Professional Documents
Culture Documents
Electricity Bill Duplicate Bill
Electricity Bill Duplicate Bill
Meter and Read Details (* Latest MCO is shown in case of multiple MCO in one billing cycle)
Meter Reading Date Period Meter Reading Consumed Billed Bill Read Mtr
Meter No. MDI Unit M.F.
Old New Days Old New Units Units Basis Rmrk Sts
0.00
7316699 11/04/2023 08/06/2023 58 KWH 3070 1 406 PR RNT A
(KW)
Arrears Outstanding for the Financial Year (`) Slab Calculation Connection Details
Description Previous Current Total (`) Unit Rate Amount (`) Tariff Category DS
SOP Charges 0.00 0.00 0.00 290 4.500 1305.00 Flats in BS (DS) NA
F.S.A. 0.00 0.00 0.00 116 5.250 609.00 Supply Voltage(kV) .23
Surcharge 0.00 0.00 0.00 Total 1914.00 Sanctioned Load (kW) 2.00
E. Duty 0.00 0.00 0.00 Applicable Tariff on Read Date: MMC(`) 483.33
M. Tax 0.00 0.00 0.00 Cons. Security (`) 1000.00
Fixed Charges 0.00 0.00 0.00 Meter Security (`) 1000.00
Excess Credit 0.00 -0.34 -0.34 Meter Ownership/MDI Meter Nigam meter/
Total Arrear 0.00 -0.34 -0.34 Meter Make/Meter Type L & T /1-PH-MTR
Details of Charges for Current Cycle Details of Amount Payable Last Payment Details
Description Amount (`) Description Amount (`) Amount(`) 1887.00
Fixed Charges 0.00 Current Cycle Charges 2163.79 Receipt No 309492573805
Energy Charges 1914.00 Arrears/Outstanding Dues -0.34 Receipt Date 06/05/2023
MMC/FC for Reconnection 0.00 Sundry Charges/Allowances 0.34/-0.34 Mode of Payment
Amount to cover MMC 0.00 Provisional Adjustment/BR Adj. 0.00 Previous Consumption Pattern
Fuel Surcharge Adjustment 150.22 LPS Adjustment 0.00 Units Units
Bill month MDI Status
Reliability Charges 0.00 Other Non-Energy Charges 0.00 (KWH) (KVAH)
Excess Load Surcharge 0.00 Net Payable Amount Jun-2022 263 0 0 OK
2163.00 Aug-2022 124 0 0 OK
Capacitor Surcharge 0.00 On Or Before Due Date(`)
Meter Service Charges 38.67 Surcharge(`) 63.00 Oct-2022 200 0 0 OK
Line Service Charges 0.00 Gross Amount Payable After Dec-2022 525 0 0 OK
Due Date(`) 2226.00 Feb-2023 538 0 0 OK
Capacitor Service Charges 0.00
Solar Rebate / BS Rebate 0.00/ Apr-2023 365 0 0 OK
Brief details of Sundry charges /allowances*
Women Rebate 0.00
Transfer Adjustment from Over Payment
In case of bill is not paid within 7 days of due date the supply T
Electricity Duty 40.60 shall be liable to be disconnected without any further notice.
Transfer Adjustment from Over Payment Date from which bill other than "OK" Reason:
Municipal Tax 20.30
Total Current Cycle is being issued:
2163.79
Charges (`)
Page 1 of 1