Skid Foundation Design

S.N Measurements
o. Description Formula Length(m) Width(m) Quantity Remarks/References
Dimension of Area (in m2) according to pump size and available area on
1 Pad Length*Width 5.95 2.52 14.95 site. Pump Size chart Ref. 1

Depth of Weight
3 (Pump and Density of
Footing Depth =
Weight/Density of RCC weight) Concrete Area Depth of Footing will taken as 1.23 or 49". (Weight of Pump
Concrete*Area 40,045 2175 14.95 1.23 = 5645 kg and Concrete 1:2:4 weight = 2500 kg/m 2)
Soil conditions and Weight and Size ratio is ok as
Weight of 377.5<386. See Ref. 2 table.
P (Kpa)= pump Area
2 Pressure Weight/Area 5645 14.95 377.5
Depth of
Punching Shear Applied Footing Concrete
Check Force/4*D*c Force in N (mm) Cover (mm)
(N/mm2) 392,654.4 1231.26 50 1.595
4 Punching Shear 1.562/mm2 < Allowable Stress 4N/mm2
Strength of
Allowable Concrete
Stress
Allowable Stress = (N/mm )
2

0.8(fcu)0.5 25 4

Ref. 1 Ref. 2

Skid and Foundation Dimensions


Steel Schedule for Skid Foundation
Dimentions
S.No Description Symbol Measurements (m) Remarks
1 Length of Footing X 5.95 19.5 feet
2 Breadth of Footing Y 2.52 8 feet 1 inch
3 Height of Footing h 1.37 4.5 feet
4 Dia of Main Bar dm 0.0254 #8 Bar
5 Dia of Distribution Bar dd 0.0127 #4 Bar
6 Spacing of Main Bar Sm 0.15 6 Inches
7 Spacing of Distribution Bar Sd 0.15 6 Inches
8 Concrete Cover c 0.05 2 Inches
Calculations
S.No Description Formula Quantity Remarks
1 Number of Main Bars Nm=(Y/Sm)+1 18 Number of Bars
2 Number of Dist Bars Nd=(X/Sd)+1 41 Number of Bars
Main Bar Cutting Length Cm1=[X-2c]+2[h-2c]-2[2dm] 8.29 m
Total Main Bar Cutting Length Top Cm=Nm*Cm1 147.26 m
3 Total Main Bar Cutting Length Bottom Cm=Nm*Cm1 147.26 m
Dist Bar Cutting Length Cd1=[Y-2c]+2[h-2c]-2[2dm] 4.908 m
Total Dist Bar Cutting Length Top Cd=Nd*Cd1 199.45 m
4 Total Dist Bar Cutting Length Bottom Cd=Nd*Cd1 199.45 m
Main Bar Steel (Kg) Top Wm=D2*Cm/162 586.44 Kg
5 Main Bar Steel (Kg) Bottom Wm=D2*Cm/162 586.44 Kg
Dist Bar Steel (Kg) Top Wd=D2*Cd/162 198.58 Kg
6 Dist Bar Steel (Kg) Bottom Wd=D2*Cd/162 198.58 Kg
Total Steel (Kg) 1570.03 Kg
Steel Quantity Check
Total Steel >= Min Quantity of Steel So,
1 Quantity of Steel (Min) L*W*h*1%*Density of Steel 1548.97 Steel is OK
Steel Schedule for Skid Foundation
Weight of 1m
Dia: of Bar Length of Total Length Total Weight
S.No Bar Type Shape of Bar No: of Bars length Bar
(mm) Bar(m) of Bar(m) of Bar (Kg)
(Kg/m)

Main
Reinforcem
25.4
1 ent (X- 18 8.29 294.51 3.982 1172.74
(#8bar)
Bars) Top
and Bottom

Distribution
Reinforcem
12.7
2 ent (Y- 41 4.91 398.90 0.996 397.31
(#4bar)
Bars) Top
and Bottom

TOTAL 1570.04