PLANNING AND DE

TO OPTIMIZE PRODUCTION ON WE

Data Sumuran JARWO-2 Data Produksi JARWO-2

TVD 1671 m Ps 1042


5482.28346 ft Pwf 380
MD 1671 m Qtest 418
5482.28346 ft Gross 425

POTENSI
Interval Perforasi 1568-1571 m Oil 62
1568 m Gas 0.8
TOP
5144.35696 ft Water 265
PERFORASI

1569.5 m Ptubing 300


MID
5149.27822 ft BHT 258
1571 m 718
BOTTOM
5154.19948 ft Twh 86
Casing Sgo 0.96
ID 6.276 inch Sgg 0.65
OD 7 inch Sgw 1.012
Tubing 33
Pour Point
ID 2.441 inch 91.4
OD 2 7/8 inch Pc 134

Menentukan Pb Parameter Lain

X -0.03608208 fw 0.810
Rs 79.41005147 fo 0.190
A 0.036082083 SG mix 1.0021406728
Pb 1066.011879 Gradien fluida 0.4339269113
Densitas oil 59.904
PLANNING AND DESIGN GAS LIFT
RODUCTION ON WELL "JARWO-2" FIELD "JARWO"

ksi JARWO-2 Data Reservoir Lapangan JARWO

psia
Layer Lithology
psia
STB A 100-1120 LIMESTONE
STB B 1120-1450 SANDSTONE
STB C 1492-1824 SANDSTONE
MMSCFD D 1950-2110 LIMESTONE
E 2215-2275 LIMESTONE
Psia
°F
°R
°F
15.89583

°C
°F
Psia
WO
PLANNING AND DESIGN G
TO OPTIMIZE PRODUCTION ON WELL "JA

INFLOW

Ps
Metode Vogel IPR dua fasa saat Ps < Pb
Pwf
Qtest
PI

q Qmax
PI  J 
(Ps - Pwf) Pwf (psi)
0
50
qo 100
q max  2 150
 Pwf  P 
1  0,2   0,8 wf  200
 Ps   Ps  250
300
350
  Pwf   Pwf 
2


qo  q max 1  0,2   0,8   400
  Ps   Ps   450
  500
550
600
650
700
750
800
850
900
1000
1042
PLANNING AND DESIGN GAS LIFT
PRODUCTION ON WELL "JARWO-2" FIELD "JARWO"

OUTFLOW

1042 psia
380 psia
418 STB
0.641994 bpd/psi
657.940 bpd

Q (STB)
657.940
650.413
640.463
628.090
613.292
596.070
576.425 GOR 12982.636 SCF/STB
554.355 GLR 2446.483 SCF/STB
529.862
502.945 Pressure Traverse
473.604 Pwh 300 psia 285.3
441.839 ID Tubing 2.441 ft
407.650 100
371.037 300
Q asumsi bpd
332.001 500
290.540 700
246.656 L Tubing 5094.357 ft
200.348 GLR 2446.483 SCF/STB
151.616
46.880
0.000
Pwf (psi)
Q (bpd) Tubing 2,441 in
Fw = 0,5 fw = 1
100 750 760
300 790 800
500 850 860
700 960 1000
2.853 100 psig
Pwf (psi)
Q (bpd) Tubing 2,441 in
Fw = 0,81
100 756.2
300 796.2
500 856.2
700 984.8
IPR
1100

1000

900

800

700

600
IPR
Pwf, psi

TPR
500

400

300

200

100

0
0.000 100.000 200.000 300.000 400.000 500.000 600.000 700.000 800.000

Q, STB
PLANNING AND DESIGN GAS LIFT
TO OPTIMIZE PRODUCTION ON WELL "JARWO-2" FI

Rs 79.41005
GOR 12982.64 scf/stb
GLR 2446.483 scf/stb
PI 0.641994 stbd/psi
WC 0.810398
BHT 258 F
DEPTH 5482.283 m
PRODUKTIVITAS 425 STB
DESIGN GAS LIFT
WELL "JARWO-2" FIELD "JARWO"
PLANNING
TO OPTIMIZE PRODUCTION

Data Produksi JARWO-2 Menentukan Q optimu

Ps 1042 psia
Pwf 380 psia Pwf
Qtest 418 STB Q Fw = 1
Gross 425 STB GLR = 800
POTENSI

Oil 62 STB 200 1120


Gas 0.8 MMSCFD 400 1040
Water 265 600 1200
Ptubing 300 Psia 800 1120
BHT 258 °F
718 °R Pwf
Twh 86 °F Q Fw = 0.
Sgo 0.96 15.89583 GLR = 800
Sgg 0.65 200 1040
Sgw 1.012 400 1040
33 °C 600 1120
Pour Point
91.4 °F 800 1100
Pc 134 Psia
Pwf
Q Fw = 0.8
Data Sumur
GLR = 800
TVD 1671 m 200 1089.6
5482.2835 ft 400 1040
MD 1671 m 600 1169.6
5482.2835 ft 800 1112.4
1568 m
TOP
5144.357 ft Q optimum 415
PERFORASI

1569.5 m GLR 1500


MID
5149.2782 ft Pwf 590
1571 m
BOTTOM
5154.1995 ft
PLANNING AND DESIGN GAS LIFT
OPTIMIZE PRODUCTION ON WELL "JARWO-2" FIELD "JARWO"

Menentukan Q optimum Pressure Traverse


Pwh
ID Tubing
Pwf
Fw = 1
Q asumsi
GLR = 1000 GLR = 1200 GLR=1500 GLR = 2000
960 800 560 160
880 720 480 80 L Tubing
1040 880 640 240 GLR
1040 960 840 640

Pwf
Fw = 0.5
GLR = 1000 GLR = 1200 GLR=1500 GLR = 2000
880 720 480 80
960 880 760 560
1040 960 840 640
1040 980 890 740

Pwf
Fw = 0.81
GLR = 1000 GLR = 1200 GLR=1500 GLR = 2000
929.6 769.6 529.6 129.6
910.4 780.8 586.4 262.4
1040 910.4 716 392
1040 967.6 859 678

bpd
SCF/STB
psi
Pressure Traverse
300 psia 285.3 2.853 100 psig
2.441 ft
200 800
400 1000
bpd
600 GLR asumsi 1200
800 2000
5094.357 ft 3000
2446.483 SCF/STB
a
IPR
1300

1200

1100

1000

900

800
770 IPR
700 GLR 800
GLR 1000
Pwf, psi

GLR 1200
600 GLR 2000
GLR 1500
500

400

300

200

100

270
0
0.000 100.000 200.000 300.000 400.000 500.000 600.000 700.000 800.000 900.000

Q, STB
TO OP

Q optimum 270 bpd 1. Menentukan garis DFL


GLR 1200 SCF/STB Depth (ft) Pwf (psi)
Pwf 770 psi 5094.357 770
L tubing 5094.357 ft 3320.163407 0
Pwh 300 psi
Sg Gas 0.65 2. Menentukan Garis Pko
Gradient Injeksi 0.007 dr tabel Depth (ft) Pko (psi)
Gradien Fluida 0.434 0 730
SG Mix 1.00214 5094.357 765.660498688

3. Menentukan Garis Pso


Depth (ft) Pso (psi)
0 630
5094.357 665.660498688

4. Menentukan POI
Depth (ft) P (psi)
4579.5852535 460

5. Menentukan POB
Depth (ft) P (psi)
4810 660

6. Menentukan Garis Pwh


Depth (ft) P (psi)
0 300
4579.5852535 460

7. Menentukan Kedalaman Valve


Depth, ft
dv1 760.369
dv2 1459.526
dv3 2102.401
dv4 2693.523
dv5 3237.059
dv6 3736.840
dv7 4196.387

8. Menentukan Garis Tiap Valve


Depth (ft)
0
dv1
760.369
760.369
dv2
1459.526
1459.526
dv3
2102.401
2102.401
dv4
2693.523
2693.523
dv5
3237.059
3237.059
dv6
3736.840
3736.840
dv7
4196.387
PLANNING AND DESIGN GAS LIFT
TO OPTIMIZE PRODUCTION ON WELL "JARWO-2" FIELD "JARWO"

asumsi

GU 0.034937661632

aman Valve
Pvo (tekanan buka tubing), psi P tubing, psi
735.323 326.566
640.217 350.992
644.717 373.453
648.855 394.105
652.659 413.095
656.158 430.556
659.375 446.612

Tiap Valve
P (psi) Depth (ft) P (psi)
300 760.369 326.566
735.323 760.369 735.323
326.566 1459.526 350.992
640.217 1459.526 640.217
350.992 2102.401 373.453
644.717 2102.401 644.717
373.453 2693.523 394.105
648.855 2693.523 648.855
394.105 3237.059 413.095
652.659 3237.059 652.659
413.095 3736.840 430.556
656.158 3736.840 656.158
430.556 4196.387 446.612
659.375 4196.387 659.375
T
" FIELD "JARWO"
VALVE DEPTH CURVE
Pressure (psi)
0 100 200 300 400 500 600 700 800 900
0.000 Pwh Pso Pko

1000.000

2000.000

3000.000
Depth (ft)

Pwf

4000.000

5000.000
POI

4810 ft POB

6000.000

660 psi