Skid Foundation Design

S.N Measurements
o. Description Formula Length(m) Width(m) Quantity Remarks/References
Dimension Area (in m2) according to pump size and available
1 of Pad Length*Width 3.05 0.61 1.86 area on site. Pump Size chart Ref. 1

Depth =
Depth of
3
FootingWeight/Density Weight (Pump and Density of Min Depth of Footing will taken as 0.96m or 38".
of RCC weight) Concrete Area (Weight of Pump = 5645 kg/6 and Concrete 1:2:4
Concrete*Area 4,287 2400 1.86 0.96 weight = 1800 kg/m2)
Weight of pump Area Soil conditions and Weight and Size ratio is ok. See
P (Kpa)= Ref. 2 table.
2 Pressure Weight/Area 5645 1.86 Concrete 3036.6
Punching Depth of Cover
Shear Force/4*D*c Applied Force in N Footing (mm) (mm)
Check (N/mm )2
42,036.0 960.87 50 0.219 Punching Shear 1.562/mm2 < Allowable Stress
4
Strength of Concrete 4N/mm2
Allowable
Allowable Stress (N/mm )
2
Stress
= 0.8(fcu)0.5 25 4

Ref. 1 Ref. 2
Steel Schedule for Skid Foundation
Dimentions
S.No Description Symbol Measurements (m) Remarks
1 Length of Footing X 3.05 10 feet
2 Breadth of Footing Y 0.61 2 feet
3 Height of Footing h 0.99 39 Inches
4 Dia of Main Bar dm 0.01905 #6 Bar
5 Dia of Distribution Bar dd 0.0127 #4 Bar
6 Spacing of Main Bar Sm 0.152 6 Inches
7 Spacing of Distribution Bar Sd 0.229 9 Inches
8 Concrete Cover c 0.05 2 Inches
Calculations
S.No Description Formula Quantity Remarks
1 Number of Main Bars Nm=(Y/Sm) 4 Number of Bars
2 Number of Dist Bars Nd=(X/Sd) 13 Number of Bars
Main Bar Cutting Length Cm1=[X-2c]+2[h-2c]-2[2dm] 4.65 m
Total Main Bar Cutting Length Top Cm=Nm*Cm1 18.62 m
3 Total Main Bar Cutting Length Bottom Cm=Nm*Cm1 18.62 m
Dist Bar Cutting Length Cd1=[Y-2c]+2[h-2c]-2[2dm] 2.240 m
Total Dist Bar Cutting Length Top Cd=Nd*Cd1 29.87 m
4 Total Dist Bar Cutting Length Bottom Cd=Nd*Cd1 29.87 m
Main Bar Steel (Kg) Top Wm=D2*Cm/162 41.70 Kg
5 Main Bar Steel (Kg) Bottom Wm=D2*Cm/162 41.70 Kg
Dist Bar Steel (Kg) Top Wd=D2*Cd/162 29.74 Kg
6 Dist Bar Steel (Kg) Bottom Wd=D2*Cd/162 29.74 Kg
Total Steel (Kg) 142.88 Kg
Steel Quantity Check
Total Steel >= Min Quantity of Steel So,
1 Quantity of Steel (Min) L*W*h*1%*Density of Steel 139.04 Steel is OK
Steel Schedule for Skid Foundation
Weight of 1m
Dia: of Bar Length of Total Length Total Weight
S.No Bar Type Shape of Bar No: of Bars length Bar
(mm) Bar(m) of Bar(m) of Bar (Kg)
(Kg/m)

Main
Reinforcem
19.05 4 Top
1 ent (X- 4.65 37.23 2.24 83.40
(#6bar) 4 Bottom
Bars) Top
and Bottom

Distribution
Reinforcem
12.7 13 Top
2 ent (Y- 2.24 58.24 0.996 58.01
(#4bar) 13 Bottom
Bars) Top
and Bottom

TOTAL 141.41
ESTIMATE
Job: LEVEL/DRESSING OF EXISTING SKID PAD AND CONSTRUCTION OF 3 NEW PADS FOUNDATION
(2.5'x2.5'x4') GENSET D-398 AT TANK FARM BALKASSAR
SCOPE OF WORK
S/N DESCRIPTION QUANTITY RATE AMOUNT

LEVEL AND DRESSING OF EXISTING


FOUNDATION 19.5'X8.08' (AVG. 3"
1 DEPTH) 40 CFT 290 PER 1 CFT 11600
DISMANTLING WITH JACKHAMMER (1.75'
2 DEPTH) = 11'x2.5'x3.5' 48.13 CFT 200 PER 1 CFT 9625

DISMANTLING AND EXCAVATION OF


ROCK FLOOR (1.75' DEPTH) SIZE =
11'x2.5'x3.5' 48.13 CFT 25 PER 1 CFT 1203.125

PROVING AND LAYING OF PCC (1:4:8)


USING LP SAND AND MARGALA CRUSH
3 (AVG. 6" DEPTH) SIZE = 1X10'X2'X0.5' 10.00 CFT 290 PER 1 CFT 2900

SUPPY, CUTTING, BENDING AND FIXING


OF STEEL GR 60 BAR SIZE (3/4")
INCLUDING USING 18 SWG BINDING WIRE
FOR PLACING REINFORCEMENT IN
POSITION INCLUDING CHAIRS AND
4 SPACER (SPACING 6" C/C BOTH SIDES) 150 KG 300 PER 1 KG 45000

PROVIDING AND LAYING OF RCC (1:2:4)


USING LP SAND AND MARGALA CRUSH
(COMPRESSIVE STRENGTH 3000 PSI) SIZE
5 = 1X10'X2'X3.25' 65 CFT 420 PER 1 CFT 27300
TOTAL 97628.125