Professional Documents
Culture Documents
Assignment 3 Operational Planning - 1612497121
Assignment 3 Operational Planning - 1612497121
Name
Agency/Organization
OCD ID Number
Instruction(s):
1. Still refer to Rizal Earthquake Scenario and the accomplished ICS Form 201 from
Assignment 1. Also, read the scenario update in page 2.
2. Based on the information provided, plan for your tactical resources using ICS Form 215 in
page 3. Also, plan for the safety using ICS Form 215A in page 4. Accomplish both ICS
forms in the said pages. Use the Operational Period: 17 September 20xx, 0600H – 1800H.
3. Once accomplished, save the file using the filename template <Surname>_<Assignment
Number> (example: Dela Cruz_Assignment 3).
It is now 1500H in the afternoon on September 16. It has been over 24 hours since the
earthquake struck. Numerous aftershocks have occurred in the area and people in Rizal and
Bonifacio Province are uneasy and worried about the ongoing situation. The weather is fair, winds
17 kmh out of the southwest and temperature 28 degrees C.
Your IMT is now running and you have established an Incident Command Post (ICP) to oversee
and prioritize activities in the area. You continue to manage emergency response operations at the
Ridge School and in the barangays in the eastern part of Rizal.
There are 10 reported dead in the barangays and several missing persons in collapsed buildings
near the school.
At least 200 families have already been displaced. They require essential needs such as shelter,
medical care, and protection. Continuing education for the displaced children is required as well.
Electrical power is still out and utility crews have been requested to work to reestablish power and
communications.
Damage seems to be moderate to severe in the southern and eastern portions of Rizal.
Engineers have assessed the Central Highway Bridge over the Roaring River; it seems to be
structurally undamaged. However, the bridge at Main Street is damaged and out of service.
2
2. OPERATIONAL PERIOD
OPERATIONAL PLANNING WORKSHEET 1. INCIDENT/EVENT NAME
From (Date and Time):
ICS 215 To (Date and Time):
4. 7. 9. 10.
6. 8. SPECIAL
3. DIVISION 5. WORK OVERHEA REPORTIN REQUESTE
RESOURCE EQPT. AND
BRANC / GROUP / ASSIGNMENT D G D ARRIVAL
S SUPPLIES
H OTHERS POSITION LOCATION TIME
Required
Have
Need
Required
Have
Need
Required
Have
Need
Required
Have
Need
Required
Have
Need
Required
Have
Need
11.TOTAL RESOURCES Single Resource 14. PREPARED BY OSC
REQUIRED Name and Signature:
ST or TF
12. TOTAL Single Resource
RESOURCES ON ST or TF
HAND
13. TOTAL Single Resource Date Prepared: Time Prepared:
RESOURCES ST or TF
NEEDED TO
REQUEST
3
4
INCIDENT/EVENT SAFETY, RISK AND HEALTH ANALYSIS
ICS 215-A
1. INCIDENT/EVENT NAME 2. OPERATIONAL PERIOD
From (Date and Time):
To (Date and Time):