date]
PROJECT PROPOSAL
FOR
MAY, 2021
Table of Contents
CHAPTER ONE - INTRODUCTION
Excutive Summary................................................................................................................................1
Description of Project............................................................................................................................1
Amount of Finance Required................................................................................................................2
Profile of Promoter................................................................................................................................2
The Applicant........................................................................................................................................2
Market Prospect.....................................................................................................................................4
Technical Feasibility..............................................................................................................................4
Organization and Management..............................................................................................................4
Financial Viablilty.................................................................................................................................4
Socio-Economic Justification................................................................................................................4
Comment on Rationale Behind Main Assumptions..............................................................................5
Key Success & Risk factors and SWOT Analysis................................................................................5
Mission and Vision Statement ..............................................................................................................6
CHAPTER TWO- PROJECT AND PRODUCT DESCRIPTION
Project Concept......................................................................................................................................7
Project Justification...............................................................................................................................8
CHAPTER THREE - MARKET ANALAYSIS
Demand and Supply Scenario..............................................................................................................10
Competitive Advantages......................................................................................................................11
Target market and Marketing Strategy................................................................................................11
Product range and product description................................................................................................12
Cement Concrete Hallow Blocks........................................................................................................12
Physical requirements..........................................................................................................................13
CHAPTER FOUR - RESOURCES
Main Resources...................................................................................................................................17
Raw materials and consumables..........................................................................................................18
CHAPTER FIVE - THE PLANT
Selection of technology.......................................................................................................................19
Production Capacity............................................................................................................................20
Details and specification of machinery and equipment’s....................................................................21
Production Process..............................................................................................................................21
Process and quality control..................................................................................................................25
Technical know-how...........................................................................................................................27
ANNEX
Projected Profit and Loss Statements for five years
Cash flow statements for five years
Depreciation Schedule
Unit Cost Calculation Sheet
Consumption of Raw Materials
Warehouse Purchaseing Agreement
Different Proforma Invoices
Tax Identification Certificate
Investment License
I. EXECUTIVE SUMMARY
1. Project Title – Modern Cement Based Concrete Products
2. Elements Construction materials (All cement production like terazo, concrete pole,
concrete tube and related)
1.1. Promoter – Top Candy Mafufacturing PLC
1.2. Status :- New
1.3. Nationality:- Ethiopian
2. Project Location:- Oromia Regional State
OSZSF Zone
Burayyu Town
3. Land Area and Capital
3.1. Premises Requirement: - 10,000 M2 (1hek)
4. Total Capital:- 76,000,000 Ethiopian Birr
Total Capital
4.1. Fixed Capital = 44,958,567 birr
4.2. Working Capital = 23,441,433 birr
4.3. Contingency = 7,600,000 birr
Source Fund
4.4. Own Equity (30%) = 22,800,000 birr
4.5. Bank loan (70%) = 53,200,000 birr
5. Planned Employment of the creation of the project
The total manpower required for the plant will be 250 employees
5.1. Permanent Worker :- 100
Skilled and Unskilled
5.2. On Temporary Basic :- 150
Skilled and Unskilled
6. Project Benefits for the Regional/Country
Add value to the economy, Source of Revenue to the government , Employment opportunity,
Save Foreign currency, Benefit for the local community, Stimulate the local economy and
technology transfer
1. Introduction
Ethiopia is one of the East African countries with the diversified climatic conditions, natural
scenery and resource bases This project envisages the establishment of a plant for the production
of prefabricated concrete with a capacity of 140,000 m 3 per annum.. Currently the country has
a total population of about 100 million of which more than 40 million is found in Oromia
regional state. Oromia is one of the regional states of Ethiopia with very fertile land, very
conducive weather condition both for crop production and animal husbandry.
The government of the Ethiopia has been excreting its maximum effort to expand investment
opportunities in the country by designing different policies and strategies that will facilitate
investment through attracting both domestic and foreign investors. Likewise, the Oromia
regional state government has been working day and night to make poverty history by making its
door open to investors both (domestic and foreign) to come and invest in the region.
Therefore, it is this ample opportunity and cumulative experience which makes the owner of the
project to envisage this concert construction materials industry in oromia special zone
surrounding finfine Zone in Holota town. The owner has a deep rooted experience in the field
because he has been serving on different managerial position from expert and technical manager
to general manager. Thus, it is these experiences which primarily motivated this investor to
develop the inception of this project idea.
Hence, being one of the concert construction materials production projects, it is planned to
provide: the soap that was imported from abroad. The present economic policy of our country
which is highly inviting the private sector to work on import substitution is highly motivating the
private sector to respond to the government invitation, there by contributing their share to the
development process. The project is identified because; the highly growing population of the
country is in need of different concert construction materials.
The major raw materials required are gravel, sand and cement which are available locally. The
present demand for the proposed product is estimated at 142,888 m 2 per annum. The demand is
expected to reach at 359,816 m2 by the year 2020.
The project is financially viable with an internal rate of return (IRR) of 19.28 % and a net
present value (NPV) of Birr 30.09 million, discounted at 8.5%.
Cement,
Gravel and
Sand producers and
Forward linkage with the construction sector.
Aggregates make up about 75 – 85% of the volume of concrete; and the paste 15 – 25%.
Buildings,
Roads,
Bridges and
Other structural requirements.
Currently the number of population of the country is alarmingly increasing and thus demands
huge concert construction materials plant of different types in their day to day operations. Hence
this project has the following objectives:
To undertake the production of the concert construction materials plant though scientific
methods and modern technology.
To serve as the source of government revenue through business income tax.
To serve as a role model for other investors who wants to invest in similar business
undertakings.
To contribute somewhat to the governments objectives of reducing the problem of un-
employment through creating employment opportunities to the citizens.
To bridge the demand gap of concert construction materials plant in the country.
To contribute in the import substitution policy of the government by locally producing
the soaps that will be imported earlier.
To contribute some to the area of self sufficiency.
A. MARKET STUDY
Concrete is a composite building material made from the combination of aggregate (composite)
and a binder such as cement. The most common form of concrete is portland cement concrete,
which consists of mineral aggregate (generally gravel and sand), portland cement and water.
After mixing, the cement hydrates and eventually hardens into a stone-like material.
For a concrete construction of any size, as concrete has a rather low tensile strength, it is
generally strengthened using steel rods or bars (known as rebars). This strengthened concrete is
then referred to as reinforced concrete. In order to minimize any air bubbles, that would weaken
the structure, a vibrator is used to eliminate any air that has been entrained when the liquid
concrete mix is poured around the ironwork. Concrete has been the predominant building
material in this modern age.
Major advantage of concrete construction for buildings is the material's inherent properties of
heaviness and mass, which create lateral stiffness, or resistance to horizontal movement.
The source of supply for pre fabricated concrete is essentially from the domestic producers.
Although the expanding building and construction sector has given rise to demand for concrete,
official statistics is not available. Failing to assess the demand for prefabricated concrete based
on the supply, end use approach is applied.
One of the factors that indicate housing construction activity is trend in the provision of land by
the city administration. In this regard the city administration has provided a total of 10,000 plots
of land with a total land area of 76 million m2 during the period 1998 – 2005 to private residential
quarters, commercial buildings and real estate developers. (See Table 3.1).
From the total land provided during the period of analyses the largest share in terms of number
of plots is accounted by private residential quarter (93.9%). However, in terms of land area the
largest (52.79 %) is provided to real estate developers followed by commercial buildings (24%)
and private residential quarter (23%).
Source: Land Administration Bureau of the Addis Ababa City Administration, 2006
During the period under review provision of land by the city administration for housing
construction activity has registered an average annual growth rate of 49.63% indicating the high
magnitude of housing demand and construction activity in the city both for commercial and
residential purpose.
Pre fabricated concretes are mainly used by high rise buildings. Accordingly, in order to estimate
the present demand for concrete based on end users method the present level of commercial
building construction is estimated first.
As can be seen from Table 3.1 during the period 1998 – 2005 the maximum number of plots
provided by the city administration for the construction of commercial buildings was 186 in year
2004 while the minimum was 5 in year 1998. However, during the period under consideration on
average 84 plots were annually granted for commercial building construction.
Even though during the same period plot of land provided for the construction of commercial
buildings shown a 172 % average growth rate, in order to estimate the present (2008) level of
commercial building construction it is conservatively assumed that commercial building
construction in Addis Ababa grows by 4% annually which is equivalent to the growth rate of
urban population.
Accordingly, by taking the average of 1998 - 2005 as a base and employing a 4% growth rate the
number of commercial building construction in Addis Ababa in the year 2008 is estimated at 94.
Moreover, in order to estimate the size of the commercial buildings, data on construction permits
in Addis Ababa is collected and analyzed. Table 3.2 shows the average building construction
permits given during the period 2000 – 2002 by type of building.
Market Prospect
According to current studies the products of the project have high demand as a result the project
will have a dependable all the year round market throughout the entire project's life. The
products produced by the project will be sold through direct sale channel to buyers. The project's
main market will be main cities of the country like Addis Ababa, Mojo, D/Zeit, Nazareth/Adama
and Awassa … etc.
Table 3.2
3 Storey’s 53 46.90
4 Storey’s 32 28.32
5 Storey’s 10 8.85
6 Storey’s 9 7.96
7 Storey’s 3 2.65
8 Storey’s 2 1.77
9 Storey’s 2 1.77
10 Storey’s and above
2 1.77
Total 113 100
Source “Statistical Abstract” CSA.
As can be seen from the above Table the highest number of permits was for three storey type of
buildings followed by four storey’s and five storey’s.
Accordingly, assuming that the past trend in the type of commercial building construction in
Addis Ababa will also currently apply , out of the total 94 commercial buildings estimated to be
constructed in year 2008, the estimated share of building types is shown in Table 3.3.
NUMBER OF COMMERCIAL BUILDINGS ESTIMATED TO BE CONSTRUCTED IN YEAR 2008 BY BUILDING
Types of Building % Share Estimated Number of
Commercial Buildings
3 Storey’s 46.90 44
4 Storey’s 28.32 27
5 Storey’s 8.85 8
6 Storey’s 7.96 7
7 Storey’s 2.65 2
8 Storey’s 1.77 2
9 Storey’s 1.77 2
10 Storey’s and above 1.77 2
Total 100 94
Floor Prefabricated
Estimated
Area Wall Area (m2) Concrete Demand ( m2)
Houses Demand
Building Type that For
Use Concert
(m2) External Internal Concrete Flooring External Internal
3 Storey’s 900 486 812 22 19,800 10,692 17,864 48,356
4 Storey’s 1,200 648 1,083 14 16,200 8,748 14,621 39,569
5 Storey’s 1,500 810 1,354 4 6,000 3,240 5,416 14,656
6 Storey’s 1,800 972 1,625 4 6,300 3,402 5,688 15,390
7 Storey’s 2,100 1,134 1,896 1 2,100 1,134 1,896 5,130
8 Storey’s 2,400 1,296 2,167 1 2,400 1,296 2,167 5,863
9 Storey’s 2,700 1,458 2,438 1 2,700 1,458 2,438 6,596
10 Storey’s
and above 3,000 1,620 2,709 1 3,000 1,620 2,709 7,329
Total 15,600 8,424 14,084 47 58,500 31,590 52,798 142,888
Accordingly, as can be seen from the Table 3.4 the present (2008) demand for pre-fabricated
concrete in Addis Ababa is estimated at 142,888 m 2 but in this time 10,000 m2 find in to dukam
town
2. Projected Demand
The rapid development of high-rise buildings has created high demand for pre fabricated
concrete. The demand for pre fabricated concrete is directly related with the growth in the
construction sector which in turn depends on the overall economic development of the country.
Therefore, demand is projected at the annual average GDP growth rate achieved in the past few
years i.e. 8.%. The projected demand is presented in Table 3.5.
2009 154,319
2010 166,665
2011 179,998
2012 194,398
2013 209,949
2014 226,745
2015 244,885
2016 264,476
2017 285,634
2018 308,484
2019 333,163
2020 359,816
Based on current retail price of prfabricated concrte and allowing a profit margin for retailers and
distribution costs, factory-gate price of Birr 1,750 per m3 is recommended.
The products could be distributed to the end-users directly.
B. PLANT CAPACITY AND PRODUCTION PROGRAMME
1. Plant Capacity
The capacity of the plant is envisaged to be 144,000m 3 per year. This is made on the basis of the
projected demand for concrete and the technology recommended.
2. Production Programmer
Concrete batching is based on straight forward and familiar technology. The plant can therefore
start operation at full capacity in the first year.
Accordingly, on the basis of single shift of 8 hours, the plant would produce about 144,000 m 3 of
concrete per year.
Total 210,492,000
B. UTILITIES
Electricity and water are the utility requirements of the plant. These are outlined in Table 4.2
below.
UTILITIES REQUIREMENT AND COST
Total 235,200
At the top of the organization structure, there will be a general manager with the responsibility of
supervising the overall activity of the plant. It is always true that Organization and Management
of the project plays a key role and bear direct impact on the success and profitability of the
project. The opportunities of being serviced by well skilled professionals well enable the
company to evaluate the internal weakness and strength of the company as well as to assess the
global opportunity and risks in the world market so that the company can cope up with the
dynamics of the market situation.
Therefore, it must particularly to the project under consideration, to give especial affection to
select and recruit the appropriate total manpower requirement for the plant will be employees at
full capacity.
The total number of manpower, manpower list, qualification, and salary and sex composition are
listed in the table below.
S Monthly
N Description No Qualification Salary Annual Salary
1 General Manager 1 BA in Business Management 10,000.0 120,000.00
0
2 Production Manager 1 BSC in industrial Engineering 5,000.00 60,000.00
3 Supervisor 1 BSC in Production 4,000.00 48,000.00
Technology
4 Secretary 1 Diploma In Secretarial 2,000.00 24,000.00
Science
5 Public Relation 1 Dip in Social Science 4,000.00 48,000.00
Officer
6 Personnel 1 Dip in HRM 4,000.00 48,000.00
7 Planning Officer 1 Dip in Economics/Statistics 4,000.00 48,000.00
8 General service 1 Dip in management 5,000.00 60,000.00
9 Color Operator 1 Diploma in Chemical 4,000.00 48,000.00
Engineer
10 Hydraulic 1 10+2 in general Mechanic 5,000.00 60,000.00
Technician
11 Machine Operators 4 10+2 in general Mechanic 5,000.00 240,000.00
12 Marketing head 1 BA in Marketing management 5,000.00 60,000.00
13 Purchaser 1 Diploma in Purch. & Suppli 5,000.00 60,000.00
mgt
14 Administer 1 Dip in Management 5,000.00 60,000.00
15 Sales person 3 Diploma in sales management 5,000.00 180,000.00
16 Finance head 1 Dip in Accounting 5,000.00 60,000.00
17 Accountant 1 Diploma in Accounting 5,000.00 60,000.00
18 Electrician 1 10+2 in general electricity 5,000.00 60,000.00
19 Cashier 1 10+2 in bookkeeping 3,000.00 36,000.00
20 Cleaner 4 Unskilled 3,000.00 144,000.00
21 Driver 2 10 completed 3,000.00 72,000.00
22 Gardner 2 Unskilled 2,500.00 60,000.00
23 Guards/Security 4 Basics 2,000.00 96,000.00
24 Helpers and laborers 214 10 completed 1,395.00 3,247,560.00
Grand Total 250 4,999,560.00
The organizational structure of the project is designed by including all the necessary personnel
under the right division. At the top of the organizational structure, there will be manager with the
responsibility of supervising the overall activity of the plant. Depending up on the nature of the
center and the amount of work to be performs; there exist auxiliary units under the general
manager.
Employees under each unit will be supervised by the department head that is accountable for the
general manager. General Manager is appointed by the owners.
Owner
General Manager
Executive
Secretary
Production
Department Admin & Finance Commercial
Department Department
Pre- Packing
treatment
Admin. & Financial
Inspection HRM
Marketing Sales
Fig: Organizational Structure
Hence the following section deals with the duties and responsibilities of some departments.
1. General Manager
Duties and responsibilities
She/he will plan, organize, direct and control the overall activities of the factory
She/he will devise policies and strategies that will enable the factory to be profitable.
She/he will incorporate modern technological innovation that will facilitate the service
delivery of the project center and increase customer’s satisfaction.
He/he will plan, organize, direct and control the human and non-human resources of the
plant so as to achieve the short and long run objectives of the organization.
2. The Manufacturing Department
Duties and responsibilities:-
It is the core department of the project center and has the following responsibilities.
Use modern manufacture, processing and technologies that will enhance the quality
of those products.
Produce quality product that will enable the center competent both in the domestic
and international market.
Use appropriate technology to manage its products.
Control on the quality of raw materials, inputs, quality of the product and also the
overall production process.
Produce products in least cost so that the profitability of the center is guaranteed.
Moreover control over the quality of the final products
3. Administration and Finance Department
Duties and responsibilities:-
Will plan, organize direct and control the financial transaction of the plant by using the
entire necessary document.
Will develop sound financial control system by developing modern financial control
systems.
Will prepare the annual financial statements and prepare condensed reports for the
general manager, owner and other concerned government body.
Will control the human and non human resources of the plant, which include: effective
handling of the different inventories of the machineries, equipments, raw materials,
finished products, and devise strategies of controlling against fraud and damage.
Manage and execute The promoter national and international procurement procedure
Administer and control The promoter logistic resource
Effectively administer the promoter Procurement process domestically as well as
internationally.
Manage the public relation of The promoter/factory with external parties/stakeholders
Provide and manage general supportive service to the plant.
4. Commercial Department
Duties and responsibilities:-
Will handle the overall marketing activities of the organization which include planning,
organizing, directing, and controlling.
Provide cost estimates in preparation for securing ...
Gather information on new product design, profile
Approval of new products profile & brand plan analyzes market research.
Plan and execute sales.
Will develop effective customer handling strategies
Will design and implement effective advertisement and promotion schemes
Will develop the marketing strategies for future project center’s development.
Conduct both foreign and domestic market research for expanding the sales of The
promoter
All workers have responsibilities on each activity they assigned for.
B. TRAINING REQUIREMENT
The production supervisor and skilled workers require few weeks training on machine operation
and production technology. Training is assumed to be entertained during the erection and
commissioning period and the cost is in built there and hence about Birr 25,000 is sufficient to
cover expenses associated with the training programmed.
The total cost of money that is required to estimated the envisaged modern construction materials
is to be birr 76,000,000.
1 Fixed Investment
1.1 Land, Building and Construction 22,000,000 0.00
1.2 Machines and Equipments 18,548,200 0.00
1.3 Vehicles and Motors 5,600,000 0.00
1.4 Office Furniture and Equipment 3,500,000 0.00
Total Fixed Investment Cost 49,648,200 0.00
No.
1 Aggregate filler 3
2 Weighing filler 3
3 Aggregate temporary 1
storage/hopper/filler
7 Compressor 2
4.1.3. Vehicles
SN Description Qty Unit Price Total Price(Birr) Remark
1 Pick Up model 20/21 1 2,200,000 2,200,000 Duty Free
2 Service Bus 2 1,300,000 2,600,000 Duty Free
3 Mini Bus 1 800,000 800,000 Duty Free
Total 4 800000
Total 14754000
Total 140000
B. Depreciation
Building…………………………………………………………………………….5%
Machinery and Equipment ………………………………………………………..15%
Office Furniture……………………………………………………………………20%
Vehicles ………………………………………………………………………..…..15%
C. Working Capital
Accounts Receivable…………………………………………………………….30 days
Raw material Local …………………………………………………………..…..30 days
Work in progress…………………………………………………………………5 days
0 0 0 0 53,200,000
Amount of
Rate of
values of Capital Depreciation
No Capital Assets depreciation
assets (Br.) estimated
(%)
(Br.)
Asset
Cash 3,551,800
Fixed Asset
Vehicles 5,600,000
Liability
Owner Equity
Capital 22,800,000
Based on the projected profit and loss statement, the project will generate a profit through
out its operation life. Annual net profit after tax will grow from Birr 11.13 million to Birr
11.20 million during the life of the project. Moreover, at the end of the project life the
accumulated cash flow amounts to Birr 133.27 million.
2. Ratios
In financial analysis financial ratios and efficiency ratios are used as an index or yardstick
for evaluating the financial position of a firm. It is also an indicator for the strength and
weakness of the firm or a project. Using the year-end balance sheet figures and other
relevant data, the most important ratios such as return on sales which is computed by
dividing net income by revenue, return on assets ( operating income divided by assets),
return on equity ( net profit divided by equity) and return on total investment ( net profit
plus interest divided by total investment) has been carried out over the period of the
project life and all the results are found to be satisfactory.
3. Break-even Analysis
The break-even analysis establishes a relationship between operation costs and revenues.
It indicates the level at which costs and revenue are in equilibrium. To this end, the
break-even point of the project including cost of finance when it starts to operate at full
capacity ( year 3) is estimated by using income statement projection.
BE = Fixed Cost = 27 %
4. Payback Period
The pay back period, also called pay – off period is defined as the period required to
recover the original investment outlay through the accumulated net cash flows earned by
the project. Accordingly, based on the projected cash flow it is estimated that the
project’s initial investment will be fully recovered within 7 years.
171-2
The internal rate of return (IRR) is the annualized effective compounded return rate that
can be earned on the invested capital, i.e., the yield on the investment. Put another way,
the internal rate of return for an investment is the discount rate that makes the net present
value of the investment's income stream total to zero. It is an indicator of the efficiency or
quality of an investment. A project is a good investment proposition if its IRR is greater
than the rate of return that could be earned by alternate investments or putting the money
in a bank account. Accordingly, the IRR of this porject is computed to be 19.28 %
indicating the vaiability of the project.
Net present value (NPV) is defined as the total present ( discounted) value of a time
series of cash flows. NPV aggregates cash flows that occur during different periods of
time during the life of a project in to a common measuring unit i.e. present value. It is a
standard method for using the time value of money to appraise long-term projects. NPV
is an indicator of how much value an investment or project adds to the capital invested. In
principal a project is accepted if the NPV is non-negative.
Accordingly, the net present value of the project at 8.5% discount rate is found to be
Birr 30.09 million which is acceptable.
D. ECONOMIC BENEFITS
The project can create employment for 32 persons. In addition to supply of the domestic
needs, the project will generate Birr 20.92 million in terms of tax revenue. The project
creates backward linkage with cement, gravel and sand producers and forward linkage
with the construction sector.