MUNICIPALITY OF TUNGA, LEYTE

LOCAL CLIMATE CHANGE ACTION PLAN


BUDGET YEAR : 2024

ANNEX 3-3

AIP TARGET OUTPUT ESTIMATED COST (PhP)


IMPLEMENTING IMPLEMENTATIO
REFERENCE SECTOR PROGRAM/PROJECT/ACTIVITY OFFICE/DEP'T. N SCHEDULE
CODE AIP AB AIP AB
(1) (2) (3) (4) (5) (6) (7) (8) (9)

MUNICIPAL ENVIRONMENTAL SANITATION Increased community


PROGRAM. Strengthen IEC on sanitation awareness on good
sanitation practices.
especially on households without toilets, Increased number of HHs
3000-3-01-011- Social Services regular water testing and chlorination of all MHO with access to safe water
500,000.00 Jan. 1, 2024 to
000 supply and sanitary toilets. Dec. 31, 2024
water sources, annual ocular inspection of all Attained zero (0) open
defecation status.
establishment before issuance of sanitary Decreased incidence of
water-borne diseases
permit

8000-3-01-010- Economic Rehabilitation of Flood Control System MEO/ Bgy. Council Length of road Length of road
5,000,000.00 Jan. 1, 2024 to
006-001 Services (San Vicente) constructed constructed Dec. 31, 2024

8000-3-01-010- Economic Continuation of Construction of Astorga- MEO/ Bgy. Council Length of road Length of road
8,500,000.00 Jan. 1, 2024 to
004-001 Services Banawang Road (Astorga area) constructed constructed Dec. 31, 2024

Construction of Drainage Canal along


8000-3-01-010- Economic Length of drainage Length of road Jan. 1, 2024 to
Services Tunga-Barugo Provincial Road (Astorga MEO/ Bgy. Council canal constructed constructed 4,500,000.00 Dec. 31, 2024
006-006 area) Phase 1

8000-3-01-010- Economic Continuation of Construction of Astorga- MEO/MENRO & Length of road Length of road
9,000,000.00 Jan. 1, 2024 to
004-002 Services Banawang Road (Banawang area) Bgy. Council constructed constructed Dec. 31, 2024

8000-3-01-010- Economic Improvement/Rehabilitation of Rizal MEO/MENRO & Length of road Length of road
3,500,000.00 Jan. 1, 2024 to
003-001 Services Street (San Pedro area) Bgy. Council constructed constructed Dec. 31, 2024

TOTAL ₱31,000,000.00 ₱0.00

Prepared by: Approved:

ENGR. MARLON B. ARINTOC MARILYN A. CUBILLA ENGR. REINBERT C. COSTELO


Mun. Planning & Devt. Coordinator Mun. Budget Officer Municipal Mayor
Date: ____________________ Date: ____________________ Date: ____________________

1/1