SCHEDULE OF LOADS

PROJECT : Installation of MERALCO kWh Meter for single Dwelling (Residential)


OWNER :

LOCATION:

TYPE OF SERVICE: 230V,3 WIRES, 60Hz, SINGLE PHASE


Load No. of PROTECTION CONDUCTOR CONDUIT
Ckt. # VA VOLTS AMP.
Description Outlets AT AF P Cu wire Dia.

1 Lighting Outlet 6 300 230 1.304 15 50 2P 2-2.0mm2 THWN 13mm Upvc


2 Convenience Outlet 3 1080 230 4.696 20 50 2P
2-3.5mm2 THWN 13mm Upvc
3 ACU 1HP 1 1840 230 8.000 20 50 2P
3220 sub- TIL 11.200
Main Feeder & Protection = 40 50 2P 2-5.5mm2 THHN 20mm Upvc

Total Connected Load = 3,220.00 watts


Main Feeder
COMPUTATION OF LOADS Service Conductor & conduit Service Entrance Equipment
2,576.00 watts Use: 2 - 8.0 mm2 THWN Cu. wire Use: 50A Main C.Breaker
IL=
230 1 - 8.0 mm2 THWN Cu. Wire 230 V, 2P, 2 Wires
TIL= 11.2 A @ #25mm dia. RSC.