GTR - General Transmittal N°: GTR-CEB-113-R0 Project N°: 97

To be filled by site-supervision:

Date received: 07/04/2021 DC CIV RE PM

- sds x -

Reply: A - Approved B - Approved with Comment C - Resubmit D - Reject

Comments: - Tilke approval/review does not constitute a change order and does not relieve the contractor of his obligations
under the contract.

- Work in confined space shall be done in line with the MOW and other local requirements.

- Permission to enter a confined space can only be given by a person who has received appropriate training and
is authorised to sign a confined space ‘Permit to Enter’.

- An adequate communication system is required to enable:


•Communication between people inside and people outside the confined space;
•Help to be summoned in an emergency;

- Considering constantly changing work environment of the construction project, emergency drills have to be
conducted more frequently.

Applivable Reference: -

Enclosures: -

(samples, data, test results, technical documentation, etc.)


Date replied: 26/04/2021 Name of representative: Mallmann, Joachim Signature:
Ass. Res. Eng.
Tilke GmbH & Co. KG