Pipe, Hu To RR BK Hose, L: Maru-A Parts Monthly Data Date: Part Name: Supplier Name: Part Number: Date of Issue: June, 23
Pipe, Hu To RR BK Hose, L: Maru-A Parts Monthly Data Date: Part Name: Supplier Name: Part Number: Date of Issue: June, 23
23
Vernier
Flaring Size Caliper/P.Projecto n=5/Lot / / / / / / / / / / / / / / / / O / / / / / / / / / / / / /
r
Sample Date
Sr.#. Description Standard Qty Method Result Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
APPEARANCE
3
Air Cleaning of pipe at 80 100% / / / / / / / / / / / / / / / / O / / / / / / / / / / / / / Air Gun OK
Pressure psi
Date : 15.02.23
Inspection Sample Units mm
Sr.No. Standard Tool Frequency
Items 1 2 3 4 5 Remarks
Appearance Section
No Burr, No Crack, No
i Scratch,Surface OK
Appearance Finishing Visual
1 flaw or adhesion of
ii foreign particles OK
According to
3 Resin Covering
Drawing Visual OK
Should be apply to
4 Preton Oil Application OK
both ends
Dimension Section
5 Tube Dia 4.68~4.84 VC 4.76 4.77 4.75 4.78 4.72 OK
6 A 6.6~7.1 VC 5 Psc Per Lot 6.89 6.92 6.88 6.97 6.9 OK
First 2 pcs,
7 B 3.0~3.7 VC Middle 1 pc, 3.39 3.43 3.47 3.40 3.33 OK
8 C 1.2~1.6 VC Last 2 pcs 1.39 1.32 1.41 1.39 1.42 OK
9 Thickness T 0.7±0.08 VC 0.77 0.72 0.76 0.77 0.74 OK
10 Degree 90±30' 90.14 - - - - OK
1 Piece
Per Lot
AA AD
Y
Z AC b a
X
V
T
D
F AB
B W
H
K M
O P
S c
R
A
I Q
J N
L
LOCAL LOCAL LOCAL LOCAL LOCAL
SAMPLE 1 SAMPLE 2 SAMPLE 3 SAMPLE 4 SAMPLE 5
Sr. No. CHECKING ITEM INSTRUMENT STD
ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL JUD
BLOCK B
BLOCK C
BLOCK D
BLOCK F
BLOCK H
BLOCK I
BLOCK J
BLOCK O
BLOCK P
BLOCK R
BLOCK T
BLOCK V
BLOCK W
BLOCK Z
BLOCK AA
BLOCK AB
BLOCK AC
INSPECTED BY :