TO KARWAR TO MASTIKATTE

N
W
E

CTU RE
OF STRU
DETAILS

MATCH
.000
Arc Radius - 2000
Arc Radius - 2000.000 - 16+587.97
Arc Start Station

17+000
Arc Start Station - 16+202.79 - 16 +801.18
Arc End Station

LINE
16+900
Arc End Station - 16+343.87 3. 20 9
Arc Length - 21
MATCH LINE

Arc Length - 141.090 Tangent - 106.705

16+800
Tangent - 70.574 0 km/h Kmph PROW
Design Speed- 10 PROW

16+700
PROW
Design Speed- 100 km/h Kmph
16+000

PROW

16+600
16+100

16+500
PROW

16+400
16+200

PROW

16+300
PROW
PROW
PROW
PROW
PROW PROW PROW PROW
PROW PROW PROW PROW
PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW
PROW
HIP No. = 42
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW
CH = 16694.678 PROW
HIP No. = 41 PROW
11,21

PROW
CH = 16273.359 PROW
PROW PROW
PROW PROW PROW
PROW PROW PROW
PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW

DETAILS OF STRUCTURE

BUS BAY
@ CH : 16+307.5

General Notes:- Existing Legend PROPOSED LEGEND FOR 4 LANE SECTION PROPOSED LEGEND FOR 2 LANE SECTION
Consultant: Client:
NATIONAL HIGHWAYS ZONE, BENGALURU
1. All Dimensions and levels are in m. Blk Name Description
FOOTPATH ESH EDGE
BW1 Borewell
Unless otherwise specified. DRAIN PSH EDGE Project:
COTR Coconut Tree Widening to Four Lane from km 0.000 to Km 18.000
2. Follow the written dimension and do e Electric Pole
PSH EDGE C/W EDGE
not measure the drawing. FS Furlong Stone of NH-52 (old NH-63) in the State of Karnataka under
GS Gas Stone C/W EDGE PCL Annual Plan 2022-23 on EPC Mode.
HP1 Hand Pump
PCL/median
EROW EXISTING RIGHT OF WAY KMS Kilometer Stone C/W EDGE Title: HORIZONTAL PLAN AND PROFILE
LP Light Pole
PROW PROPOSED RIGHT OF WAY C/W EDGE PSH EDGE FROM CH : 16+000 TO CH : 17+000
MH Manhole
NB Name Board PSH EDGE ESH EDGE Assistant Engineer Assistant Executive Engineer Scale:
Hor - 1:2000, Ver - 1:200 @ A2
Sheet No.
17 OF 19
OFC Optic Fibre Cable
DRAIN BRIDGE PROFILE : National Highway Sub Division, National Highway Sub Division, Drg. No.
SP1 Signal Post NH-63/VLS/HK/HW/PNP- 17
Karwar Karwar
T

FOOTPATH MAJOR & MINOR VER. TANGENT


TAP Tap Drawn Designed Checked Approved Date Revision No.
TF tf Transformer
POINT
Sudheendra Amaresh Amaresh Amaresh 16-11-2021 R1
TP Traffic Pole HOR. TANGENT POINT
TR1 Tree-1 HIGH/LOW POINT REVISION
Rev. No. Description Date
TR2 Tree-2 Executive Engineer R1 Profile Levels Revised 30-12-21
TR3 Tree-3 National Highway Division,
TR4 Tree-4
CULVERT:PIPE, BOX & SLAB EXIST. ROAD
Karwar