PROJECT G+4 Data Center SSIGW,Gumbo Juba South Sudan OPERATOR Hakki Kaya

CLIENT MGI Management GmbH,6030 Zug, Switzerland CHECKED BY Thomas Ware Jada
CONTRACTOR Andamangu General Construction & Trading Co.Ltd DATE 6-Aug-23

COMPRESSIVE
CUBE DATE GROSS MAX AGE OF STRENGTH
DATE FOR MODE OF CLASS
MARK CUBE SECTIONAL LOAD 'P' CUBE REMARKS
CRUSHING FALLURE OF MIX
NO. MADE AREA 'A' mm2 Kn (DAY) fc=(1000 𝑃)/( 𝐴
𝑁/𝑚𝑚2)
Vertical
1 28-Jul-23 6-Aug-23 22500 566.61 C/30 7 25.18 Retaining wall / Columns
Rapture

CONCRETE CUBES COMPRESSIVE STRENGTH TEST RESULTS


CONSULTANT CONTRACTOR

OPERATOR Hakki Kaya

CHECKED BY Thomas Ware Jada