CP & SANITARY FITTINGS TO BE FINALLY COORDINATED WITH VENDOR TEAM (TECHNICAL) Drawn By Checked By Authorised By hive india FIRST FLOOR sco-5, SONALI MANDEEP HIVE main huda market, sector 31 Do not scale-off this drawing. Hive India take no responsibility for any gurgaon-122017 Scale Drawing No. type.project name.code.number dimensions obtained by measuring or scaling from drawing and no reliance 01244102262 may be placed on such dimensions. if no dimension is given, it is the resposibility of the recipient to ascertain the dimension specifically from the NTS AR-RB29-60-04A architect or by site measurement. plumbing Drawing Date Revision Date Revision No. The sizing of all structure and service elements must always be checked electrical against the relevent engineers drawings. No reliance should be placed upon hvac sizing information shown on this drawing. structure 03-05-2023 12-06-2023 R3