ISARC - 2017 - Paper - 61 ALEJANDRO 5
ISARC - 2017 - Paper - 61 ALEJANDRO 5
ISARC - 2017 - Paper - 61 ALEJANDRO 5
net/publication/318084667
CITATIONS READS
15 2,819
3 authors, including:
Some of the authors of this publication are also working on these related projects:
All content following this page was uploaded by Tarek Salama on 01 July 2017.
Start
BIM
Modelling
Pull
Onsite & Quantity Productivity
Offsite tasks Takeoff Rates
Probabilities
Resources
Activities Project
demands and
Sequence Database
Availabilities
Draw LSM
Schedule
Resolve resources
conflicts
Update
Is start date, N resources &
finish date ok? productivity
rates
Y
Identify Critical
Segments
Offsite
Construction
Baseline Schedule
Offsite construction
baseline schedule
SD OLB (AG) = FDOLB (AG) + DLBT SD OFB (AG) = FD OLB (AG) + DLBT
Resolve resources
conflicts
Identify critical
activities for onsite
schedule
Variability of activities
before CCP shifting
CCP?
Assign Project
buffer for overall
schedule
(onsite+offsite)
Baseline schedule
for overall
Construction
End
Time
(3)
Onsite
(4)
DLB
T
Where,
CCP DP (CL): safe duration of critical activity with given
Figure 6. Identifying CCP for the scenario of confidence level “CL”.DP (AG): aggressive duration of
transporting panels by batches. critical activity with 50% confidence level.
(5)
B
Repetitive Units
A Work break
C D E F
LT =2 Time (days)
Units
PB
schedules. The integration framework between LSM of
offsite and onsite construction activities mimics the
repetitive nature of manufacturing processes and onsite
activities while considering uncertainties associated
with productivity rates. Automating the presented
Offsite method provides an easy to use planning and scheduling
tool for synchronizing offsite and onsite schedules
without using simulation. The overall integrated
DLB
Time schedule is expected to assist project manager in
T CCP
planning onsite construction activities while considering
the manufacturing plan of offsite activities and vice
versa. Example application is described to highlight the
essential features of the developed method.
Onsite
References
[1] Modular Building Institute (MBI), (2016).
Modular Advantage for the commercial modular
OAB
FB FB OPB construction industry, 59 pages, Virginia, USA.
[2] Southern, J. 2016. Smart Construction: The
value in offsite construction. Report by KPMG.
[3] Schoenborn, J. M. (2012). A Case Study
Figure 9. Adding feeding and project buffers. Approach to Identifying the Constraints and Barriers
to Design Innovation for Modular Construction.
Master of Science in Architecture, Faculty of the
Virginia Polytechnic Institute and State University.
4. Conclusion
[4] Lutz, J. D. (1990), Planning of Linear
This paper presented a novel method for integrating the Construction Projects using Simulation and Line Of
linear schedules of offsite and onsite modular Balance, Ph.D. Thesis, Purdue University, West
construction, supported by a graphical representation Lafayette, USA.
that depicts the interactions between offsite and on site [5] Yang, I. (2002), Repetitive Project Planner
schedules. The developed method introduces new Resource-Driven Scheduling for Repetitive
systematic procedure for identifying the critical control Construction Projects, Ph.D. Dissertation, University
point (CCP) that inter-connects offsite and onsite linear of Michigan, Ann Arbor, USA.
34th International Symposium on Automation and Robotics in Construction (ISARC 2017)