HYDROLOGICAL DATA
Stream Mainstrea Highest Catchment Tc (hrs) =
Catchment Catchment Start End Lowest Change in
Crossing m Length Contour slope 58.5 L /( 60 Remarks
No. area (km2) Chainage Chainage Contour (m) height (m)
Chainage (km) (m) (m/km) * A0.1*S0.2)
HYDROLOGICAL ANALYSIS
Rainfall Intensity (mm/hr) Max. Runoff Vol. (m3/s)
Stream End Catchmen Area Coefficient
Catchment Start Return Return Return t Corrected Return Return
Crossing Chainage Tc(hrs) Reduction of Runoff,
No. Chainage Period =25 Period Period =100 Area Return Period Period
Chain. (km) ( km ) Area(km2) Factor C
years =50 yrs yrs Period =25 =50 =100
1 8+700 9+720 11+300 21.56 4.74 5.2 5.7 412.737 0.617 254.658 0.4 134.1 147.3 161.6