PART 2 WORKS REQUIREMENTS

THE METRO MANILA SUBWAY PROJECT PHASE 1


Section VI Works Requirements
PACKAGE CP105
Technical Specifications (TS)

1801 ARCHITECTURAL CONCRETE FLOOR COATING


1801.1 General
The works in this section shall consist of the manufacture/supply, delivery and
installation/application onsite of architectural concrete floor coating, in accordance
with this Specification and in conformity with the Drawings or as established by the
Engineer.
1801.1.1 Summary
This section includes the furnishing of materials and equipment and performing
labor necessary to complete the installation/application of architectural concrete
floor coating as shown on the Drawings and as specified herein:
1) Section Includes
a) Epoxy-based Floor Finish.
1801.1.2 Post-Contract Submittals
1) Product Data: Current edition of manufacturer’s product literature including
physical data, chemical resistance, surface preparation, and application
instructions.
2) The Contractor shall submit manufacturer’s technical information including
basic materials and application instructions for each coating material specified.
3) The Contractor shall provide samples of each color and material to be applied,
with texture to simulate actual conditions, on representative samples of the
actual substrate. The Contractor shall resubmit samples as requested by the
Engineer until the required sheen, color and texture is achieved.
1801.1.3 Closeout Submittals
1) General: Comply with the Closeout Procedures (if any) and submit the
following:
a) Warranties: As specified hereunder.
b) Operation and maintenance manuals: Include material and product
details with the manufacturer's reference numbers, descriptions of
materials and procedures for maintenance.
1801.1.4 Codes and Standards
1) ASTM International (ASTM)
ASTM C150/C150M 19a Standard Specification for Portland
Cement
ASTM C579-18 Standard Test Methods for Compressive
Strength of Chemical-Resistant Mortars,
Grouts, Monolithic Surfacings, and
Polymer Concretes
ASTM D2047-17 Standard Test Method for Static
Coefficient of Friction of Polish-Coated
Flooring Surfaces as Measured by the
James Machine

546
PART 2 WORKS REQUIREMENTS
THE METRO MANILA SUBWAY PROJECT PHASE 1
Section VI Works Requirements
PACKAGE CP105
Technical Specifications (TS)

ASTM D2240-15e1 Standard Test Method for Rubber


Property—Durometer Hardness
ASTM D2370-16 Standard Test Method for Tensile
Properties of Organic Coatings
ASTM D4060-19 Standard Test Method for Abrasion
Resistance of Organic Coatings by the
Taber Abraser
1801.1.5 Quality Assurance
1) Qualifications
a) The manufacturer shall have a minimum of ten (10) years’ experience
in the production, sales, and technical support of similar materials and
products. Manufacturer is required to meet all provisions of this
specification as well as provide evidence for compatibility between
components to the satisfaction of the Engineer
b) The applicator/installer shall have a minimum of five (5) years’
documented experience in the application of similar materials and
products.
2) Mock-ups: Apply mock-ups to verify selections made under sample
submittals and to demonstrate aesthetic effects and set quality standards for
materials and execution.
a) Apply full-thickness mock-ups on 1200 mm square floor area selected
by the Engineer. Include 1200 mm length of integral cove base.
b) Test mock-up with anticipated chemicals to be used in the designated
area.
c) Approved mock-ups not damaged during the testing cannot become part
of the Works.
d) Sign-off from the Engineer on texture for slip-resistance and
cleanability must be completed before commencing application of floor
coating system.
3) Quality Benchmark Installation
First structural bay of each type of epoxy-based, resinous floor coating and
floor hardener in location to be agreed with and to the acceptance of the
Engineer.
1801.1.6 Delivery, Storage and Handling
1) Packing and Shipping
All materials are to be delivered to the job site in the manufacturer’s original
packaging. The product code and other identification marks should be
clearly marked and visible.
2) Storage and Protection
a) All materials shall be stored in a cool, dry place out of the direct
sunlight and away from any ignition sources. The applicator should
refer to the manufacturer’s literature and material safety data sheets for

547
PART 2 WORKS REQUIREMENTS
THE METRO MANILA SUBWAY PROJECT PHASE 1
Section VI Works Requirements
PACKAGE CP105
Technical Specifications (TS)

more information on storage and protection of all materials on the job


site.
b) Material Safety Data Sheets (MSDS) shall be kept on the job site and
made readily available for all personnel.
c) Keep containers of materials sealed and ready for use.
1801.1.7 Warranty
Provide an “extended warranty” beyond DNP joint and several warranties signed on
a single document by manufacturer and installer/applicator jointly and severally
warranting the materials and workmanship for a period of five (5) full years from
date of the Taking-Over Certificate.
1801.2 Products
1801.2.1 Product Selections
1) Epoxy Coating – Dust Proofing
a) Description: Epoxy-based paint applied to locations indicated on the
Drawings.
b) Manufacturer: As approved by the Engineer.
c) Substrate: As indicated on the Drawings.
d) Color: As selected by the. Engineer.
e) Preparation: In accordance with the paint manufacturer's
recommendations.
f) Application: Roller, brush or spray.
2) SKT-08 Epoxy Paint Skirting
a) Description: Epoxy paint skirting applied to locations indicated on the
Drawings.
b) Manufacturer: As approved by the Engineer.
c) Substrate: As indicated on the Drawings.
d) Color: As selected by the. Engineer.
e) Preparation: In accordance with the paint manufacturer's
recommendations.
f) Application: Roller, brush or spray.
1801.2.2 Materials
1) Epoxy-Based Coating
Conform to the respective specification, standards and requirements specified
herein.
a) Epoxy-based coating shall be two (2) component epoxy resins and
polyamide curing agent as follows:
(i) Solvent-free two (2) components colored epoxy for self-
smoothening screeds or approved equal.

548
PART 2 WORKS REQUIREMENTS
THE METRO MANILA SUBWAY PROJECT PHASE 1
Section VI Works Requirements
PACKAGE CP105
Technical Specifications (TS)

(1) Self-smoothening floor coating: 2-3 mm layer thickness


(2) Primer: Self-smoothening floor primer.
(3) Color and texture: As selected by the Engineer.
1801.2.3 Source Quality Control
1) Obtain primary chemical-resistant seamless epoxy-based coating materials
including primers, resins, hardening agents, finish or sealing coats
respectively from a single manufacturer with not less than ten (10) years of
successful experience in supplying similar materials for work of type
described in this section. Provide secondary materials only of type and from
source recommended by manufacturer of primary materials.
1801.3 Execution
1801.3.1 Examination
1) Examine the areas and conditions where the floor coating system is to be
installed and notify the Engineer of conditions detrimental to the proper and
timely completion of the work where the detrimental conditions are
attributable to the Interface Contractors. Do not proceed with the work until
unsatisfactory conditions have been corrected in a manner acceptable to the
Engineer.
2) The Contractor shall proceed with epoxy-based floor coating, floor hardener
and resinous finish work only after substrate construction, including curbs,
spill dams and equipment pads, and penetrating work through substrate has
been completed. No phased construction shall be permitted by the Engineer.
1801.3.2 Preparation
1) Patching and Joint Preparation
Prior to architectural concrete floor finish coating application, the floor shall
be examined for spalls, pits, holes, cracks, non-functional joints, and other
defects. These defects must be treated after substrate preparation and before
coating application with the suitable manufacturer- and applicator-
recommended products. For functional or expansion joints, these shall be
treated with 100% solids elastomeric resin having a minimum elongation of
150%.
2) Concrete Surfaces
Shot-blast, diamond-grind or power-scarify as required to obtain clean, open
porous concrete surface. Remove foreign materials to provide a sound surface,
free of laitance, glaze, efflorescence, and any bond-inhibiting curing
compounds or formwork-releasing agents. Remove grease, oil, and other
penetrating contaminants as well. Repair damaged and deteriorated concrete
to acceptable condition; leave surface free of dust, dirt, laitance, and
efflorescence.
1801.3.3 Application
1) Prime Coat: Apply primer over prepared substrate at manufacturer’s
recommended spreading rate. Coordinate timing of primer application with

549
PART 2 WORKS REQUIREMENTS
THE METRO MANILA SUBWAY PROJECT PHASE 1
Section VI Works Requirements
PACKAGE CP105
Technical Specifications (TS)

application of topping mix to insure optimum adhesion between chemical-


resistant epoxy-based coating materials and substrate.
2) Finish or Sealing Coat: After topping mix has cured sufficiently, apply finish
or sealing coat of type required by the manufacturer to produce required finish
indicated and in number of coats and spreading rate recommended by
manufacturer.
3) Epoxy-based Coating
a) Application
(i) Comply with epoxy-based coating manufacturer’s written
instructions for installation of epoxy coating system, including
surface preparation, joint treatment, flashing, reinforcement,
accessory items and surfacing.
(ii) Apply materials by methods as instructed by epoxy
manufacturer to provide uniform thickness.
b) Adjusting, Cleaning and Protection
(i) Upon completion of the work, repair surfaces that have been
permanently stained, marred, or otherwise damaged. Replace
work that is damaged or cannot be adequately cleaned as
directed.
(ii) Upon completion of the work, remove unused materials, debris,
containers and equipment from the job site. In addition to the
initial cleaning procedure required, clean the work before
acceptance by the Engineer.
(iii) Protect the work during the installation period so that it will be
without any indication of use or damage at the time of
acceptance. Until the epoxy-based coating is fully cured and
protected with a temporary covering during the construction
period, keep the coating areas free from traffic and other trades.
Provide necessary temporary protection to prevent damage,
such as that caused by traffic, gouging, scraping, and spillage
of deleterious substances, excessive heat, or other manner.
1801.3.4 Site Quality Control
1) The Engineer reserves the right to invoke the material testing procedure at any
time, and any number of times during period of architectural concrete floor
coating application.
2) The Contractor shall engage service of an independent testing laboratory to
sample materials being used. Samples of materials shall be taken, identified
and sealed, and certified in the presence of the Engineer.
1801.4 Measurement and Payment
1801.4.1 Method of Measurement
Epoxy-based floor coating shall be measured in square meters of floor treated and
accepted to the satisfaction of the Engineer.

550
PART 2 WORKS REQUIREMENTS
THE METRO MANILA SUBWAY PROJECT PHASE 1
Section VI Works Requirements
PACKAGE CP105
Technical Specifications (TS)

1801.4.2 Basis of Payment


The quantity measured as prescribed in Method of Measurement shall be paid for at
the contract unit price (BOQ) for epoxy-based floor coating which price and payment
shall be full compensation for the works under this section including furnishing and
installation of all materials, labor, equipment, tools and incidentals necessary to
complete the work prescribed in this section in all respects, duly complying with the
Contract documents including the Drawings.
Payment shall be made under:

Pay Item Number Description Unit of Measurement

1801 (1) Epoxy Coating – Dust Proofing Square Meter

1801 (2) Epoxy Coating Linear Meter

--- END OF SECTION ---