Cost Estimate: Ada 3344 Yosemite Ave. El Cerrito
Cost Estimate: Ada 3344 Yosemite Ave. El Cerrito
PROJECT INFORMATION:
COST ESTIMATE
Contact: Jobsite Address:
DATE:
Client: Address:
Ada
Phone:
Phone:
$28,400
Revisions: CSI Specs: Addendums:
SOFT COSTS
1 2 3 4 5 6 7 8 9 10 11 12 Reports and Assessments: Design and Engineering: Permits and Design Review: Utility Application and Engineering: Temporary Facilities and Control: Monthly Utilities / Facilities Bills: Equipment and Machinery Leasing: Legal & Professional Fees: Taxes and Insurance: Miscellaneous Development Costs: Office and Management Fees: Miscellaneous Soft Costs:
ALLOWANCE
AMOUNT
$3,000
HARD COSTS
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Construction Preperation: Demolition and Removal: Grading and Excavating: Storm Runoff and Drainage: Utilities Mains ad Service: Roads and Easemants: Footings and Foundations: Structural Steel Framing: Structural Wood Framing: Rough Plumbing: Rough Electrical: Rough HVAC: Rough Fire Sprinklers: Rough Alternative Energy: Rough Low Voltage: Rough Miscellaneous: Exterior Moisture Protection Roof Covering and Gutters: Windows, Doors, and Skylights: Thermal and Sound Insulation: Interior Moisture Protection: Interior Wall and Ceiling Covering: Interior Trim and Molding: Interior Stairs and Railings: Interior Fireplace: Interior - Specialty Tile, Marble, and Stone:
Page 2 of 4
ALLOWANCE
AMOUNT
$200 $600 $0 $0 $0 $0 $3,600 $0 $2,800 $900 $900 $0 $0 $0 $0 $0 $400 $2,000 $1,500 $400 $0 $2,800 $800 $800 $0 $0 $0
HARD COSTS:
47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 Finish Flooring: Cabinets, Built-ins, Millwork: Countertops: Finish Plumbing: Finish Electrical: Finish HVAC: Finish Fire Sprinklers: Finish Alternative Energy: Finish Low Voltage: Finish Miscellaneous: Showers Doors, etc.: Hardware and Accessories: Appliances: Exterior Wall Finishes and Trim: Exterior Stone Vaneer: Exterior Stairs and Verandas: Exterior - speciality: Garage Door: Priming, Sealing, and Painting: Driveways, Patios, and Walkways: Decks, Gazebos, and Fencing: Barbeques, Exterior Built-Ins Pool, Spa, and Jacuzzi: Courts and Recreational Areas: Drainage and Irrigation: Landscape and Plantings:
ALLOWANCE
AMOUNT
Page 3 of 4
HARD COSTS
73 74 75 76 Clean-Up and Site Maintenance: Petty Labor: End Costs - Punch List: Miscellaneous:
ALLOWANCE
AMOUNT
$0 $0 $500 $0
$25,400
$0 $0