2
SUBGROUP 6 Sub. 6
1 GROUP 2
Sub. 5
SUBGROUP 5
5
Sub. 4
SUPLY
DCS
GROUP 1
Terminal Box 1 FR
Cleaner Level 1 ON A LL
TW TW
2 ! AL H
SUBGROUP 2 L RIG
SUBGROUP 1
1
NIRAFON OY
Moisionkatu 6
15100 LAHTI
FINLAND
ACOUSTIC CLEANING SYSTEMS
LIST OF DRAWINGS
TH1 EASY
Alstom Boiler France
Narva
NIRAFON OY
WORK NO 5784
NIRAFON NO OT20139
Page Drawing no
Appendix:
MJV-SÄHKÖ OY
P.O.Box 188
15101 LAHTI
Tel. +358-3-876 760
Fax. +358-3-876 7611
Email MJV-Sahko@MJV-Sahko.fi
Firm : NIRAFON OY Dwg.no : 578420 Nirafon no : OT20139
Machine : TH1 PLC-R Proj.no : 5784
PART LIST
KESKUS
RITTAL AE 1280.500 1 800x1200x300
CONTROL CABINET
PÄÄKYTKIN
Q00 ABB OT16 FT3 + OHBS2RJ 1
+ VÄÄNNIN
MAIN SWITCH
+ HANDLE
F20, F21, F22, F23, F24, F25 JOHDONSUOJA-AUTOMAATTI SCHNEIDER ELECTRIC A9F04102 6
CIRCUIT BREAKER
F10.1 AUTOSULAKE 1 5A
FUSE
MJV-Sähkö Oy 1 (3)
578420.docx
Firm : NIRAFON OY Dwg.no : 578420 Nirafon no : OT20139
Machine : TH1 PLC-R Proj.no : 5784
PART LIST
MJV-Sähkö Oy 2 (3)
578420.docx
Firm : NIRAFON OY Dwg.no : 578420 Nirafon no : OT20139
Machine : TH1 PLC-R Proj.no : 5784
PART LIST
MJV-Sähkö Oy 3 (3)
578420.docx
31.12.2015 Sivu 1/12
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440
Cable connections
Firm: Alstom Boiler France Proj. no.: 5784 Customer no.: OT20139
Machine: TH1 PLC-R Drawing no.: 578440