Professional Documents
Culture Documents
DOPAK - Closed - LPG - S32-LG Expansion Chamber & Purge Expansion F4
DOPAK - Closed - LPG - S32-LG Expansion Chamber & Purge Expansion F4
1 OPERATION/FUNCTION
2 - expansion 3 - vent/purge
Turn the handle to the “expansion” Open the valve on the expansion
position. The internal connection chamber and the valve in the purge
between the sample cylinder and line. The expansion chamber
the expansion chamber has now and quick connects are being
been made. Maintain this position depressurised to the vent system
for any required time to enable the and purged with an inert gas.
fluid to divide over the sample Close both valves by releasing the
cylinder and expansion chamber. handles.
Close the two needle valves of the
sample cylinder.
PROCESS IN
VENT
4 BASIC SPECIFICATIONS
Please note: the above is a basic specification only. DOPAK® Samplers can be
offered with a wide variety of options as mentioned below.
5 OPTIONS